| 1 | Dismentalling of Old Brick/ Tiles Work/ Rubble Masonary/ Pitching/ e.t.c by manual means (PWD SOR 2025-26, Chapter-10, SI No. 3 ) |
| 2 | Excavation in foundation in ordinary soil or silt (loam, clay or sand) including lift upto 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30m from the foundation trenches. (PWD SOR 2025-26, Chepter-4, Item No.01 Spec- 251 ) |
| 3 | Providing and laying cement concrete in 1:4:8 (1 cement: 4coarse sand :8 graded stone aggregate 40mm norminal size ) including supply of all materials, labour and T&P etc. (PWD SOR 2025-26 Chapter No-06 SI No. 3 Spec. No. 4.1) |
| 4 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.1). |
| 5 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWD SOR 2025-26, Chapter-5, Item No.11 Spec. no. 5.2) |
| 6 | M-15 Brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (SOR/ PWD 2025-26 Chapter No. 6 SI No. 2). |
| 7 | Reinforced cement concrete work in beams, lintels, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth level up to floor five level, including cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). (PWD SOR 2025-26, Chapter-5, Item No.12) |
| 8 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWD SOR 2025-26, Chapter-5, Item No.11) |
| 9 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. .(As per Analysis) |
| 10 | M-150 ( Non Modular) Brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work add extra to item No.1 to 4 above for super structure above plinth level upto floor five level including necessary cutting and moulding of brick work as required and also including honey combed brick work in thickness of wall more than 12cm( PWD SOR 2025-26, chapter-5, SI No. (2+5) |
| 11 | 12 mm thick plaster with cement mortar in proportion of 1:4 cement & fine sand ( Dholpur sand Not less than in 1.25 FM) of single coat for interior plastering upto floor two level...... All complete.(PWD/SOR 2025-26 Chapter No-07 SI No. 2) |
| 12 | Providing and laying cement concrete in 1:2:4 (1 cement: 2coarse sand :4 graded stone aggregate 20 mm ............... All Complete.(PWD SOR 2025-26, chapter No.-5 SI No.-7) |
| 13 | Finishing walls with putty approved brand and manufacture and of required shade on undercoated wall surface to give even shade over including curing etc. all complete. (PWD SOR chapter No. 8 ,SI. No. 31) |
| 14 | Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade onundacorated wall surface to give even shade over @ 1.25Ltr/10sqm including one coat of primer applid @0.75Ltr/10sqm coat curing and cost of all material, labour, T&P etc. required for proper completion of work.for two coat. (PWD SOR chapter No. 8 ,SI. No. 35) Please Enable Macros to View BoQ information |