| 1 | Safe loading Carriage including unloading and proper stacking of following materials from central store Barabanki to site of work. |
| 2 | PCC Pole 8.5 MTR |
| 3 | PCC Pole 9 MTR |
| 4 | Top Channel |
| 5 | T-off Channel |
| 6 | Disc Insulator |
| 7 | Stay Set Complete |
| 8 | Earthing Complete |
| 9 | GI wire 8 SWG |
| 10 | LT ABC (3X95+1X70+1X16) SQMM |
| 11 | LT ABC (3X50+1X35+1X16) SQMM |
| 12 | Single Core L.T Cable (1X120)SQ MM |
| 13 | Single Core L.T Cable (1X240)SQ MM |
| 14 | Single Core L.T Cable (1X400)SQ MM |
| 15 | ACSR Dog Conductor |
| 16 | ACSR Weasel Conductor |
| 17 | 11 KV Polymeric Pin Insulator with Pin |
| 18 | Dropper Channel |
| 19 | Danger baord Barbed wire including jumper |
| 20 | 11/0.4 Kv T/F 100 Kva |
| 21 | 11/0.4 Kv T/F 250 Kva |
| 22 | T/F 63 KVA |
| 23 | T/F 25 KVA |
| 24 | 11 KV XLPE CABLE 3X70 SQ MM |
| 25 | Cable Jointing Kit I/D Type for 3*70 Sq mm Cable |
| 26 | Cable Jointing Kit O/D Type for 3*70 Sq mm Cable |
| 27 | Stone pad 300x300x75mm |
| 28 | Clamps for LT T-off with bolts & Nuts |
| 29 | MS angle 75x75x6x2028mm with clamp & bolt and nut (T/F base) |
| 30 | 11 KV TPMO |
| 31 | LT incoming panel with metering equipmemt, Fuse & fixing arrangement (LS) |
| 32 | LT PVC Cable 4x16 sq mm |
| 33 | LT PVC Cable 3.5x70/35 sq mm |
| 34 | Dragging of pole from Store to site |
| 35 | Grouting of Pole in depth of 1/6th the length of pole in ratio 1:4:8 in cement sand and brick ballast and construction of pole plinth 300mmx45mm above ground level in 1:2:4 in cement, coarse sand and stone grit as per respo norms. |
| 36 | Erection of Stay set of 16x1800 mm rod duly painted with red oxide,anchor plate, thumble turn buckle and stay insulate etc. digging of pit of size of size 0.4x0.6x1.6 m for grouting 1:3:6 cement concrete, with stay of size 7/8 SWG, nuzzling & Grouting. |
| 37 | Installation of Mounting of Following capacity of Transformer including its connection between 11 KV and LT Line mounting provinding Crimping type Aluminium lugs of required size.( All the material except transformer will be arranged by the contractor) |
| 38 | Mounting of 25 KVA Tranformer |
| 39 | Mounting of 63 KVA Tranformer |
| 40 | Mounting of 100 KVA Tranformer |
| 41 | Mounting of 250 KVA Tranformer |
| 42 | Stringing and sagging of 11 KV line with ACSR Weasel Conductor including nuzzling binding and jumpering (Rabbit conductor will be provided by the department) |
| 43 | Stringing and sagging of 11 KV line with ACSR Dog Conductor including nuzzling binding and jumpering (Rabbit conductor will be provided by the department) |
| 44 | Errection of Substation type double pole with PCC including mounting of Top Channal Dropper Channel, base angle with clamps with nut & bolt 33/11 KV line including grouting of support and plinthing 300 mm above ground level, fitting of 33/11 KV pin & Pin insulator. 1/6 of total lenght of poles will remain under the ground and planted on stone pad of Size 300x300x75 MM. |
| 45 | Erection of single PCC Pole for Stringing and sagging of conductor 1/6 of total length of poles will remain under the ground and planted on stone pad of size 300x300x75 mm. |
| 46 | Stringing and Sagging of LT single core Cable (1x400+1x240+1x120) SQMM (Cable will be provided by the department) |
| 47 | Stringing and Sagging of LT ABC Cable (3*120+1*95+1*16) & (3*95+1*70+1*16) and (3*50+1*35+1*16) SQMM (Cable will be provided by the department) |
| 48 | Laying of 11 kv XLPE Cable AL. 3x70 Sq.MM by HDD Method/Manually (All the material required for laying will be supplied by the contractor except 11 kV XLPE cable) |
| 49 | Hosting of 11 kv XLPE Cable AL. 3x70 Sq.MM on DP with GI pipe 6\\" its Jumpring complete with clamps, nut and bolts. (All material will be Provided by the contractor except 11 kv cable & O/D J/K. as per RESPO NORMS. |
| 50 | Fixing of Cable Jointing Kit I/D Type for 3*70 Sq mm Cable |
| 51 | Fixing of Cable Jointing Kit O/D Type for 3*70 Sq mm Cable |
| 52 | Earthing of Pole with MS Earthing Rod. |
| 53 | Provinding & Fixing of various type materials. All materials shall be supplied by the contractor. |
| 54 | LT Clamp |
| 55 | EYE Hook |
| 56 | Dead End Clamp |
| 57 | Suspension Clamp |
| 58 | Supply and Errection of HT fuse set and other petty items etc. |
| 59 | Supply and Errection of LT fuse set and other petty items etc. |
| 60 | Nut & bolts |
| 61 | PG Clamp free size for ACSR condoctor |
| 62 | 11 KV Fuse set |
| 63 | Clamp for TOP/DROPPER/T-OFF/ETC. |
| 64 | Holding Clamps for top channel TPMO & Fuse set etc. with bolts & nuts. |
| 65 | Copper L-piece 50x225x10mm (LS) |
| 66 | Al Lug 95 sq mm |
| 67 | Al Lug 240 sq mm |
| 68 | Al Lug 400 sq mm |
| 69 | Erection of pipe type earthng for DT with the help of B-Class G.I pipe of size 1.5 inch dia, 60 feet deep boring by providing G.I strip 50x6 MM, 6 meter long attached with clamp L-piece nut & bolt & G.I cap |
| 70 | T/F FENCING 250 KVA wir emess fencing of 11/0.4 KV substation shall be made rectangular off size as nper site requirement not exeeding 3 meter fabrication 45x45x5 mm angle material shall be supply by contracter |
| 71 | T/F PLINTH 250 KVA plinth construction 2x2x1.5 meter with brick cement etc filling wth the sand in the hollow space plastring , 2 No MS channel on the top of plinth for placement of tranceformer , |
| 72 | Construction of LT DistriBution Cum LT Protection Piller Box MS Angle in Rectangle Size 50x50x6 MM 7.5 Meter long For installation Of Henley Type Tailleness Fuse Unit 300 AMP 650 Volt For 3 nos Outgoing Circuits With 4 Nos. Copper Bus bar OF size 1000x50x6 mm Including Proper Grouting of Structure By Digging of pits Off Size 300x300x600 mm With the Help Of Cement, Coresand And Aggregate in the ratio 1:3:6 And Fabrication of structure Complete. Please Enable Macros to View BoQ information |