| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting excetra complete. - (Lift upto 1.5 metre) By Manual MeansItem / Page No : 1 / 153Specification No : Bd.A.1Spec. Page No : 259 |
| 2 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete.Item / Page No 38/118 :Bd.A. 12 Page One Number 264 |
| 3 | Providing and laying Cast in situ/Ready Mix, cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailling out water, formwork, laying/ pumping, compacting and curing, excetra complete, with fully automatic micro processor based Programmable Logic Controller with Supervisory Control and Data Aquisition enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) excetra complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed, excetra)Item / Page No : 1 / 175Specification No : Bd.E.1Spec. Page No : 287 - 288 |
| 4 | Providing and fixing in position thermo mechnically treated FE-500 steel bar reinforcement of various dias for reinforced cement concrete pile caps, footings, foundations, slabs, beams, columns, canopies, staircases, newels, chajjas, lintels, pardis, copings, fins, arches, excetra as per detailed designs, drawings and schedules including cutting, bendding, hooking the bars, binding with wires or tack welding and supporting as requied complete.Item / Page No : 33 / 139Specification No : Bd.F.17Spec. Page No : 306 |
| 5 | Providing and laying Cast in situ / Ready Mix cement concrete M-20 of trap / granite /quartzite/ gneiss metal for bed blocks, foundation blocks and such other items including bailling out water, plywood / steel formwork, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing, excetra complete. The cement mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin, excetra (Wooden centering will not be allowed.)with fully automatic micro processor based Programmable Logic Controller without Supervisory Control and Data Aquisition enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) excetra complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) (using ARTIFICIAL SAND).Item / Page No : 10 / 176Specification No : Bd.E.4, B-7Spec. Page No : 289-290, 38-40Additional Specifications : 1. With additional specifications for controlled concrete. 2. If artificial / VSI crushed sand is used instead of natural sand; terms, conditions and specifications mentioned in Circular by Chief Engineer, Public Works Region, Pune bearing No CEP/D-2/Buildings-2/5940/2017 dated 17/10/2017 and Annexure-I attached to it and also Circular by Chief Engineer, Public Works Region, Nagpur bearing No 36 dated 15/01/2019 and Annexure-I attached to it will be appicable. |
| 6 | Supplying reinforced cement concrete pipe 450 milimetre diameter (NP3) 2.5 metre long at the site of workItem / Page No : -- |
| 7 | Laboratory testing charges for various materials required for items of work, on the basis of testing frequency and charges fixed by Vigilence and Quality Control Circle, Pune.Item / Page No : 4 / 0 |
| 8 | Royalty charges for various building construction bonafied materials which are used for government bonafied works and for which Royalty charges are to be paid by the contractor. (This Item is to be paid to the contractor only after he pays the Royalty amount to Revenue department and produces the required voucher.)Item / Page No : 3 / 0 |
| 9 | Add insurance 0.50%Non-Dsr ItemAdditional Specifications : The work shall be carried out as per the instructions of Engineer in-charge. |
| 10 | Add G.S.T. 18%Non-Dsr ItemAdditional Specifications : The work shall be carried out as per the instructions of Engineer in-charge. Please Enable Macros to View BoQ information |