|
| 1 | Excavation for pipe trenches in earth soils of all types of sand.gravel & soft murum including removing the excavated material up to a distance of 50 M & lift as below stacking & spreading as directed normal de watering preparing the bed for foundation excluding back filling etc complete Lift 0.00 to 1.50 m |
| 2 | Excavation for foundation /pipe trenches in hard murum and boulders WBM road including removing the excavated material up to a distance of 50 m and lifts as below, stacking & spreading as directed normal dewatering preparing bed for foundation excluding backfilling etc complete. |
| 3 | Excavation for pipe trenches in soft rock old cement & lime masonry foundation as including removing the excavated material up to a distance of 50 m. beyond the area & lifts as below stacking, spreading as directed. normal de watering preparing bed excluding back filling etc. |
| 4 | Excavation for pipe trenches in hard rock and concrete road by chiseling, wedging, line drilling by mechanical means or by any other means other than blasting including trimming and leveling the bed, removing the excavated material up to a distance of 50 m and lifts as below stacking as directed, normal de watering excluding back filling etc complete |
| 5 | Filling in plinth & floors murum bedding in trenches with approved murum from excavated materials from excavated material from foundation 15 cm s to 20 cm s layers including watering & compaction etc complete |
| 6 | Providing and supplying and hydrauluc testing in standard lengths. Polyethelene Pipes, confirming to IS 4984/14151/12786/13488 with nesessary jointing matenal like mechanical connectore thread/insert joint/quick release coupler joint /compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges. loading/unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete90 mm 6 Kg/cm2 |
| 7 | Providing and supply of Electro Fusion Fittings in accordance with BS EN-12201/Part-3 suitable for drinking water within black/ blue colour manufactured from compounded PE-80/PE-100 virgin polymer and compatible with PE-80/PE-100 pipes, in pressure rating SDR11 with PE-80/PE-100 pipes, in pressure rating SDR11 with min PN 12.5 rated for water application and shall be inclusive of all cost such as testing, all taxes related to central, state and municipal, inspection charges, transportation upto site, transit insurance, loading, unloading, stacking, etc. complete.Couplers 90 |
| 8 | End cap 90 |
| 9 | LNPE 90 |
| 10 | Providing double flanged Sluice Valves conforming tolS-2906/14846 including worm gear arrangements as per test pressure, stainless steel spindle, caps, including all taxes, Lowering, laying & Jointing testing etc |
| 11 | Refilling the trenches with available excavated stuff with soft material first over pipeline & then hard material in 15 cm. layers with all leads and lifts including consolidation surcharging etc |
| 12 | Shifting of connection on new distribution line including all PipeExcavationA) Ferrule Tapping Tee 90x1/2\\" (Rs.439)B) Male Adapter 20x1/2\\" (Rs.66)C)Ferrule (Rs.350) Market RateD) Female Adapter 20x1/2\\" (Rs.70)MDPE Pipe 20 mm Dia. Providing & Laying Please Enable Macros to View BoQ information |