| 1 | Dismantling one damaged LT PSC/RCC pole afterdisconnecting stays, strut etc. attached thereon andstacking the same. |
| 2 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 3 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 4 | Transporting one LT PSC pole by Hand cart - (normally limited to 4km (excluding loading and unloading). |
| 5 | Providing Strut using LT PSC pole including diggingand back filling pit in ordinary soil. |
| 6 | Providing Stay for LT poles including digging & backfilling pit in ordinary soil. |
| 7 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. |
| 8 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. |
| 9 | Providing Fly stay for LT pole using LT PSC poleincluding digging and back filling pit in ordinary soil. |
| 10 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 11 | Fitting one No. Section fuse on LT line with droppingcables, crimping sockets, connecting with bolt & nutetc. |
| 12 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 13 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 14 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of standard size |
| 15 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 16 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 17 | Erection of suspension clamp for LT ABC of any size |
| 18 | Installation of Pre-insulated straight through joints for70sqmm cable |
| 19 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 20 | Stringing of 1.1 kV Aerial bunched cable of size 1 x 25 + 1 x 25 sqmm with bare/insulated Messenger through existing poles |
| 21 | Installation of Pre-insulated straight through joints for16sqmm cable |
| 22 | Installation of Pre-insulated straight through joints for50sqmm cable |
| 23 | Transporting poles by hired vehicle to a distance upto5km and carrying upto 4 numbers of poles excludingloading& unloading charges. |
| 24 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. Please Enable Macros to View BoQ information |