| 1 | Flexible Median Marker as per IRC 79:20:19 Flexible Median Marker (FMM) should be used for improving median visibility during dark hours. Use of Median Marker provides safety against collision happening with medians during night time, or serve whether. Flexible Median Markers shall be provided with fluorescent Yellow colour retro reflective sheeting type XI as per IRC 67, flexible Median Marker shall be of tough high impact resistant injection molded thermoplastic body with property of flexibility to provide high durability and U shape structure having rebound, bounce back property the sheeting shall be type XI confirming to IRC 67 and it should be own both the faces whereby providing maximum reflectivity at I, anger distance with adequate durability The logo of the manufacturer shall be embossed on either side of the body during the injection molding process FMM shall be fixed by a combinitation of apoxy adhesive and grouting drilling on concrete Median of properly constructed solid medians. Height. The marker height shall be a median of 180mm, width 120mm and body thickness 6.5mm, the shanks shall not be less than 20mm and depth shall not be less than 30mm reflective area shall not be less than 90cm square proof of the same report shall be uploaded which quoting tender. |
| 2 | Solar Power Road Marker ( Solar Studs) The solar Studs shall be Made of Aluminium alloy and poly carbonate Material Which shall be Absolutely weather resistant and strong enough to support a load of 13,635 kg tested in accordance with ASTMD4280, its Colour may be white, Red, Yellow, Green or blue or Combination as directed by the Engineer. its water resistance shall meet the requirement of IP 65 in Accodance with IS:12063:1987 Category 2 for protection against water ingress. the Dimension of Solar Studs shall not be Less than 100 mm X 100 mm x 10 mm. It Flashing rate Shall not be less than 1Hz. Its Should be Able to Give the Prescribed Performance in the temperrature range of -40'C to 55\\"C. Its Life shall be not less than 3 Years. The rate shall include all materials, labour, Equipment, Fabrication, Transpotation, Erection, Installation and incidents all Complete as per Direction of the Engineer-in-Charge. |
| 3 | Providing and applying cold plastic paint two component rolled on surfacing material solvent free, high build two pack seamless, tough, skid resistant, material with has property of attaining 2.0 mm thickness in single coat application white (or as required colour) based on glass and colour retaining acralic cross linking resin system for coloured road surfacing including reflectorising glass beads @ 250 gms per sqm area. Thickness of 2mm is exclusive of surface applied glass beads as per IRC:35 The finished surface to be level, uniform and free from streaks and holes, Rates are inclusive of all taxes, royaity etc. all T&P/ machine material and labour required for proper completion of work. including cleaning and cost of all material etc. complete. (All inclusive on bitumen or concrete surface) work shall carried out as per IRC 35 2015 Cluase 2.2) |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 5 | Providing and laying bitumen mastic wearing course (as per specifications) with industrial bitumen of grade 85/25 conforming to IS : 702, prepared by using mastic cooker and laid to required level and slope, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of approved size at the rate of 0.005 cum per 10 sqm and at approximate spacing of 10 cm centre to centre in both directions, pressed into surface protruding 1 mm to 4 mm over mastic surface, including cleaning the surface, removal of debris etc. all complete. (Considering bitumen using 10.2% as per MORTH specification). Please Enable Macros to View BoQ information |