| 1 | Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Bahraich to the work site/dump site. All the material at Sl. No. 1 shall be given by department and rest all the material including civil material will be arranged by the contractor itself. Any other material if required for completion of work which might not have been mentioned in bid document, shall be arranged by the contractor. (De-Centralized Items Provided by the Contractor as per Estimate). |
| 2 | Cartage of PCC Pole 8.5 Mtr. long |
| 3 | Safe Carriage of 25 KVA T/F |
| 4 | Safe Carriage of 63 KVA T/F |
| 5 | Safe Carriage of 100 KVA T/F |
| 6 | Safe Carriage of 250 KVA T/F |
| 7 | Carriage of AB Cable 3x95+1x50+1x16mm2 |
| 8 | Carriage of AB Cable 3x120+1x95+16mm2 |
| 9 | Cartage of LT PVC Cable 3.5x150/70sqmm |
| 10 | ACSR Weasel Conductor |
| 11 | Earthing |
| 12 | 11 KV TPMO |
| 13 | 11 KV Fuse Set |
| 14 | Carriage of Other line material |
| 15 | Erection workMinium depth of laying from ground surface to the top of cable as per IS is-i) Low Voltage (1.1 KV) and Control Cable - 0.75 Mtr.ii) 3.3 KV to 11 KV Cables - 0.90 Mtr.iii) 22 KV to 33 KV Cables - 1.05 Mtr.iv) Cables at Road Crossing - 1.00 Mtr. v) Cables at railway level crossings (measured from bottom - 1.00 Mtr.of sleepers to the top of Pipe)Note 1) - The depth may be increased but not more than 1.6 M2)- The standard depth and width for laying the cable are also attached (as per letter No. 561/Director(Tech.)/MVVNL/Camp/Dt. 09-01-26 561 with the tender form. |
| 16 | Erection of Single PCC Pole (8.5 Mtr Long) for 11 KV/HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 17 | Erection of Double PCC Pole (8.5 Mtr Long) for 11 KV/HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 18 | Cartage, Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
| 19 | Earthing Complete as per RESSPO Norms. |
| 20 | Pipe/Boring Type Earthing as per RESSPO Norms. |
| 21 | Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely. All required materials shall be provided by the contractor at his own cost. |
| 22 | Errection & Commissioning of AB cable 3x95+1x50+1x16mm2 including fitting of Accessories (All Accessories shall be Provided by the Contractor). |
| 23 | Errection & Commissioning of AB cable 3x120+1x95+16mm2 including fitting of Accessories (All Accessories shall be Provided by the Contractor). |
| 24 | Laying & Commissioning of LT PVC Cable with Complete as per respo norms. |
| 25 | Jumpering & Mounting of 25 KVA T/F with complete fitting. |
| 26 | Jumpering & Mounting of 63 KVA T/F with complete fitting. |
| 27 | Jumpering & Mounting of 100 KVA T/F with complete fitting. |
| 28 | Jumpering & Mounting of 250 KVA T/F with complete fitting. |
| 29 | Fixing of 11 KV TPMO |
| 30 | Fixing of 11 KV Fuse Set |
| 31 | Cartage & Fixing of Distribution Box as per respo norms |
| 32 | Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required). |
| 33 | (Decentralized Items Provided/Fixing/Erection/Installation/Laying by the Contractor as per Respo Norms). |
| 34 | Stone Pad |
| 35 | Clamp for LT T-off with bolts & Nuts etc. |
| 36 | Holding Clamps for Top Channel, TPMO & Fuse set etc. with bolts & nuts. |
| 37 | Clamp for DB |
| 38 | LT Fuse Set Protection unit for 63/100 KVA T/F with SMC Box |
| 39 | LT Pole Clamp with nuts & Bolts for PCC Pole |
| 40 | F-Bracket |
| 41 | Alluminium Lug Long Barrel off size (LS) |
| 42 | Tailless Unit |
| 43 | Danger Board barbed wire including jumper |
| 44 | LT Clamp with Eye Hook |
| 45 | Suspension Clamp |
| 46 | Dead end Clamp |
| 47 | Plinth for Size 2x2x1.5 |
| 48 | Wiremesh Fencing Please Enable Macros to View BoQ information |