| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in- charge within a distance of 60 metre (200 feet). PWD SOR 2022 17.3 |
| 2 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre leadas per direction of Engineer-in-Charge. |
| 3 | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in- charge within a distance of 60 meter (200 feet). |
| 4 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M.in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineer incharge. excluding Royallity. Wherever applicable for small work or Abadi area. (Where machine con not reach/move) |
| 5 | S/L P:C:C (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge.{ AS PER PWD SOR 2022 PAGE NO 18 SI NO 5.01 ITEM NO 273 } |
| 6 | First class Brick Work in (1:4) cement & four coarse sand 2.20 F.M. morter in foundation and plinth and T&P etc all completed as per the direction of engineer - in - charge. (AS PER PWD SOR 2022 PAGE NO 20 SI NO 6.05 ITEM NO 305 (a) |
| 7 | 12 mm thick plaster with cement and coarse sand of1.25 fineness modules in (1:4) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. (AS PER PWD SOR 2022 PAGE NO 36 SI NO 13.11 NEW ITEM ) |
| 8 | S/S of 22.4 to 53mm gauge stone ballast with stacking for measurment etc. all complete as per the direction of Engineer in charge (AS PER PWD SOR 2020 RMR) |
| 9 | Supply of screening material with stacking for measurment etc all complete as per the direction of engineer in-charge .AS PER PWD SOR 2020 RMR |
| 10 | Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405. AS PER PWD SOR 2022 20.2.1 |
| 11 | Supply & laying 80 mm thick Precase cement concrete i-shape interlocking paver block (Grey color) with top layer of having plan dimension 200X(160+120mm) of O.P cement smoothing gloss finish, skid resistant manufacturered from rubber moulds through vibro-compression mechanism. the compressive strength of concrete paver block shall not be less than 30 mpa (M-30) and weight 5kg .per no. confirming to 15:15658-2006 including cost of material, labour,t&p etc. required for proper completion of the work as directed by Engineer -in-charge |
| 12 | R.C.C work with cement ,approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of doors &windows excluding supply of reinforcement and its bending ,but including its fixing and binding wire including necessary cantering and shuttering etc .and supply of all materials,labour,tools& plants etc. required for proper completion of the work including cost of binding wire. the rate excludes making of drip course which shall be paid extra etc all complete as per direction of engineer in charge.(AS PER PWD SOR 2020/283 a .) |
| 13 | Steel reinforcement for R.C.C work including straightening ,cutting ,bending,placing in position and binding all complete upto plinth level mild steel and medium tensile steel bars DSR 2023 ITEM N.5.22.1 |
| 14 | S/L C:C (1:2:4) with 20 mm stone grit, coarse sand & cement etc all complete as the direction of engineer in charge. (AS PER PWD SOR 2022 279 ( a). |
| 15 | Desposal of refused material lead up to 8 km distance including loading un loading etc etc all completed as per the direction of engineer - in - charge. |
| 16 | Deduct of old Tiles |
| 17 | Deduct of old Bricks |
| 18 | Deduct of old B/Bats |
| 19 | GST Please Enable Macros to View BoQ information |