| 1 | Name of the Work: Construction of R.O Plant Building at Kalaperumalpatti Village of Sandhaiyur Panchayat Virudhunagar Block Under PMKKY 2025-26 |
| 2 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B |
| 3 | Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all labour charges. |
| 4 | Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, |
| 5 | Centering charge for RCC works including all cost and conveyance all labour charges etc., complete. |
| 6 | Column Below GL |
| 7 | Column Upto Plinth Beam |
| 8 | Column Upto Lintel |
| 9 | Supplying and fabrication of steel of RCC works including all cost and conveyance and all labour charges such as cutting bending tying and placed in position. |
| 10 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. |
| 11 | Brick work in cement mortar 1:5 mix using country bricks 83/4\\"x4 1/4\\"x2 3/4\\" and conveyance of all materials to site and all labour charges etc complete |
| 12 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. |
| 13 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 14 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). |
| 15 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 16 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. |
| 17 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 18 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum. |
| 19 | Supplying and Delivery Steel Door inculding cost and labour Charges ect completed |
| 20 | Door (0.90x2.10) |
| 21 | Window(0.90x1.30) |
| 22 | Ventilater(0.60x0.45) |
| 23 | Provison for Electrification Sub estimate |
| 24 | Light point |
| 25 | Supplying & Fixing of Tube Light |
| 26 | CFL Bulk Head |
| 27 | Power Plug Point |
| 28 | Run Off |
| 29 | GI service pipe |
| 30 | GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |