|
| 1 | EARTHWORK EXCAVATION for foundation in all soils and to full depth as my be directed except in rock requiring blasting, but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with standard specifications. |
| 2 | Providing Pile foundation of size 300 mm dia using augur including labour charges and all other tools and plants charges etc. , as per direction of dept officers (Local Rate) |
| 3 | CEMENT CONCRETE 1:4:8 (One Cement, four sand and eight aggregate) using 40 mm gauge hard broken granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15 cm thick, complying with standard specification. |
| 4 | Supply and Fabrication of RTS Rods in Various Dia. Including Cutting, Bending and Tying with all Labour Charges Etc., Complete. |
| 5 | Supplying and erecting SHUTTERING including necessary supports for plane surfaces in foundation and in all floors for PLINTH BEAMS, STAIRCASE STEPS etc., using mild steel sheets of suitable size and BG 10 stiffened with welded mild steel etc., |
| 6 | Supplying and erecting SHUTTERING including necessary supports for plane surfaces in foundation and in all floors for PLINTH BEAMS, STAIRCASE STEPS etc., using mild steel sheets of suitable size and BG 10 stiffened with welded mild steel etc., |
| 7 | REINFORCED CEMENT CONCRETE 1:1 1/2::3 (One Cement, One and half sand and three aggregate) using 20 mm gauge hard broken granite stone jelly for FOUNDATION and BASEMENT including laying consolidating finishing curing etc complete complying with standard speification. |
| 8 | BRICKWORK in cement mortar 1:5 (One cement and five sand) using second class table moulded chamber burnt bricks of size 23 x 11 cm x 7 cm for the following including curing etc., complete complying with standard specifications |
| 9 | PLASTERING with cement mortar 1:5 (One cement and Five Sand) 12mm thick in all floors complying with standard specifications. |
| 10 | Supply of Precast Concrete Bus ShelterSize: 17'0\\" x 8'0\\" x 9'0\\" (H)Product Summary:Velan Concast is the sole and exclusive manufacturer of this patented precast bus shelter model. The unit is designed as a monolithic/detachable structure, requiring no foundation and can be installed directly on rammed earth.Manufactured using premium raw materials, the design includes all essential features required for a modern bus shelter.(Rate excludes transport and erection charges.)Technical Specifications:Concrete Grade: M40Reinforcement: Fe500D Steel (as per structuraldesign)Wall, Roof, Raft Thickness: 150 mm (skeleton only)Overall Dimensions:Height: 9'0\\"Built-up Area: 17'0\\" x 8'0\\"Additional Features:Roof Lights : 4 Nos Led light Floor : Decorative Tiles floor Finish, Seating: 11 nos MS Chair, Painting:Putty+ 1coat Primer+ 2 coat Emlusion.Roof Name Board: 16'0\\"x 2'0\\" |
| 11 | Wiring with 2 x 1.5 sq.mm. PVC insulated SC unsheathed copper cable of 1100 V grade with suitable rigid pipe on walls & ceiling for concealed light / fan point SD 01 |
| 12 | Wiring with 2 x 1.5 sq. mm insulated SC unsheathed cu. Conductor of 1100 V grade with suitable PVC rigid pipe on walls & ceiling for concealed plug point SD 10 |
| 13 | Supply and fixng of tneb meter board suitable for 3Phase 63A service connection made up of suitable angle iron frame work of size 2Feet x1-1/2 Feet using angle iron of size 1-1/2\\"X1-1/2\\"X1/4\\" Rigidly fixed on wall covered with hylem sheet of size 2 Feet x1/2 Feet of 6Mm thickness with necessary bolts and nuts supports and supply and fixing of 3Nos. 63A fuse units (500V), 1No. Neutral link, Copper earth flat of size 1\\"X1/4\\" With inter connection of eb metert of use units by 16 Sq.Mm pvc insulated copper wire with 1 No 63Amp 30Ma four polercd/ Rccb (Higher end)Withsuitable necessary Connection With Earth Connection Complete (Sd131) |
| 14 | Supply and run of 4 of 6 Sq.mm (84/0.3) PVC insulated SC Unsheathed CU.Condutor of 1100V on 7/20 GI bearer Wire for service connection Mains. SD 68 |
| 15 | Removal of Excavated Excess Earth away from the site to 5K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 Please Enable Macros to View BoQ information |