| 1 | Side protection |
| 2 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 3 | OD9041/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble in under water including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 4 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 5 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. |
| 6 | OD9038/2025-2026:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete |
| 7 | OD9040/2025-2026:Putting up bund of 1.00m width for an average height of 2.50m from bed level using causarina poles of 25 to 40cm girth in double rows at 50 cm c/c driving down for an average depth of 1.5m tied together with 1/3 split arecanut reapers @ 50 cmc/c horizontally and 1/3 split arecanut cross ties connecting two rows with GI wire, coir, yarn to all verticals and screening with double new coconut cadjans on either side of bund for full depth and filling inside with clayey soil taken out from the kayal etc complete |
| 8 | OD9042/2025-2026:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. |
| 9 | OD9039/2025-2026:Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end.Details for one post of 6m long 15 numbers per day 6X15=90mDetails for 90m length. |
| 10 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 11 | 8.2.2.2:Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.Area of slab over 0.50 sqm |
| 12 | 16.21:Engraving letters in hard stone |
| 13 | 2.2.1.A:Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.(I) By Manual Means (A) In area of non-thorny jungle |
| 14 | OD9036/2025-2026:Filling with Quarry waste Filling up low lying and water logged areas with Soil gravel mixture/ quarry waste, spreading in layers, leveling the top at site and consolidation by smooth wheeled roller, etc complete for improving the CBR value of subgrade. (Based on item No. 24.1 of CTE approved observed data) |
| 15 | OD9037/2025-2026:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers on prepared surface, mixing by mix in place method at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material |
| 16 | 11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203III. P.C.C. grade M 20 (i) Nominal mix (1:2:4) |
| 17 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 |
| 18 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 |
| 19 | 11.4.5:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203V. R.C.C. grade M 25 |
| 20 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 21 | Tile work |
| 22 | OD9035/2025-2026:Providing and laying of Interlock concrete block pavements (Hydraulic) having thickness 80mm(M40) as per drawings and technical specification clause 1504 confirming to IS 15658and laid in required colour and pattern over and including 50 mm thick compactedbed of 6 mm metal excluding edge concreting (Based on item No. 6.2 of CTE approved o/d) |
| 23 | 15.6:Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching. Please Enable Macros to View BoQ information |