| 1 | Compound Wall |
| 2 | 2.8.1Earth work in excavation by mechanical means (Hydraulic excavator) /manual meansin foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift up to 1.5 m, includinggetting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m.All kinds of soil |
| 3 | 60.7.1DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonrywith good quality blasted rubble including packing to compactness to lines and levelscost and conveyance of all materials labour charges etc. complete as per direction ofDepartmental officers at site |
| 4 | 7.1.1Random rubble masonry with hard stone in foundation and plinth including levellingup with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarsesand) |
| 5 | 50.6.2.2Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm ornearest available size confirming to IS 2185 part I of 1979 for super structure up tofloor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etccomplete |
| 6 | 10.25.2Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer usingstructural steel etc. as required.In gratings, frames, guard bar, ladder, railings,brackets, gates and similar works |
| 7 | 13.1.112 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 8 | 4.1.3Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarsesand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mmnominal size derived from natural sources) |
| 9 | 4.3.1Centering and shuttering including strutting, propping etc. and removal of form workfor:Foundations, footings, bases for columns |
| 10 | 5.22.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete upto plinth levelThermo - Mechanically Treatedbars of grade Fe-500D or more |
| 11 | 11.20.1Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard,jointed with neat cement slurry mixed with pigment to match the shade of tiles,including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar1:4 ( 1 cement : 4 coarse sand).Light shade pigment using white cement |
| 12 | 13.52.1Finishing with Epoxy paint (two or more coats) at all locations prepared and appliedas per manufacturer's specifications including appropriate priming coat, preparationof surface, etc. complete.On steel work |
| 13 | EXCLUSIVE OF GST |
| 14 | Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL |
| 15 | 2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items |
| 16 | 3.Rate should be Exclusive of GST. |
| 17 | 4.Work should be executed as per DSR/PWD specification and direction of Engineer at site. |
| 18 | 5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference. |
| 19 | 6.RCC: (Assessment of strength of concrete by Cube testing at Approved Govt labs as per IS) Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference. |
| 20 | 7.STEEL REINFORCEMENT: Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference |
| 21 | 8.CENTERING & SHUTTERING: (Centering and shuttering for different category of work may be considered separately.) |
| 22 | 9. SOLID BLOCK MASONRY: Min. average compressive strength as per IS shall be 40-50kg/cm2 and has to be assessed by testing at Govt. lab. ( Variation in rate due to change in size of block and level of floor as per DSR/PRICE has to be considered) |
| 23 | 10. ACRYLIC SMOOTH EXTERIOR PAINT/ SYNTHETIC ENAMEL PAINT/WHITE CEMENT BASED PUTTY/ CEMENT PRIMER: Make: Asian, Berger, Nerolas or eq. in the order of pref. Please Enable Macros to View BoQ information |