| 1 | Safe loading Carriage including unloading and proper stacking of following materials from central store Barabanki to site of work. |
| 2 | PCC Pole 11 Mtr |
| 3 | Earthing Set Complete |
| 4 | 33 KV XLPE Cable 3x120 Sq.mm. |
| 5 | 33 KV XLPE Cable 3x300 Sq.mm. |
| 6 | 33 KV 3x300 sqmm XLPE O/D Cable Box Jointing Kit |
| 7 | 33 KV 3x300 sqmm XLPE Straight through |
| 8 | 33 KV 3x3120 sqmm XLPE O/D Cable Box Jointing Kit |
| 9 | 33 KV 3x120 sqmm XLPE Straight through |
| 10 | 33 kv Pin Insulator with pin & nut |
| 11 | 33 kv Disk Insulator |
| 12 | Top Channel |
| 13 | Dropper Channel |
| 14 | Stay Wire 4 mm 7/8 SWG |
| 15 | 33 kv Cross Arm V Type |
| 16 | ACSR Panther Conductor |
| 17 | F-bracket for 33 kv line |
| 18 | MS-Cross Basing Angle65x65x5 with Clamp |
| 19 | 33 kv Stay Set 20x1800 mm |
| 20 | Dragging of pole from JE Dump Store to site |
| 21 | Grouting of Pole in depth of 1/6th the length of pole in ratio 1:4:8 in cement sand and brick ballast and construction of pole plinth 300mmx45mm above ground level in 1:2:4 in cement, coarse sand and stone grit as per respo norms. |
| 22 | Concreating of Stay |
| 23 | Erection of Substation type Single pole with PCC 11 Mtr. Long including mounting of Top Channal, base angle with clamps with nut & bolt 33/11 KV line. |
| 24 | Erection of Substation type Double pole with PCC 11 Mtr. Long including mounting of Top Channal, base angle with clamps with nut & bolt 33/11 KV line. |
| 25 | Stringing and sagging of 33 KV line with ACSR Panther Conductor including nuzzling binding and jumpering (weasal conductor will be provided by the department) |
| 26 | Earthing of pole with MS Earthing. |
| 27 | Fixing of 33 KV XLPE 3x300 sqmm O/D Cable Box Jointing Kit |
| 28 | Fixing of 33 KV XLPE 3x300 sqmm Straight through |
| 29 | Fixing of 33 KV XLPE 3x120 sqmm O/D Cable Box Jointing Kit |
| 30 | Fixing of 33 KV XLPE 3x120 sqmm Straight through |
| 31 | Providing & Fixing of various type materials. All materials shall be supplied by the contractor. |
| 32 | Nut & Bolt with wasther |
| 33 | Clamp for Top/T-off/Dropper/cross arm |
| 34 | GI Pipe dia 6/8 |
| 35 | Laying of 33 kV 3x120+3x300 sq. mm XLPE cable by HDD(Drill Method) As per Respo Norms (All the material required for laying will be supplied by the contractor except 33 kV XLPE cable) |
| 36 | Mounting of 33 kv XLPE Cable 3x300 sqmm |
| 37 | Hosting of 33 kv XLPE Cable 3x300 sqmm on DP with GI pipe 6\\" its Jumpring complete with clamps, nut and bolts. (All material will be Provided by the contractor except 33 kv cable & O/D J/K. as per RESPO NORMS. |
| 38 | Testing of Cable |
| 39 | Dismantling of 33 kV grade underground XLPE cable of any size (up to 3•300 sq.mm), including excavation of trench, removal of cable carefully without damage, coiling, loading, transportation to departmental store, unloading, stacking and accounting, complete in all respects. |
| 40 | Other line work Please Enable Macros to View BoQ information |