| 1 | Work-01 (Construction of 33 KV Ringmain line manbela from 33 KV line Ayush Vishwavidyalay to 33/11 KV manbela Distt Gorakhpur) PART-A (Material Provided By Contractor) |
| 2 | 33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor |
| 3 | M S Dropper Angle |
| 4 | M S Holding Clamp for STP Support |
| 5 | Nut Bolt and washer all sizes |
| 6 | Number Plate with clamp and Nut & Bolt |
| 7 | Danger Board with clamp and Nut & Bolt |
| 8 | Barbed Wire |
| 9 | Red Oxide Paint |
| 10 | Aluminium Paint |
| 11 | Earthing Complete (Per set =01 No Earthing Rod + 2Kg GI Wire) |
| 12 | GI Pipe 6\\" Dia |
| 13 | 33 KV Polymer Disc Insulator |
| 14 | 33 KV Disc Fitting |
| 15 | PG CLAMP For Dog |
| 16 | 33 KV Stay Set Complete |
| 17 | PART - B- WORKShifting, Loading Carriage & Unloading of following materials from store centre Gorakhpur to work site. |
| 18 | ST Pole 11 m |
| 19 | ST Pole 9 m |
| 20 | 33 KV 3x300 XLPE Cable |
| 21 | 33 KV Line Isolator |
| 22 | 33 KV Line Isolator structure |
| 23 | 33 KV Fuse set |
| 24 | 33 KV Fuse set Structure |
| 25 | 33 KV Top Channel |
| 26 | ACSR Dog conductor |
| 27 | Laying of 33 KV 3x300 mm² ‘XLPE’ cable in cable trench. As per site requirement |
| 28 | Laying of 33 KV 3x300 mm² ‘XLPE’ cable by HDD mathod OR laying along with cast of digging, bricks & sand. As per site requirement |
| 29 | Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Outdoor/Indoor |
| 30 | Looping and rising of 33 KV ‘XLPE’ cable in air in 6” dia. GI pipe 3m long with cable clamp, GI Pipe clamp Complete work. |
| 31 | Special pipe earthing with material for cable and kit protection |
| 32 | Erection of Double pole structure on 9 mtr ST Pole for Cable rising with fitting of all accessories, Painting,Earthing Complete Work |
| 33 | Erection of Double pole structure on 11 mtr ST Pole for one side OH Line one side Cable rising with fitting of all accessories, Painting, Earthing Complete Work |
| 34 | Concreting of pole and making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm stone ballast), back filling of earth, proper ramming. (as per UPPCL Norms) |
| 35 | Erection and grouting of Line Isolator Structure and install Line Isolator and earthing, Painting complete work. |
| 36 | Erection and grouting of Fuse set Structure and installation of 33 KV Fuse Set, earthing, Painting complete work. |
| 37 | Grouting of stay rods including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40 mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension. |
| 38 | Work-02 (Laying of 33 KV Cable of Raptinagar new Substation from tehuhi to Bhagwanpur cement Godawn ) PART-A (Material Provided By Contractor) |
| 39 | 33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor |
| 40 | M S Dropper Angle |
| 41 | M S Holding Clamp for STP Support |
| 42 | Nut Bolt and washer all sizes |
| 43 | Number Plate with clamp and Nut & Bolt |
| 44 | Danger Board with clamp and Nut & Bolt |
| 45 | Barbed Wire |
| 46 | Red Oxide Paint |
| 47 | Aluminium Paint |
| 48 | Earthing Complete (Per set =01 No Earthing Rod + 2Kg GI Wire) |
| 49 | GI Pipe 6\\" Dia |
| 50 | PART - B- WORKShifting, Loading Carriage & Unloading of following materials from store centre Gorakhpur to work site for 33/11 KV S/S Industrial estate |
| 51 | ST Pole 9 m |
| 52 | 33 KV 3x300 XLPE Cable |
| 53 | 33 KV Top Channel |
| 54 | ACSR Dog conductor |
| 55 | Laying of 33 KV 3x300 mm² ‘XLPE’ cable in cable trench. As per site requirement |
| 56 | Laying of 33 KV 3x300 mm² ‘XLPE’ cable by HDD mathod OR laying along with cast of digging, bricks & sand. As per site requirement |
| 57 | Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Outdoor/Indoor |
| 58 | Looping and rising of 33 KV ‘XLPE’ cable in air in 6” dia. GI pipe 3m long with cable clamp, GI Pipe clamp Complete work. |
| 59 | Special pipe earthing with material for cable and kit protection |
| 60 | Erection of Double pole structure on 9 mtr ST Pole for Cable rising with fitting of all accessories, Painting, Earthing Complete Work |
| 61 | Concreting of pole and making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm stone ballast), back filling of earth, proper ramming. (as per UPPCL Norms) |
| 62 | Work-03 (SS Strengthening at Raptinagar new (in Switchyar Dog to Panther))PART-A (Material Provided By Contractor) |
| 63 | PG Connector for 33 kv Isolator, CT, VCB, FUSE SET, LA, PT, POST, Transformer And other |
| 64 | 33 KV PG Clamp |
| 65 | Nut and Bolt |
| 66 | PART - B- WORKShifting, Loading Carriage & Unloading of following materials from store centre Gorakhpur to work site. |
| 67 | ACSR Panther conductor |
| 68 | Provide and Replace of Existing Dog conductor Swithyard, Bus bar Gantry to Panther conductor Swithyard, Bus bar Gantry, with all fitting complete work |
| 69 | Work-04 (Construction of 33 KV line Mohaddipur from 132/33 KV SS Mohaddipur old to 33/11 KV Mohaddipur)PART-A (Material Provided By Contractor) |
| 70 | 33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor |
| 71 | 33 KV ‘XLPE’ C/J Kit 3x300mm² Straight Through |
| 72 | M S Dropper Angle |
| 73 | M S Holding Clamp for STP Support |
| 74 | Nut Bolt and washer all sizes |
| 75 | Number Plate with clamp and Nut & Bolt |
| 76 | Danger Board with clamp and Nut & Bolt |
| 77 | Barbed Wire |
| 78 | Red Oxide Paint |
| 79 | Aluminium Paint |
| 80 | Earthing Complete (Per set =01 No Earthing Rod + 2Kg GI Wire) |
| 81 | GI Pipe 6\\" Dia |
| 82 | 33 KV Polymer Disc Insulator |
| 83 | 33 KV Disc Fitting |
| 84 | PG CLAMP For Dog |
| 85 | 33 KV Stay Set Complete |
| 86 | Armoured copper control cable 2 x 2.5 mm2 |
| 87 | Armoured copper control cable 4 x 2.5 mm2 |
| 88 | PART - B- WORKShifting, Loading Carriage & Unloading of following materials from store centre Gorakhpur to work site. |
| 89 | ST Pole 11 m |
| 90 | ST Pole 9 m |
| 91 | 33 KV 3x300 XLPE Cable |
| 92 | 33 KV Line Isolator |
| 93 | 33 KV Line Isolator structure |
| 94 | 33 KV CT 400/200/1A |
| 95 | 33 KV CT Structure |
| 96 | 33 KV LA |
| 97 | 33 KV LA Structure |
| 98 | 33 KV VCB with structure |
| 99 | 33 KV Control pannel for single feeder |
| 100 | 33 KV Top Channel |
| 101 | ACSR Dog conductor |
| 102 | Laying of 33 KV 3x300 mm² ‘XLPE’ cable by HDD mathod OR laying along with cast of digging, bricks & sand. As per site requirement |
| 103 | Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Outdoor/Indoor |
| 104 | Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Straight Through |
| 105 | Looping and rising of 33 KV ‘XLPE’ cable in air in 6” dia. GI pipe 3m long with cable clamp, GI Pipe clamp Complete work. |
| 106 | Special pipe earthing with material for cable and kit protection |
| 107 | Erection of Double pole structure on 9 mtr ST Pole for Cable rising with fitting of all accessories, Painting, Earthing Complete Work |
| 108 | Erection of Double pole structure on 11 mtr ST Pole for one side OH Line one side Cable rising with fitting of all accessories, Painting, Earthing Complete Work |
| 109 | Concreting of pole and making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm stone ballast), back filling of earth, proper ramming. (as per UPPCL Norms) |
| 110 | Erection and grouting of Line Isolator Structure and install Line Isolator and earthing, Painting complete work. |
| 111 | Erection and grouting of CT Structure and installation of 33 KV CT, wiring and earthing, Painting complete work. |
| 112 | Erection and grouting of LA Structure and installation of 33 KV LA and earthing, Painting complete work. |
| 113 | Erection and grouting of VCB Structure and installation of 33 KV VCB, wiring and earthing complete work. |
| 114 | Installation of 33 KV CR Pannel, wiring and earthing complete work. |
| 115 | Grouting of stay rods including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40 mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension. |
| 116 | Laying from switchyard to control room for 33 KV panel, CT, VCB by digging trench and making connection complete. (As per site requirement laying of cable though cable trench if available with covering brick and sand. |
| 117 | 2 x 2.5 mm2 |
| 118 | 4 x 2.5 mm2 |
| 119 | Work-05 (Strengthening work of 33 KV line Medical collage (pole in long span) PART-A (Material Provided By Contractor) |
| 120 | Clamp for 33 KV \\"V\\" type Cross arm with bolts and nuts |
| 121 | F-bracket for 33 KV |
| 122 | Polymeric 33KV Pin Insulator |
| 123 | Number Plate with clamp and Nut & Bolt |
| 124 | Danger Plate with clamp and Nut & Bolt |
| 125 | G I Barbed Wire |
| 126 | Nut Bolt and washer all sizes |
| 127 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 128 | Aluminium Paint |
| 129 | Red Oxide Paint |
| 130 | MS Guarding Angle |
| 131 | Guarding Angle Clamp |
| 132 | GI Wire 6 SWG |
| 133 | Gi Wire 8 SWG |
| 134 | PART - B- WORKShifting, loading and carriage of following materials on private truck at store centre Gorakhpur & Un-loading of the same with proper stacking at work site. |
| 135 | ST Pole 11 m long |
| 136 | 33 KV X ARM |
| 137 | Erection of Single pole structure on 11 Mtr ST Pole including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (‘V' type cross arm 100 x 50 x 6 mm, clamps with bolt and nut, composite polymer pin insulator, danger board with clamp, barbed wire,painting, earthing, etc. complete). |
| 138 | Guarding between two poles like single poles, double poles, four poles, etc. to guard LT, 11 KV Line, telephone, river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, cutting, fabrication and fixing of guarding channel 75 x 40 x 3010 mm with clamps nut & bolts etc. |
| 139 | Open the Binding of Existing pole and Restringing of ACSR conductor after mid span pole errection |
| 140 | Work-06 (Strengthening work of 33 KV line Raptinagar old (pole in long span) PART-A (Material Provided By Contractor) |
| 141 | Clamp for 33 KV \\"V\\" type Cross arm with bolts and nuts |
| 142 | F-bracket for 33 KV |
| 143 | Polymeric 33KV Pin Insulator |
| 144 | Number Plate with clamp and Nut & Bolt |
| 145 | Danger Plate with clamp and Nut & Bolt |
| 146 | G I Barbed Wire |
| 147 | Nut Bolt and washer all sizes |
| 148 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 149 | Aluminium Paint |
| 150 | Red Oxide Paint |
| 151 | MS Guarding Angle |
| 152 | Guarding Angle Clamp |
| 153 | GI Wire 6 SWG |
| 154 | Gi Wire 8 SWG |
| 155 | PART - B- WORKShifting, loading and carriage of following materials on private truck at store centre Gorakhpur & Un-loading of the same with proper stacking at work site. |
| 156 | ST Pole 11 m long |
| 157 | 33 KV X ARM |
| 158 | Erection of Single pole structure on 11 Mtr ST Pole including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (‘V' type cross arm 100 x 50 x 6 mm, clamps with bolt and nut, composite polymer pin insulator, danger board with clamp, barbed wire,painting, earthing, etc. complete). |
| 159 | Guarding between two poles like single poles, double poles, four poles, etc. to guard LT, 11 KV Line, telephone, river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, cutting, fabrication and fixing of guarding channel 75 x 40 x 3010 mm with clamps nut & bolts etc. |
| 160 | Open the Binding of Existing pole and Restringing of ACSR conductor after mid span pole errection |
| 161 | Work-07 (Strengthening work of 33 KV line Shahpur (pole in long span) PART-A (Material Provided By Contractor) |
| 162 | Clamp for 33 KV \\"V\\" type Cross arm with bolts and nuts |
| 163 | F-bracket for 33 KV |
| 164 | Polymeric 33KV Pin Insulator |
| 165 | Number Plate with clamp and Nut & Bolt |
| 166 | Danger Plate with clamp and Nut & Bolt |
| 167 | G I Barbed Wire |
| 168 | Nut Bolt and washer all sizes |
| 169 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 170 | Aluminium Paint |
| 171 | Red Oxide Paint |
| 172 | MS Guarding Angle |
| 173 | Guarding Angle Clamp |
| 174 | GI Wire 6 SWG |
| 175 | Gi Wire 8 SWG |
| 176 | PART - B- WORKShifting, loading and carriage of following materials on private truck at store centre Gorakhpur & Un-loading of the same with proper stacking at work site. |
| 177 | ST Pole 11 m long |
| 178 | 33 KV X ARM |
| 179 | Erection of Single pole structure on 11 Mtr ST Pole including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (‘V' type cross arm 100 x 50 x 6 mm, clamps with bolt and nut, composite polymer pin insulator, danger board with clamp, barbed wire,painting, earthing, etc. complete). |
| 180 | Guarding between two poles like single poles, double poles, four poles, etc. to guard LT, 11 KV Line, telephone, river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, cutting, fabrication and fixing of guarding channel 75 x 40 x 3010 mm with clamps nut & bolts etc. |
| 181 | Open the Binding of Existing pole and Restringing of ACSR conductor after mid span pole errection. |
| 182 | Work-08 (SS Strengthening work at Univercity (Isolator work) PART-B Shifting, loading and carriage of following materials on private truck at store centre Gorakhpur & Un-loading of the same with proper stacking at work site. |
| 183 | 33 KV line Isolator 400Amp |
| 184 | Mounting, Installation, Fitting & Earthing of 33 kv Line Isolator on old structure. Complete work |
| 185 | Shifting, loading and carriage & unloading of old damage materials from site to store centre Gorakhpur. |
| 186 | Work-09 (SS Strengthening work at District Hospital (Isolator work) PART-B Shifting, loading and carriage of following materials on private truck at store centre Gorakhpur & Un-loading of the same with proper stacking at work site |
| 187 | 33 KV line Isolator 400Amp |
| 188 | Mounting, Installation, Fitting & Earthing of 33 kv Line Isolator on old structure. Complete work |
| 189 | Shifting, loading and carriage & unloading of old damage materials from site to store centre Gorakhpur. |
| 190 | Work-10 (SS Strengthening work at Taramandal (Fuse set work) PART-B Shifting, loading and carriage of following materials on private truck at store centre Gorakhpur & Un-loading of the same with proper stacking at work site. |
| 191 | 33 KV Fuse set |
| 192 | Mounting, Installation, Fitting & Earthing of 33 kv Fuse Set on old structure. Complete work |
| 193 | Shifting, loading and carriage & unloading of old damage materials from site to store centre Gorakhpur. |
| 194 | Work-11 (SS Strengthening work at Raptinagar old (CT work) PART-B Shifting, loading and carriage of following materials on private truck at store centre Gorakhpur & Un-loading of the same with proper stacking at work site |
| 195 | 33 KV CT |
| 196 | Mounting, Installation, Fitting & Earthing of 33 kv CT on old structure. Complete work |
| 197 | Shifting, loading and carriage & unloading of old damage materials from site to store centre Gorakhpur. |
| 198 | Work-12 (SS Strengthening work at Industrial State (CT work) PART-B Shifting, loading and carriage of following materials on private truck at store centre Gorakhpur & Un-loading of the same with proper stacking at work site. |
| 199 | 33 KV CT |
| 200 | Mounting, Installation, Fitting & Earthing of 33 kv CT on old structure. Complete work |
| 201 | Shifting, loading and carriage & unloading of old damage materials from site to store centre Gorakhpur. |
| 202 | Work-13 (SS Strengthening work at Durgabadi (CT work) PART-B Shifting, loading and carriage of following materials on private truck at store centre Gorakhpur & Un-loading of the same with proper stacking at work site. |
| 203 | 33 KV CT |
| 204 | Mounting, Installation, Fitting & Earthing of 33 kv CT on old structure. Complete work |
| 205 | Shifting, loading and carriage & unloading of old damage materials from site to store centre Gorakhpur. |
| 206 | Work-14 (SS Strengthening work at Durgabadi (PT work) PART-B Shifting, loading and carriage of following materials on private truck at store centre Gorakhpur & Un-loading of the same with proper stacking at work site. |
| 207 | 33 KV PT |
| 208 | Mounting, Installation, Fitting & Earthing of 33 kv PT on old structure. Complete work |
| 209 | Shifting, loading and carriage & unloading of old damage materials from site to store centre Gorakhpur. Please Enable Macros to View BoQ information |