|
| 1 | Comprehensive maintenance of 20 to 25 KVA static frequency converter with input supply of 3 phase, 415V, 50 Hz with output of 3 ph, 4 wire, 115 AC /200V, AC, 400 Hz of make M/s Power one Micro systems including attending day to day complaints, isolating converter from system, opening up, examining the accessories parts, cleaning, soldering as required, testing and connecting back with the systems complete all as specified and as directed by the Engineer-in-Charge. Location: LCA Hanger No-I, II & III - 09 Nos, Rotable section & Spl power supply room - 06, Fadec - 01, Old TRCD - 02, CRRW - 01, RSDL - 01, IFCS - 01, Avionics Complex - 01 (Total 22 Nos) |
| 2 | Comprehensive maintenance of 30 to 40 KVA static frequency converter with input supply of 3 phase, 415V, 50 Hz with output of 3 ph, 4 wire, 115 AC /200V, AC, 400 Hz of make M/s Power one Micro systems including attending day to day complaints, isolating converter from system, opening up, examining the accessories parts, cleaning, soldering as required, testing and connecting back with the systems complete all as specified and as directed by the Engineer-in-Charge. Location: Old TRCD- 02 (Total 02 Nos) |
| 3 | Comprehensive maintenance of 60 KVA static frequency converter with input supply of 3 phase, 415V, 50 Hz with output of 3 ph, 4 wire, 115 AC /200V, AC, 400 Hz of make M/s Power one Micro systems including attending day to day complaints, isolating converter from system, opening up, examining the accessories parts, cleaning, soldering as required, testing and connecting back with the systems complete all as specified and as directed by the Engineer-in-Charge. Location: Avionics Complex - 02 (Total 02 Nos) |
| 4 | Comprehensive maintenance of 5 KVA static frequency converter with input supply of 3 phase, 415V, 50 Hz with out put of 3 ph, 4 wire, 115 AC /200V, AC, 400 Hz of make M/s Power one Micro systems including attending day to day complaints, isolating converter from system, opening up, examining the accessories parts, cleaning, soldering as required, testing and connecting back with the systems complete all as specified and as directed by the Engineer-in-Charge. Location: CRRW -01 No & Old TRCD- 01 No (Total 02 Nos) |
| 5 | Comprehensive maintenance of 1.25 KVA static frequency converter with input supply of 3 phase, 415V, 50 Hz with out put of 3 ph, 4 wire, 115 AC /200V, AC, 400 Hz of make M/s Aplab including attending day to day complaints, isolating converter from system, opening up, examining the accessories parts, cleaning, soldering as required, testing and connecting back with the systems complete as specified and as directed by the Engineer-in-ChargeLocation: 33 Sqn Tarang Lab - 01 No |
| 6 | Comprehensive maintenance of 4 KVA static frequency converter with input supply of 3 phase, 415V, 50 Hz with out put of 3 ph, 4 wire, 115 AC /200V, AC, 400 HZ of make M/s Aplab including attending day to day complaints, isolating converter from system, opening up, examining the accessories parts, cleaning, soldering as required, testing and connecting back with the systems complete as specified and as directed by the Engineer-in-Charge Location: 33 Sqn Tarang Lab - 01 No |
| 7 | Comprehensive maintenance of DC power supply (rectifier) 28Volts, DC, out put 12 KW, with input supply of 3 phase, 415V, 50 Hz of make M/s Power one Micro systems, including attending day to day complaints, isolating converter from system, oopening up, examining the accessories parts, cleaning, soldering as required, testing and connecting back with the systems complete all as specified and as directed by the Engineer-in-Charge.Location: LCA Hanger No-I, II & III - 09 & Fadec -01 (Total 10 Nos). |
| 8 | Comprehensive maintenance of DC power supply (rectifier) 28Volts, DC, out put 5 to 10 KW, with input supply of 3 phase, 415V, 50 Hz of make M/s Power one Micro systems, including attending day to day complaints, isolating converter from system, opening up, examining the accessories parts, cleaning, soldering as required, testing and connecting back with the systems complete all as specified and as directed by the Engineer-in-Charge.Location: Avionics Complex-02, EW- Bldg-01 (Total 03 Nos) |
| 9 | Comprehensive maintenance of DC power supply (rectifier) 28Volts, DC, out put 15 KW, with input supply of 3 phase, 415V, 50 Hz of make M/s Power one Micro systems, including attending day to day complaints, isolating converter from system, opening up, examining the accessories parts, cleaning, soldering as required, testing and connecting back with the systems complete all as specified and as directed by the Engineer-in-Charge. Location: AVRO Hangar-01, TRCL- Bldg-01 (Total 02 Nos) |
| 10 | Comprehensive maintenance of DC power supply (rectifier) 28Volts, DC, out put 3.84 KW, with input supply of 3 phase, 415V, 50 Hz of make M/s Power one Micro systems, including attending day to day complaints, isolating converter from system, opening up, examining the accessories parts, cleaning, soldering as required, testing and connecting back with the systems complete all as specified and as directed by the Engineer-in-Charge.Location: Special power supply room -02 Nos. |
| 11 | Comprehensive maintenance of DC power supply (rectifier) 28Volts, DC, out put 1.92 KW, with input supply of 3 phase, 415V, 50 Hz of make M/s Power one Micro systems, including attending day to day complaints, isolating converter from system, opening up, examining the accessories parts, cleaning, soldering as required, testing and connecting back with the systems complete all as specified and as directed by the Engineer-in-Charge. Location: Rotable section & Special power supply room -08 Nos. |
| 12 | Comprehensive maintenance of DC power supply (rectifier) 28Volts, DC, out put 1.44 KW, with input supply of 3 phase, 415V, 50 Hz of make M/s Power one Micro systems, including attending day to day complaints, isolating converter from system, opening up, examining the accessories parts, cleaning, soldering as required, testing and connecting back with the systems complete all as specified and as directed by the Engineer-in-Charge. Location: Rotable section & Special power supply room -08 Nos. |
| 13 | Note for Item No 01 to 12: (a) The contractor shall attend complaints of the equipments and the repairs/ maintenance shall be deemed to be carried out through the qualified service agency. The comprehensive maintenance including replacement of minor spare parts for these equipments shall be commenced only after the consent of Engr- in-Charge. Replacement of major spare parts if required shall be deemed to be measured and paid seperately under relevant item. Please Enable Macros to View BoQ information |
| 14 | Note for Item No 01 to 12: (a) The contractor shall attend complaints of the equipments and the repairs/ maintenance shall be deemed to be carried out through the qualified service agency. The comprehensive maintenance including replacement of minor spare parts for these equipments shall be commenced only after the consent of Engr- in-Charge. Replacement of major spare parts if required shall be deemed to be measured and paid seperately under relevant item. Please Enable Macros to View BoQ information |