| 1 | Comprehensive annual maintenance of Swimming pool comprises of the following equipments complete all as specified and directed.(a) Pumping sets of capacity 3.5 HP - 05 Nos (01 as Standby) (b) Pressure filter of filtering capacity 50 Cum/Hr - 04 Nos (01 as Standby)(c) Dosing pump - 02 Nos (One for Chlorination and one for Soda Ash)(d) Electrical panel board consisting of starters of suitable rating complete.Note: Rate quoted by the contractor shall deemed to be included for the following :-(i) Contractor shall provide trained technician and a helper, who will visit Swimming pool once in a week, to check and servicing of the equipments above to ensure the serviceability and proper functioning of Swimming pool.(ii) Grease and lubricating oil shall be provided by the contractor at his own end and nothing extra shall be payable on this account. (iii) Cleaning all swimming pool building inside, plant room, equipments including surrounding area of the buildings. (iv) Check serviceability of all self priming recirculation pump of single stage / horizontal self priming pump set of 3.5Hp / 3.26 KW Capacity and all other connected items. |
| 2 | Comprehensive annual maintenance of fire fighting system in Sekhon Hall , New Tech Flight, SRE and New ATC of the following equipments complete all as specified and directed.(a) Main Fire Pump with centrifugal motor of existing capacity- 04 Nos (b) Jockey Fire pump with Electric motor of existing capacity - 04 Nos (c) Makeup fire Pump- 04 Nos(d) DG Fire Pump with engine - 04 Nos Note: Rate quoted by the contractor shall deemed to be included for the following :-(i) Contractor shall provide trained technician and a helper, who will visit fire fighting installation in sekhon hall , New Tech Flight and New ATC once in a week, to check and servicing of the equipments above to ensure the serviceability and proper functioning of installation.(ii) Grease and lubricating oil shall be provided by the contractor at his own end and nothing extra shall be payable on this account.(iii) Cleaning all fire fighting installation buildings (Sekhon Hall , New Tech Flight and New ATC) inside, plant room,equipments including surrounding area of the building. (iv) Check serviceability of all self priming recirculation pump of single stage / horizontal self priming pump set of all existing Capacity and all other connected items. |
| 3 | S&F in repair Pressure pump limit switch of capacity 1Psi to 4 Psi and 230 Volt as per existing make and model fixed on pressure booster line complete all as specified and directed. |
| 4 | Supply, installation, testing and commissioning in repair of detectors complying with and type certified to EN-45 addressable type multi sensor detector with heat and smoke combination with base with self built intelligence as per IS:11360 (For annexes) complete all as specified and directed. |
| 5 | Supply, installation, testing and commissioning in repair of addressable manual call point / pill station resettable type with base complete all as specified and directed |
| 6 | Supply, installation, testing and commissioning in repair of fire alarm sounder/siren electronic type horizontal single stage continuous type normal operation for atleast 50 minutes with sound level 65 db to 120 db measured at 1.5 mtr with sound output variation +5 db 500 mtr complete all as specified and directed |
| 7 | Supply and fixing in repair Addressable monitor module for activating the sirens complete all as specified and directed |
| 8 | Taking out old unserviceable Hose box by cutting and welding and S&F hose box made of 18 gauge MS Sheet 800mmx 600 mm x 250 mm with double door with 4 mm thick glasses and door frame made of 16 gauge MS sheet for keeping 2 Nos hose pipe of length 15 mtr each branch pipe nozzle coupling etc and painted fire red out side and brilliant white inside yard complete all as specified and directed. |
| 9 | Supply and fixing in repair hose box for hose real of 20mm size of 30mtr length complete with coupling branch pipe and nozzle complete all as specified and directed.(i) 01 No 63mm dia oblique pattern instantaneous female type GM landing valve with caps and chain confirming to IS 5290 with 100 dia pressure gauge(ii) 2 x 15 mtr long 20mm dia reinforced rubber hose reel with MS painted, swing type drum 6.5mm nozzles etc conforming IS 884 including supporting bracket.(iii) One set of GM branch pipe conforming to IS 903 (iv) One branch pipe, one fire man axe, first aid hose reel and fire extinguisher. |
| 10 | Supply, fixing and commissioning as in repair of wall mounting swinging type first aid fire hose reel with drum hanging bracket, 30 mtr long and 20mm dia high pressure hose reel as per IS 444 with gunmetal shut off nozzle having 5mm dia orifice. The hose reel shall be confirming to IS 884-1985. Rate shall incl for 25mm dia MS pipe connection from riser to hose reel sockets, nipples, elbows and ball valve (25mm dia). Drum shall be fixed on adjoining wall through anchor fasteners/cement concrete book or MS stand as per site requirement and the rate of fixing/hanging items in the rates quoted (for internal hydrant and one each an either side of stage) complete all as specified and directed by Engr-In -Charge. |
| 11 | Supply and fixing as in repair fire fighting Gun metal 63mm bore short branch pipe with 20mm bore gun metal nozzle ISI marked (IS: 903) suitable for instantaneous connection to inter connection hose pipe coupling complete all as specified and directed. |
| 12 | Supply and fixing as in repair Fire fighting canvas hose Pipe, cotton synthetic fibre, circular woven jacketed rubbersised fabric, reinforced rubber lined (RRL), fire hose, delivery, treated against Rot with Mystox, 35.7 Kg/sqcm brust pressure, 22 Kg/sqcm proof pressure, 63mm dia & 15 mtr long (ISI marked) Type 'A' with instantaneous type male & female GM coupling (ISI) of 63mm dia bound and riveted to hose pipe with copper rivets & 1.5mm thick copper wire, complete all as specified and directed |
| 13 | M&L for Scratching old paint on fire fighting installation complete with the help of emery paper and wire brush, and painting the surfaces with two coats of synthetic enamel Fire red paint, as per existing or as directed including marking flow arrows complete all as specified and directed. The installation includes the following equipments:- (i) Water suction lines of size 150mm bore - 80 RM approx incl supporting structure. (ii) Fire pump set 70 HP -01 No (iii) Jockey pump set 25 HP- 01 No (iv) Diesel Generating Pump -01 No. with frames, (v) SWT cover- approx 18 Sq mtr. (vi) Hydrant Post - include Hose cabinet - 08 Nos |
| 14 | Supply and fixing as in repair CI non return valve 150mm bore for suction including jointing material, including nuts bolts etc. complete all as specified and directed. |
| 15 | Supply and fixing as in repair CI non return valve 100mm bore for suction including jointing material, including nuts bolts etc. complete all as specified and directed. |
| 16 | Supply and fixing as in repair CI non return valve 80mm bore for suction including jointing material,including nuts bolts etc. complete all as specified and directed. |
| 17 | Supply and fixing as in repair 80 mm bore Butterfly valve Cast Iron body, Wafer type integrally moulded close end body construction with Hand lever operated and rating of PN-1.0 confirming to IS : 13095 (ISI Martked) complete all as specified and directed. |
| 18 | Supply and fixing as in repair 100 mm bore Butterfly valve Cast Iron body, Wafer type integrally moulded close end body construction with Hand lever operated and rating of PN-1.0 confirming to IS : 13095 (ISI Martked) complete all as specified and directed. |
| 19 | Supply and fixing as in repair 150 mm bore Butterfly valve Cast Iron body, Wafer type integrally moulded close end body construction with Hand lever operated and rating of PN-1.0 confirming to IS : 13095 (ISI Martked) complete all as specified and directed. |
| 20 | S&F as in repair Battery charger with control panel, relays for Tickle and Turbo charger suitable for charging DC voltage 12V upto 10 Amps generator lead acid battery, charger including indicator lamps complete all as specified and directed. |
| 21 | Supply and fixing as in repairs 12 v battery 88 AH make Exide/amron or as per sample kept with AGE E/M complete all as specified and directed. |
| 22 | Supply and Fixing as in repair of 100 mm dia Burden type, stainless steel dial type pressure gauge having calibration of 0-15 Kg/cm2 including brass isolation valve and pipe complete all as specified and directed. |
| 23 | M & L for dismantling the pump of following capacity checking the worn out parts like impeller, shaft, stuffing box, shaft sleeve using Micrometer and transporting to workshop for repairs, check for condition of bearings, removing scales from impeller and pump housing, building the worn out metal of transmission shaft to required level, machining to the required size on lathe machine, grinding and finishing to match the sleeve, and fixing into the housing, re-assembling, transport back to the installation, installing in position, check for alignment with dial gauge, inserting shims where necessary, refixing with coupling, tightening with torque wrench to required level, re-connecting the flanged pipe connections of suction/ delivery including replacement of rubber insertion etc complete, all as directed by Engineer-in-Charge. |
| 24 | (a) 5 to 10 HP Motor |
| 25 | (a) 15/20 HP Motor |
| 26 | (b) 60 HP Motor |
| 27 | Daily maintenance of swimming pool, water quality as per IS:3328 of 1993 & amended 2010, of size 25m x 12.5m x 5.5m deep (Summer & Monsoon) including Sunday & Holidays, by providing one skilled man power with the help of pool maintenance equipment, cleaning pool water by removing deposited mud, silt and all other accumulated material from the bottom and side, channels, by brushing bottom surface with suction/sweeper, also topping up the pool for fresh water required including adding the chemicals for disinfection of water and maintaining desired parameter of water as per IS norms complete all as specified and directed.NOTE :- (i) Swimming pool chemicals shall be issued under relevant item of this schedule for treatment of swimming pool water.(ii) Chemical to be supplied under relevant item of this schedule shall be used in accordance to the directions issued by Engineer-in-Charge.(iii) Contractor shall provide pool maintenance equipment to his workmen deployed on the job. However, the rate of this item shall include this aspect.(iv) Cleaning shall be carried out all as directed by Engineer-in-Charge. |
| 28 | Supply only Plastic cylindrical sealed disposable floating sanitiser station for disinfection of swimming pool with arrangement for controlled release of active ingredients in water and head suspender complete all as specified and directed. |
| 29 | Supply only alum for water treatment in crystal form packed in 50 Kg Bags of make as per approval of accepting officer complete all as specified and directed |
| 30 | Dismantling and opening of existing self priming recirculation pump of single stage/horizontal self priming pump set 3.5 HP/3.26 KW Capacity /flow rate 47.0 m3/hr, Head 14.0 m with pre-filter thermoplastic injected pump casing and replacement of bearing, cleaning of shaft, varnishing of winding, applying grease and reassembling and re-fixing in same position complete all as specified and directed. Note:- Size and make of bearing shall be as per existing one |
| 31 | Supply and fixing in repair of under water illumination standard water proof underwater light LED type 30 W including water proofing jointing, connecting all as specified and directed. Note :- Make and Model shall be as existing one |
| 32 | Supply and fixing as in repairs 5 way multiport valve of suitable size fitted with Pent Air media filter of suitable size as per sample, testing and commissioning complete all as specified and directed. |
| 33 | Supply only Calcium Hypochlorite, Description/ appearance Dry free flowing and free from lumps, Toxic & undesirable substance. Should not induce substances beyond acceptable limit as given in IS10500(2012) in treated and disinfected water, packing 40-50 Kg drums, packing in drums is preferable to reduce fire hazard in places of high ambient temperature, Specification. Available chlorine: 55% by mess Min, stability 1/15 loss of chloride on basis of available chloride, Max Particle size (passing through) 1.70mm IS sieve) 99.5% by mass min water insoluble matter Max 6%, calcium Hydroxide Max 4%, sodium chloride Max 15%, in granular form fortified with corrosion inhibitors and anti scalants for drinking water disinfection complete all as specified and directed. |
| 34 | Repairing of existing panel by disconnecting existing burn out cable/ wiring complete and replaced with 1.5 Sqmm single core copper conductor cable include replacement of Digital Volt meter, Digital Amp Meter alongwith CTs, relays, making connection, replacement of cable lugs of suitable size, replacement of locking arrangement include painting with two coat of synthetic enamel paint complete all as specified and directed.Note : Replacement of contractor, relay, MCCBs will be measured separately. |
| 35 | Supply only digital volt meter 0-500 Volt, with selector switch of size 96 x 96 mm Square flush type complete with wiring complete all as specified and directed. |
| 36 | Supply only digital ammeter 0-100 Amp including CT 100/5 Amp and selector switch complete with electrical connection complete all as specified and directed. |
| 37 | Supply only Indicator lamp LED type of RYB colour , 230 Volts complete all as specified and directed. |
| 38 | Supply only 3 Pole Power Contactor of 70 Amp, 230 V complete all as specified and directed. |
| 39 | Supply only 3 Pole Power Contactor of 32/40 Amp, 230 V complete all as specified and directed. |
| 40 | Supply and fixing in repair fire hydrant landing valve type A (single head outlet) of 63 mm dia of size conforming to IS 5290 complete all as specified and directed. |
| 41 | Supply and fixing in repair fire hydrant landing valve type A (Double head outlet) of 63 mm dia of size conforming to IS 5290 complete all as specified and directed. |
| 42 | S&F in repair Rubber coupling suitable for up to 20 HP motor including CI outer coupling and nuts & bolts complete all as specified and directed. |
| 43 | S&F in repair Rubber coupling suitable for up to 70/75 HP motor including CI outer coupling and nuts & bolts complete all as specified and directed. |
| 44 | S&F in repair Star coupling including CI nuts & bolts suitable up to 15 HP Motors complete all as specified and directed. |
| 45 | Taking down old sand media from swimming pool sand media filters, cleaning the tank from inside for making sand media filter functional, resembling and testing complete all as directed by Engineer-In-Charge. |
| 46 | S&F in replacement of 7.5 HP three phase horizontal open well submersible pump 415 v 50 hz ,Head-28 mtr , min LPM-150 , all required accessories and electrical system for efficient operation included with heavy duty submersible flat cable of adequate length complete all as specified and directed.Note:- (i) The fixing and installation of pump set in open well/sump with proper base support are inclusive of quotated rate. |
| 47 | Supply and replacement of sand media (Silica sand 0.4 to 0.8mm & Pea gravel 1.15 to 5.6mm of size) suitable for swimming pool sand filter model PWT 30, Make Pentair and filtration range must be less than 15 micron complete all as specified and directed. |
| 48 | Supply only calcium hypochlorite granular disinfectant for water treatment, having chlorine content 60% to 70% all as specified and directed by Engineer-In-Charge. |
| 49 | S&F Canvas hose pipe of outer Dia 800 mm suitable for site requirement of fire fighting Complete all as Specified and directed by Engineer-in-charge. Please Enable Macros to View BoQ information |
| 50 | S&F Canvas hose pipe of outer Dia 800 mm suitable for site requirement of fire fighting Complete all as Specified and directed by Engineer-in-charge. Please Enable Macros to View BoQ information |