| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: CWE KARANJA NAME OF WORK: COMPREHENSIVE MAINTENANCE OF B/R AND E/M WORKS LIKE OF STANDBY LT CABLES, REPAIR TO DG SET SHEDS, CONTROL PANELS, SWITCHGEARS, AMF PANELS, EARTHINGS ETC FOR DG SETS INSTALLED AT VARIOUS LOCATION AT NAVAL STATION KARANJA. CONTRACT AGREEMENT: CWE KJ(K)- OF 2026 - 2027 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description of Item of Work Item Code / Make Quantity Unit Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit, if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT TOTAL AMOUNT With Taxes TOTAL AMOUNT (in Words) |
| 2 | Excavation in trenches not exc 1.5 mtr wide and not exc 1.5 mtr depth and getting out in soft/loose soil complete all as specified and directed. |
| 3 | Excavation in trenches exc 1.5 mtr wide and not exc 3.0 mtr depth and getting out in soft/loose soil complete all as specified and directed. |
| 4 | Returning, filling in, including spreading, levelling watering and well ramming in layers n.exc 25cm complete all as specified & directed. |
| 5 | Removing excavated materials to a distance n.exc 50m and depositing where directed at a level n.exc 1.5m above the Starting point all as specified and directed . |
| 6 | Supply and fixing 1.5 SQMM FRLSH PVC insulated three core unsheathed industrial multistrand cable with flame retardent low smoke (FRLSH) properties with flexible bright annealed bare copper conductor for voltage grade upto 1100 V confirming to IS-694:2010 all as specified and directed. |
| 7 | Supply and fixing 2.5 SQMM FRLSH PVC insulated three core unsheathed industrial multistrand cable with flame retardent low smoke (FRLSH) properties with flexible bright annealed bare copper conductor for voltage grade upto 1100 V confirming to IS-694:2010 all as specified and directed. |
| 8 | Supply and erection of steel tubular swaged pole 410 SP 22, 8.5 Mtr long ,swan neck complete with cast iron base plate, finial Taper plug, bolts, nuts, and screws as specified type conforming to IS 2713 complete including 2 coats of aluminium paint over one coat of red oxide zinc chrome primer on external exposed surfaces and 2 coats of black bituminous paint on portion embedded in concrete in internal surfaces of pole including taking out old pole, complete all as specified and directed. |
| 9 | Supply and erection of steel tubular swaged pole 410 SP 22, 8.5 Mtr long complete with cast iron base plate, finial Taper plug, bolts, nuts, and screws as specified type conforming to IS 2713 complete including 2 coats of aluminium paint over one coat of red oxide zinc chrome primer on external exposed surfaces and 2 coats of black bituminous paint on portion embedded in concrete in internal surfaces of pole including taking out old pole, complete all as specified and directed. |
| 10 | Material and Labour for PCC 1:3:6 type C2 using (40 mm gradded stone aggregate) as in foundation of pole, mass filling complete all as specified &directed. |
| 11 | Material and Labour for PCC type B-1, 1:2:4 using (20 mm gradded stone aggregate) as in coping, including form work complete all as specified & directed. |
| 12 | M & L for MCB SP of 6-32 A ,240 V with breaking capacity 16 KA Conforming to IS/IEC 60898-1:2015 all as specified and directed. |
| 13 | M & L for MCB DP of 40 A ,240 V with breaking capacity 16 KA Conforming to IS/IEC 60898-1:2015 all as specified and directed. |
| 14 | Supply and fix in replacement of Astronomical Street Light Switch for daily operation of sunrise/sunset times based on entered location for 16 A-250 V,astronomical function 2x28 Programme, 2 channel all as specified and directed. |
| 15 | Supply & Fix in repair bracket for street light fittings made out of 40 mm bore light grade GI tubing 1.5 m long bent to shape including fabrication work ,clamp ,nut & bolts and applying two coats of aluminium paint over a coat of red oxide zinc chrome primer repair all as specified and directed. |
| 16 | Material and Labour for street light bracket 1.5 mtr long made out of 50mm dia light grade GI tube one and duly welded with 100mm dia 30 cm long GI tube including provision of 4 Nos holes duly threaded for fixing the bracket on the top of existing poles with complete including arrangement of threding and weldeding work required for fixing of street light fitting complete including taking down U/S bracket all as specified and directed. |
| 17 | Material and Labour for preparation of old painted surfaces of steel tubular pole/strut, of any description and in any position 9.00/8.50 Mtr height and scrapping of pole with emery paper and applying two coat of aluminium paint on all the metallic surfaces including protection pipe, clamps, GI pipe bracket of street/security light, and pasting reflector tape 3 different colour for around the pole with applying one coats of white wash painting on coping of pole and numbering of street poles complete all as specified and directed. |
| 18 | Material and Labour for preparation of old painted surfaces of PCC pole of any description and in any position 9.00/8.50 Mtr height and scrapping of pole with applying two coat of cement paint on PCC surfaces and applying two coat of aluminium paint on all the metallic surfaces including protection pipe,clamps, GI pipe bracket of security light, and pasting reflector tape 3 different colour for around the pole with applying one coats of white wash painting on coping of pole and numbering of street poles complete all as specified and directed. |
| 19 | Supply and fix in replacement of Automatic Street Light Switch for three phase Load of 12-18 KW using Infrared Sensor based NATURE SWITCH & Voltage Monitoring System (VMS) for automatic switching of Street Lights. Nature Switch operation should be based on Natural Light Lux* level. Required Illuminance Level for Switching ON is ≤ 60 Lux and for Switching OFF ≥ 10 Lux. The Sensor should also have part night operation facility of min. 4 hrs. to max. 12 hrs. The Sensor along with suitable Power Contactors with 3 nos. Contactors, 3 nos. Incoming MCBs & 3 nos. Outgoing MCBs of 32-40 Amps each. Circuit wiring (Copper) of min.10 sq.mm and Auto-Manual selection option (Sensor By-Pass) should be enclosed in a pole/wall mountable Enclosure made of Rust Proof, Electric Shock Proof, Termite proof and FR grade SMC Junction box including taking down U/S timer switch |
| 20 | Supply, fixing, connecting and testing of integral LED 75 W Tricolour bollard light,system wattage 75 W colour output -saffron, white & green through polycarbonate diffuser,polybody-1 M with epoxy primer & UV stablised PU paint complete including PCC foundation all as specified and directed . |
| 21 | Material and Labour for heat shrinkable jointing kit straight through suitable for LT XLPE UG cable of size 16 to 25 sqmm 3.5 core complete all as specified and as directed. |
| 22 | Earthing with galvanised steel earth plate elctrode 600mm x 600mmx6mm thick buried directley in ground, (earth pit not less than 2.25m below ground level), with the top edge of the plate not less then 1.5 m below the normal ground level, connected to 4 mm GI wire and riveted to earth plate,GI earth wire will be protected by using 40mm bore GI pipe (light grade) from earth plate to equipment and watering pipe 20mm bore (light grade), chamber and coping shall be made in PCC (1:3:6) type C1 using 20mm graded stone aggregate, RCC pit cover 50mm thick in 1:2:4 type B1 using 20mm graded stone aggregate reinforeced with 8mm dia TMT bar @ 80mmc/c both way with lifting hook made out of 8mm dia TMT bar duly embedded in RCC cover in lieu of CI pit cover with angle iron frame including excavation and earth work and removal of surplus soil complete all as shown in electrical plate No 3 of SSR Part I and as specified including charcoal dust, common salt complete and earth lead connected to earthing test point/main point and testing of earthing complete as directed. |
| 23 | Material and Labour for preparation of old painted surfaces of decorative pole of any description and in any position 3 Mtr height and scrapping of pole with emery paper and applying two coat of metallic paint as per existing colour on all the metallic surfaces including with applying one coats of white wash painting on coping of pole complete all as specified and directed. |
| 24 | Taking down highmast light fitting, compontnts etc of any description to working position at site for routine inspection, servicing and greasing of exposed/moving parts such as steel wire rope, lantern carriage ring frame alongiwth flood lights, aviation obstruction light etc , gear mechanism and all accessories, induction motor of any capacity, winch motor, 3 phase and including wire ropes, trailing cable, lugs, winch drum assembly etc, including making connection of cable a fresh and testing on completion after making mast system in same position complete all as specified and directed by Engr-in-Charge. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |