| 1 | Excavation in trenches not exc. 1.5 Mtr wide and not exc 1.50 Mtr in depth for foundation etc. and getting out in soft/loose soil complete all as specified and as directed. |
| 2 | Returning filling in soft/loose soil, including spreading, levelling, watering and well ramming in layers not exceeding 25 Cms complete all as specified and as directed. |
| 3 | Removing excavated soils to a distance not exc 50 Mtr and depositing where directed at a level not exceeding 1.5 Mtr above the starting point complete all as specified and as directed. |
| 4 | Taking out existing 15mm bore galvanized steel tubing and connections from trenches / walls / floors, keeping aside serviceable pipe for reuse and removing unserviceable pipe complete all as specified and as directed. |
| 5 | All as per item No 4. here in before but 20 MM bore tubing. |
| 6 | All as per item No 4. here in before but 25 MM bore tubing. |
| 7 | All as per item No 4. here in before but 40 MM bore tubing. |
| 8 | All as per item No 4. here in before but 50 MM bore tubing. |
| 9 | All as per item No 4. here in before but 80 MM bore tubing. |
| 10 | All as per item No 4. here in before but 100 MM bore tubing. |
| 11 | All as per item No 4. here in before but 150 MM bore tubing. |
| 12 | Supply, laying, jointing and testing of 15 MM bore galvanized steel water tubing, medium grade, with all necessary fittings, laid in trenches or fixed to wall with suitable clamps complete all as specified and directed. |
| 13 | All as per item No 12. here in before but 20 MM bore tubing. |
| 14 | All as per item No 12. here in before but 25 MM bore tubing. |
| 15 | All as per item No 12. here in before but 40 MM bore tubing. |
| 16 | All as per item No 12. here in before but 50 MM bore tubing. |
| 17 | All as per item No 12. here in before but 80 MM bore tubing. |
| 18 | All as per item No 12. here in before but 100 MM bore tubing. |
| 19 | All as per item No 12. here in before but 150 MM bore tubing. |
| 20 | Taking out existing 100mm bore ductile Iron Pressure pipe of size 100 mm tubing and connections from trenches keeping aside serviceable pipe for reuse and removing unserviceable pipe complete all as specified and as directed. |
| 21 | Supply and lay in repair centrifugally cast (Spun) Ductile Iron Pressure Pipe of size 100 mm nominal bore with spigot & socket end, class K-9 conforming to IS: 8329/2000 suitable for (push -on) rubber gasket jointing with centrifugally applied inside cement mortar lining with sulpher resistant cement and external metallic Zinc coating with finishing layer of black bitumen coating on external surfaces in any length laid in trenches complete all as specified and directed. |
| 22 | Taking out gun metal gate valve size 20, 25, 40, 50 mm existing connection in trenches / walls / floors complete all as specified and as directed. Please Enable Macros to View BoQ information |
| 23 | Taking out gun metal gate valve size 20, 25, 40, 50 mm existing connection in trenches / walls / floors complete all as specified and as directed. Please Enable Macros to View BoQ information |