|
| 1 | CENTRALIZED MATERIALS,Loading unloading & safe cartage and errection of new STP/PCC Poles and other materials from Electricity store center, Robertsganj to the work place and proper stocking. (Distance up to 50 Km.) |
| 2 | PCC Pole 8.5 Mtr Long |
| 3 | Top Channel MS 125x65x2240 mm Long |
| 4 | ACSR Weasel conductor |
| 5 | 11 K.V. Disc Insulator T&C Type 4500Kg. With Fitting |
| 6 | MS Channel T-off |
| 7 | 11 KV Pin Insulator (Polymeric) |
| 8 | Al Cable 1x400 Sq MM PVC |
| 9 | LT XLPE Cable 1x400 SQ MM |
| 10 | MS Dropper Angle |
| 11 | 11 KV V-type X-Arm |
| 12 | MS Angle Base |
| 13 | Distribution Box |
| 14 | 11 KV Fuse Set |
| 15 | LT AB Cable (3x50+1x35+1x16) SQ MM |
| 16 | LT AB Cable (3x95+1x70+1x16) SQ MM |
| 17 | LT PVC Cable 3.5x150 sq mm |
| 18 | Al Cable 3.5x70 Sq MM PVC |
| 19 | LT XLPE Cable 1x240 SQ MM |
| 20 | Stay Complete |
| 21 | Earthing Complete |
| 22 | 25 KVA Three Phase T/F, 11/0.4 KV |
| 23 | 63 KVA T/F |
| 24 | 100 KVA T/F |
| 25 | 250 KVA T/F |
| 26 | DE-CENTRALIZED MATERIALS, Provided Contractor |
| 27 | Nut & Bolt Washear |
| 28 | F-Clamp |
| 29 | 11 KV Fuse Set |
| 30 | Cross Arm Holding Clamp, Top, T-off |
| 31 | I Hook |
| 32 | Dead End Clamp With Eye Hook |
| 33 | Suspension Clamp with Eye Hook |
| 34 | Copper Zclamp |
| 35 | 11 Kv TPMO |
| 36 | Al Lug 120 sq mm |
| 37 | LT Conector Type B (Line To DB) |
| 38 | AL Lug 95 sq mm |
| 39 | AL Lug 400/240 sq mm |
| 40 | LT Piercing Connector 120 sq mm |
| 41 | Clamp for DB Box |
| 42 | LT Piearcing Connector 95 SQ MM |
| 43 | (1x35) mm2 Allu Cable For Distribution Box |
| 44 | LT Bar Netural Conector |
| 45 | 250 Kva T/F Plinth |
| 46 | T/F Cemical Earthing |
| 47 | Fensing Of T/F |
| 48 | Work of following materials as Per RESSPO/PuVVNL norms at the work site. |
| 49 | Erection of single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work. |
| 50 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 51 | Grouting of stay with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 52 | Earthing Complete |
| 53 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR WEASEL Conductor, binding with insulators & jumpering. |
| 54 | Distribution Box |
| 55 | Al Cable 1x400 Sq MM PVC |
| 56 | LT XLPE Cable 1x400 SQ MM |
| 57 | 11 KV Fuse Set |
| 58 | LT AB Cable (3x50+1x35+1x16) SQ MM |
| 59 | LT AB Cable (3x95+1x70+1x16) SQ MM |
| 60 | LT PVC Cable 3.5x150 sq mm |
| 61 | Al Cable 3.5x70 Sq MM PVC |
| 62 | LT XLPE Cable 1x240 SQ MM |
| 63 | 25 KVA Three Phase T/F, 11/0.4 KV |
| 64 | 63 KVA T/F |
| 65 | 100 KVA T/F |
| 66 | 250 KVA T/F |
| 67 | 250 Kva T/F Plinth |
| 68 | T/F Cemical Earthing |
| 69 | Fensing Of T/F |
| 70 | Receive Back T/F |
| 71 | 10 KVA T/F |
| 72 | 16 KVA T/F |
| 73 | 25 KVA T/F |
| 74 | 63 KVA T/F |
| 75 | 100 KVA T/F Please Enable Macros to View BoQ information |