| 1 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 2 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 3 | Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 4 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 5 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 6 | Providing additional HT stay insulator in existing stay. |
| 7 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 8 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 9 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 10 | Fitting and providing one HT Fly stay for 11kV pole using A type pole incl. digging & back filling pits. |
| 11 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. |
| 12 | Fitting one set AB switch and giving connection |
| 13 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 14 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 15 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. |
| 16 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 17 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 18 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 19 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 20 | Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling |
| 21 | Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking. |
| 22 | Dismantling one LT 4 line cross arm from existing pole. |
| 23 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls |
| 24 | Dismantling (without damage) one ordinary street light/CFL/LED fitting from the pole and stacking. |
| 25 | Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 26 | Dismantling one damaged HT PSC/RCC Strut pole incl. removal of clamps and stacking. |
| 27 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 28 | Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking. |
| 29 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
| 30 | Additional rate for excavation of one Pit for Coil Earthing in Laterite |
| 31 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. |
| 32 | Additional rate for excavation of Pit for A type pole in Laterite. |
| 33 | 10.2 Structural steel work |
| 34 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 35 | Supplying, laying and fixing 150 mm dia G.I. pipe (medium class) including fixing the pipe with clamps etc complete with G.I. fittings (supporting clamp excluded), excluding the trenching and re-filling. |
| 36 | Laying HT XLPE UG cable (of sizes beyond 3x185 sqmm and upto and incl. 3x300 sqmm) as per specification excl. excavation and backfilling. |
| 37 | Laying HT XLPE UG cable (of sizes upto and incl. 3x185 sqmm) as per specification excl. excavation and backfilling. |
| 38 | Doing HDD along/across roads,supplying & pulling 125mm HDPE pipe and drawing 11kV 3x300Sqmm XLPE UG cable through the pipe,surveying the site for information about UG utilities,restoring the damages if any,closing of pits with normal soil/crusher sand,mounting the cable after providing loop at 1.2m depth, putting HDPE (PN-6,Kg/sq mm) at rising point,making RCC jointing chambers for straight joints,placing route markers at 100m interval, test ing&commissioning(includes cost of transportation of all materials) |
| 39 | Doing one cable end termination on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally. |
| 40 | Doing straight joint on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally as per specification. |
| 41 | Additional rate for providing one disc set on any type of HT pole for making cut point. |
| 42 | Fitting and providing one Strut using A type pole incl. digging & back filling pit. |
| 43 | Mounting the cable ends of all sizes upto and incl. 3x300 sq mm with special type cable clamps incl. cost of extra materials if needed and giving necessary connections. |