| 1 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 2 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works. |
| 3 | Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole. |
| 4 | Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable |
| 5 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 6 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 7 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 8 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. |
| 9 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 10 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 11 | Reshackling one span LT three phase 4 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials. |
| 12 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 13 | Renewal of existing damaged/broken old 11kV Stay to the existing stay rod. |
| 14 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 15 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm0.45x0.45mx5sides. |
| 16 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 17 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 18 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 19 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 20 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 21 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 22 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 23 | Reshackling one span LT single phase 2 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials. |
| 24 | Quoted Amount of BOQ1 in figures |
| 25 | GST Rate in percentage Please Enable Macros to View BoQ information |