| 1 | Transporting poles by hired vehicle to a distance upto5km and carrying upto 4 numbers of poles excludingloading& unloading charges. |
| 2 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 3 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 4 | Stringing of 1.1 kV Aerial bunched cable of size 1 x 25+ 1 x 25 sqmm with bare/insulated Messenger through existing poles |
| 5 | Dismantling (without damage) one km LT singlephase 2 wire OH line conductor by dismantlingcross arms, insulators and stacking the conductors inrolls properly. |
| 6 | Labour charges for loading LT PSC pole from thestacking place and unloading the same at work site(transportation by any vehicle). |
| 7 | Providing Strut using LT PSC pole including diggingand back filling pit in ordinary soil. |
| 8 | Providing Fly stay for LT pole using LT PSC poleincluding digging and back filling pit in ordinary soil. |
| 9 | Additional rate for excavation of one Pit for LTPole/LT Stay in Laterite. |
| 10 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. |
| 11 | Dismantling one damaged LT PSC/RCC pole afterdisconnecting stays, strut etc. attached thereon and stacking the same. |
| 12 | Providing Stay for LT poles including digging & backfilling pit in ordinary soil. |
| 13 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from thepole/structure in ordinary soil & backfilling. |
| 14 | Installation of Insulation piercing connector for mainto service line main :16-95 sqmm, Tap 16-95 sqmm |
| 15 | Transporting LT ABC by hired vehicle to a distance upto 5 km and carring up to 2 drum including loading andun loading using crane |
| 16 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messengerthrough existing poles |
| 17 | Installing One No. 4 way Satellite Connector of sizeMain :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable ofStandard size |
| 18 | Erection of Anchor clamp / dead end clamp for LT ABCof any size |
| 19 | Erection of suspension clamp for LT ABC of any size |
| 20 | Installation of Pre-insulated straight through joints for16sqmm cable |
| 21 | Installation of Pre-insulated straight through joints for50sqmm cable |
| 22 | Installation of Pre-insulated straight through joints for70sqmm cable Please Enable Macros to View BoQ information |