|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 1 All kinds of soil 70% 2.Ordinary Rock 30% |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 8 | Providing and mixing hardening compound of approved quality as per manufacturers specification in cement concrete @6.4 lit/cum |
| 9 | Supply of UPVC Blind pipe 100 Mm dia as per IS:12818 |
| 10 | Labour for Cutting od UPVC pipe in required length placing in Position incl.carrriage loading unloading stacking site (complete Job) |
| 11 | Dumping stone excluding cost of stones. in Horizontal level excluding cost of stone |
| 12 | Carriage of soling stone from avg distance 2 km by MT and 300 m by HL |
| 13 | Supply of Stone |
| 14 | Carriage of Sand and Bajree from nearby source to road side of work at an avg distance of 40 km by MT and 300 m by HL |
| 15 | Carriage of sand and Bajree above from nearby source to road side of work at an avg distance of 40 km by MT and 300 m by HL Please Enable Macros to View BoQ information |