|
| 1 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
| 2 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C. grade M 10 Nominal mix 1:3:6 (Hand mixed) |
| 3 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 Brick masonry in 1:3 cement mortar |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 5 | Providing laying,spreading and compacing stone aggregattes of specific sizes to water bound mcadam spedification including spreading in uniform thickness hand packing, rolling with three wheel 80-100kn static roller in stage to proper grade and camber, applying and brooming, crushable screeining to fill-up the interstices of coarse aggregate, watering and compacing to the required density Grading 3 as Technical Specifiaction Clause 405 |
| 6 | Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. |
| 7 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2:4 (Hand mixed) |
| 8 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 |
| 9 | Providing concrete for Plain/reinforced concrete in open foundation complete as per drawing and technical specification Clasue 802,803,1202 R.C.C grad M 25 |
| 10 | Supplying, fitting and placing TMT bar reinforcement in foundation complete as per drawing and technical specification Clause 1000 & 1202 |
| 11 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
| 12 | Supply and fixing of inauguration program (910X610X 20)mm size as per the format given by the engraving of the craft in V shape by placing it in a place fixed by gold paint by engraving and making iron portable pedestal and automatic for unveiling Curtain installation. The task of making complete arrangements on distance method and after the program to remove the Silapat from the stand and to give the Silapato in the correct position at the designated place as per the instructions given by the concerned officer. i/c all Please Enable Macros to View BoQ information |