|
| 1 | Part- A SupplySTONE PAD |
| 2 | ALLUMINIUM LUG FOR 25KVA/63KVA/100KVA/250KVA DT |
| 3 | LT FUSE PROTECTION UNIT WITH SMC BOX FOR 100 KVA DT WITH NUT AND BOLT |
| 4 | THREE PHASE DISTRUBUTION BOX CLAMP |
| 5 | SUSPENSION CLAMP |
| 6 | EYE HOOK |
| 7 | J HOOK |
| 8 | DEAD END CLAMP WITH HOOK |
| 9 | NUT AND BOLT OF VARIOUS SIZE |
| 10 | PG CLAMP |
| 11 | BARBED WIRE GI |
| 12 | DANGER BOARD |
| 13 | CROSS ARM HOLDING CLAMP WITH BOLT AND NUT |
| 14 | F BRACKET WITH NUT AND BOLT |
| 15 | LT CLAMP WITH BOLT AND NUT FOR PCC POLE |
| 16 | EARTH WIRE CLAMP FOR PCC POLE |
| 17 | LT SHACKLE STRIP WITH BOLT AND NUT FOR LT SECTION |
| 18 | BOLT AND NUT FOR SHACKEL |
| 19 | HOLDING CLAMP FOR TOP T OFF FUSE SET |
| 20 | Z CLAMP CUPPER |
| 21 | I/D&O/D CABLE JOINTING KIT FOR 3*70 XLPE CABLE 11 KV |
| 22 | T OFF CHANNEL WITH CLAMP |
| 23 | PIERCING CONNECTOR |
| 24 | HENLEY TYPE TAILLESS UNIT PROTECTION CUBICAL PANEL 500A 650 V FOR 250 KVA DT |
| 25 | Part- B CarrigeLOADING UNLOADING AND CARRIAGE OF LINE ITEM FROM PADRAUNA STORE TO SITE 0-50 KM WITH SAFETY (i) PCC POLE 8.5 M LONG |
| 26 | PCC POLE 11 M LONG |
| 27 | STP POLE 11 M LONG |
| 28 | ACSR WEASEL/DOG CONDUCTOR |
| 29 | ABC CABLE 3*50/3*90/3*120 SQMM |
| 30 | LT PVC CABLE 3.5*70/3.5*150/3.5*400 SQMM |
| 31 | 3*70/3*120/3*180 SQ MM 11 KV XLPE CABLE |
| 32 | Part-C WorkERECTION OF SINGLE PCC POLE 8.5 M LONG WITH ALL FITTING INCLUDING EARTHING AND GROUTING AS PER STANDARD RESPO |
| 33 | ERECTION OF SINGLE PCC POLE 11 M LONG WITH ALL FITTING INCLUDING EARTHING AND GROUTING AS PER STANDARD RESPO |
| 34 | ERECTION OF DOUBLE PCC POLE 8.5 M LONG WITH ALL FITTING INCLUDING EARTHING AND GROUTING AS PER STANDARD RESPO |
| 35 | ERECTION OF SINGLE STP POLE 11 M LONG WITH ALL FITTING INCLUDING EARTHING AND GROUTING AS PER STANDARD RESPO |
| 36 | STAY COMPLETE AS PER STANDARD RESPO |
| 37 | CONSTRUCTION OF 3PHASE 3WIRE LINE |
| 38 | ERECTION OF ABC CABLE 3*50/3*90/3*120 SQMM |
| 39 | DISMANTLING AND SUBMIT OF OLD AND USED WEASEL CONDUCTOR TO PADRAUNA STORE |
| 40 | CARRIAGE OF 63 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 63 KVA DT WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT AND THEN RETURNING BACK OLD 25 KVA DT TO PADRAUNA STORE. |
| 41 | CARRIAGE OF 100 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 100 KVA DT WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT AND THEN RETURNING BACK OLD 63 KVA DT TO PADRAUNA STORE. |
| 42 | CARRIAGE OF 250 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 250 KVA DT WITH ALL FITTING INCLUDING CHEMICAL EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND TAILLESS UNIT AND THEN RETURNING BACK OLD 100 KVA DT TO PADRAUNA STORE. |
| 43 | PLINTH FOR 250 KVA DT OF SIZE 2*2*1.5 M AND ITS FENCING. |
| 44 | FITTING OF DISTRIBUTION BOX |
| 45 | REPLACEMENT OF CROSS ARM AND ITS FITTING |
| 46 | REPLACEMENT OF PIN INSULATOR AND ITS FITTING |
| 47 | REPLACEMENT OF F BRACKET AND ITS FITTING |
| 48 | FITTING OF SUSPENSION CLAMP/EYE HOOK/J HOOK/DEAD END CLAMP |
| 49 | DISMANTLING OF OLD AND USED ABC CABLE RETURN BACK TO PADRAUNA SORE |
| 50 | CARRIAGE OF 25 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 25 KVA DT ON DOUBLE POLE WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT . |
| 51 | CARRIAGE OF 63 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 63 KVA DT ON DOUBLE POLE WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT . |
| 52 | CARRIAGE OF 100 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 100 KVA DT ON DOUBLE POLE WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT . |
| 53 | CARRIAGE OF 250 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 250 KVA DT WITH ALL FITTING INCLUDING CHEMICAL EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT TAILLESS PROTECTION UNIT . |
| 54 | LAYING OF XLPE CABLE 3*70/3*120/3*180 SQMM 11 KV |
| 55 | INSTALLATION OF 11 KV CT 600/300/A |
| 56 | TREE CUTTING Please Enable Macros to View BoQ information |