| 1 | fo|qr uxjh; forj.k [k.M&VkmugkWy] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r u;s forj.k ifjorZdksa ds LFkkiuk ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k |
| 2 | Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- |
| 3 | 11/0.4 KV T/F 250 kVA |
| 4 | 11 KV XLPE Cable 3X70 sq mm |
| 5 | 11 KV XLPE Cable 3X120 sq mm |
| 6 | PCC Pole 8.5 Mtr |
| 7 | ST Pole 11 mtr long |
| 8 | MS Channel (Dropper) 100x50x2028mm (for fuse set) |
| 9 | MS Top channel (125x65x2240mm) |
| 10 | ACSR Dog conductor |
| 11 | 33 kV Top Channel for Base of Transformer 125X65X3200 mm |
| 12 | 11 KV Disc Insulator T&C type 4500kg. |
| 13 | 11 KV Disc fitting |
| 14 | MS Channel 125x65x1300mm (T-off) |
| 15 | 11 kV Cross Arm |
| 16 | 11 KV Pin insulator (Polymeric) with Fitting |
| 17 | 11 KV TPMO |
| 18 | 11 KV fuse Set |
| 19 | LT PVC Cable Al 1x240sq mm |
| 20 | Stay set Complete 16x1800 sqmm |
| 21 | Earthing of pole by MS earthing rod of 20x2500mm |
| 22 | LT AB Cable (3X120+1X95+1X16) sq mm |
| 23 | Supply of following material/fitting complete in all respect :- |
| 24 | LT Cable 1X35 sq mm |
| 25 | 11 kV Lightening Arrestor |
| 26 | 11 KV C/J Kit 3X70 sq mm |
| 27 | 11 KV C/J Kit 3X120 sq mm |
| 28 | GI Barbed Wire including jumpering |
| 29 | LT Three Phase Distribution box |
| 30 | Clamp for LT Three Phase DB Box |
| 31 | Suspension Clamp with I hook (Insulated) |
| 32 | Dead end Clamp with I hook (Insulated) |
| 33 | Piercing Connector (Insulated) |
| 34 | Red oxide paint |
| 35 | Aluminium paint |
| 36 | Stone pad 300x300x75mm |
| 37 | Clamps for LT T-off with bolts & Nuts |
| 38 | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts |
| 39 | G.I Pipe dia 6 inch |
| 40 | G.I Nuts & Bolts off size |
| 41 | LT Clamps |
| 42 | F Bracket |
| 43 | Danger board Barbed wire including jumper |
| 44 | PG Clamps |
| 45 | Copper L-piece as per relevant IS |
| 46 | Al Leg long barrel off size (LS) |
| 47 | The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that No rainwater gets accumulated on the top. All work will be done as per RESPO Norms & relevent IS Specification. |
| 48 | The excavation of foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of ST/PCC Pole with fixing of necessary clamps & accessories as per required. All required materials such as Holding clamp/STP/LT clamp, F-Bracket, LT shacle insulator, Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).In case of ST Pole making Plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification. |
| 49 | Painting of Pole by double coating Aluminum & Red oxide paint. Paint will be provided by contractor |
| 50 | Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms. |
| 51 | Fabrication, errection, commissioning & Testing of 250 KVA T/F on Double Pole /Plinth with all accessories including make its LT and HT connection. All necessary materials such as Holding clamp, Al.Lugs (Confirming to IS 8309), L Piece , Nuts & Bolts will be supplied by the Contractor. |
| 52 | Erection of TPMO & Fuse set |
| 53 | Fabrication, erection of 11 kV Lightening Arrestor. All work will be done as per RESSPO Norms & relevent IS Specification. |
| 54 | Laying & sagging of LT ABC (3X120+1X95+1X16) Sq.mm. Cable of LT Line with fixing of Distribution Box with Clamp, Insulated Dead end clamp with I hook, Suspension clamp with I hook(Insulated), LT insulated Piercing connector, XLPE 1X35 Sq.mm. Al. cable for enerzing DB, XLPE 1X16 Sq.mm. Al. cable for giving connection to Street Light and nuts&bolts off size by the contractor. |
| 55 | Laying, stringing, sagging, binding and jumpering of ACSR Dog/Weasel conductor for LT/HT Line with fixing of LT Clamps/other clamps, Shackle insulator and nuts&bolts off size as per required. |
| 56 | Laying and dressing of under ground 11 KV Cable by Horizontal drilling method as per RESPO norms. The Depth of horizontal drilling shall be between 2 to 3 meters or as per site required. |
| 57 | Laying and dressing of under ground 11 KV Cable overhead as per RESPO norms. |
| 58 | Making loop & Hoisting of 11 KV XLPE Cable Providing 6'' Dia GI Pipe 3 M Long with complete Work |
| 59 | Erection of Cable Joiting Kits |
| 60 | Pipe Earthing for Distribution Transformer using (1.2 to 1.5 inch) dia GI pipe electrode with 40 ft deep boring, including all material & Labour (Body & Neutral complete as one job) |
| 61 | Construction of T/F plinth of size 2x2x1.2 M with the help of first class brick & 9\\" masonary in the ratio 1:4 cement & sand coarse. Filling the structure completely and plastering outer surface as per RESPO norms. Top of the plinth covered with 4\\" RCC Slab of ratio 1:1.5:3 (Cement, sand & concrete) grouting with 2 No ISMC size 125X65X6 MM (confirming to IS 808:1989) of 2000 mm long for resting. All required materials will be provided by the contractor. |
| 62 | Grill fencing of 11/0.4 KV S/S shall be made of rectangular of size & height approx 2 meter as per site requirement with fabrication 50X50X5 mm angel the frame is also have 1 No Horizontal runner of MS flat 40x5 welded in middle to support of grill, having a gate on road side must have provision of locking arrangement. The work is including painting of fencing as per norms. Work will be done as per RESPO specification. |
| 63 | Supply & Fabrication, Erection of Henley Type Tailess unit protection Cubical Panel 500 A, 650 V for 250 kVA after making Plinth of Height 300 mm above ground level. All work will be done as per RESSPO Norms & relevent IS Specification |
| 64 | Erection of Stay complete as per RESPO Norms |
| 65 | Erection of Danger board with GI Barbed wire |
| 66 | fo|qr uxjh; forj.k [k.M&VkmugkWy] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r ifjorZdksa dh {kerko`f) ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k |
| 67 | Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- |
| 68 | 11/0.4 KV T/F 25 kVA |
| 69 | 11/0.4 KV T/F 63 kVA |
| 70 | 11/0.4 KV T/F 100 kVA |
| 71 | 11/0.4 KV T/F 250 kVA |
| 72 | 11/0.4 KV T/F 400 kVA |
| 73 | PCC Pole 8.5 Mtr |
| 74 | ST Pole 11 Mtr long |
| 75 | MS Channel (Dropper) 100x50x2028mm (for fuse set) |
| 76 | MS Top channel (125x65x2240mm) |
| 77 | ACSR Weasel conductor |
| 78 | 33 kV Top Channel for Base of Transformer 125X65X3200 mm |
| 79 | MS Channel 125x65x1300mm (T-off) |
| 80 | 11 KV Pin insulator (Polymeric) with Fitting |
| 81 | 11 KV TPMO |
| 82 | 11 KV Fuse Set |
| 83 | LT PVC Cable Al 3.5x70 sq mm |
| 84 | LT PVC Cable Al 1x120 sq mm |
| 85 | LT PVC Cable Al 1x400 sq mm |
| 86 | LT PVC Cable Al 1x240sq mm |
| 87 | Earthing of pole by MS earthing rod of 20x2500mm |
| 88 | Supply of following material/fitting complete in all respect :- |
| 89 | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts |
| 90 | Copper L-piece as per relevant IS |
| 91 | Al Leg long barrel off size (LS) |
| 92 | Red oxide paint |
| 93 | Aluminium paint |
| 94 | The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/PCC/STP clamp, Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that No rainwater gets accumulated on the top. All work will be done as per RESPO Norms & relevent IS Specification. |
| 95 | Fabrication, errection, commissioning & Testing of 25/63/100/250/400 T/F on Double Pole /Plinth with all accessories including make its LT and HT connection. All necessary materials such as Holding clamp, Al.Lugs (Confirming to IS 8309), L Piece , Nuts & Bolts will be supplied by the Contractor. |
| 96 | Painting of Pole by double coating Aluminum & Red oxide paint. Paint will be provided by contractor |
| 97 | Dismentling & Carriage of Transformer along with other line materials |
| 98 | Chemical Earthing of Transformer (Body & Neutral complete as one job) for DTR below 100 kVA |
| 99 | Pipe Earthing for Distribution Transformer using (1.2 to 1.5 inch) dia GI pipe electrode with 40 ft deep boring, including all material & Labour (Body & Neutra) above 100 kVA |
| 100 | Construction of T/F plinth of size 2x2x1.2 M with the help of first class brick & 9\\" masonary in the ratio 1:4 cement & sand coarse. Filling the structure completely and plastering outer surface as per RESPO norms. Top of the plinth covered with 4\\" RCC Slab of ratio 1:1.5:3 (Cement, sand & concrete) grouting with 2 No ISMC size 125X65X6 MM (confirming to IS 808:1989) of 2000 mm long for resting. All required materials will be provided by the contractor. |
| 101 | Grill fencing of 11/0.4 KV S/S shall be made of rectangular of size & height approx 2 meter as per site requirement with fabrication 50X50X5 mm angel the frame is also have 1 No Horizontal runner of MS flat 40x5 welded in middle to support of grill, having a gate on road side must have provision of locking arrangement. The work is including painting of fencing as per norms. Work will be done as per RESPO specification. |
| 102 | Supply & Fabrication, Erection of Henley Type Tailess unit protection Cubical Panel 500 A, 650 V for 250 kVA after making Plinth of Height 300 mm above ground level. All work will be done as per RESSPO Norms & relevent IS Specification |
| 103 | fo|qr uxjh; forj.k [k.M&VkmugkWy xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r vfrfjDr ttZj ,0ch0 dscy dks cnyus ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k |
| 104 | Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- |
| 105 | LT AB Cable (3X120+1X95+1X16) sq mm |
| 106 | PCC Pole 8.5 Mtr |
| 107 | Earthing complete |
| 108 | Supply of following material/fitting complete in all respect :- |
| 109 | LT Cable 1X35 sq mm |
| 110 | Nuts & bolts of different sizes |
| 111 | LT pole Clamp with nuts & bolts |
| 112 | LT Three Phase Distribution box |
| 113 | Clamp for LT Three Phase DB Box |
| 114 | Suspension Clamp with I hook (Insulated) |
| 115 | Dead end Clamp with I hook (Insulated) |
| 116 | Piercing Connector (Insulated) |
| 117 | The excavation of foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of PCC Pole with fixing of necessary clamps & accessories as per required. All required materials such as Holding clamp/PCC/LT clamp, Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).In case of ST Pole making Plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESSPO norms & relevent IS Specification. |
| 118 | Earthing of PCC Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms. |
| 119 | Laying & sagging of LT ABC (3X120+1X95+1X16) Sq.mm. Cable of LT Line with fixing of Distribution Box with Clamp, Insulated Dead end clamp with I hook, Suspension clamp with I hook(Insulated), LT insulated Piercing connector, XLPE 1X35 Sq.mm. Al. cable for enerzing DB, XLPE 1X16 Sq.mm. Al. cable for giving connection to Street Light and including disconnection & reconnection of consumer cables, nuts&bolts off size by the contractor. |
| 120 | Dismentling & Carriage of Old Line including Pole |
| 121 | fo|qr uxjh; forj.k [k.M&VkmugkWy] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r 11 ds0oh0 ,y0,0 dks cnyus ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k |
| 122 | Supply & Erection of 11 kV Lightning Arrestor complete in all respect, including mounting arrangement, nuts, bolts, clamps, connecting hardware, earthing connection and all allied accessories as per specification and RESPO norms, including labour, testing & commissioning for proper operation. Please Enable Macros to View BoQ information |