| 1 | Dismentling of C.C. Road and stacking with old materials including supply of all materials, labour,T&P etc. complete. |
| 2 | Excavation of earth for pipe line trenches with lift upto 1.5 and lead upto 50M filling back the earth into trenches includind watering, ramming and disposal of surplus material with in 50M lend etc, complete. Excavation for ordinary soil @ 70% of 24.00 Cum |
| 3 | Excavation in mixed soil with bajri, kankar, Mooram @ 30% of 24.00 Cum |
| 4 | Cartage of pipe from market to the site with Loading, Unloading, Labour etc. all Complete work. |
| 5 | Barricading Charge for excavation of pipe line with all labour, materials TTP etc. all Complete work. |
| 6 | Supply of 90 mm dia size of PVC pipe 6kg/cm2 pressure of ISI mark approved quality Make Prakash/Kishan etc. |
| 7 | Laying of PVC pipe ISI mark approved quality with jointing leveling etc all Complete work. |
| 8 | S/F of PVC Special for Laying of Pipe Line with Tee, Band etc. @15% of Item no.5 with all Complete. |
| 9 | Supply of solvent cement |
| 10 | Supply of 100mm of C.I. sluice valves with cap, capable of with standing working pressure of 10 kg/cm2 including F.O.R. destination and all taxes and insurance etc |
| 11 | Carting of CI Sluice valve from Market to site with Fixing in Line of work lowering the same into trenches and fixing in position and jointing the same with supply of all material and testing etc. all Complete |
| 12 | S/f of 100 mm dia C.I. Tail Piece ISI approved quality |
| 13 | Supply of all material T&P etc construction of slulce Valve chamber as per direction of slte I/C Surface Box type chember with Wall Plastring & R.C.C. slab, Labour, T&P etc. all Comptete work |
| 14 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km. From the site of work and including wateing, ramming dressing etc.Rate to include cost of all materials,lebour and T&P etc.required for proper completion of the work. |
| 15 | Re- instatement of C.C. Road charges to be paid to P.W.D/Local Body. |
| 16 | Supply of all materials, labour T&P and provide Inter connection of new pipe line with old existing pipe line. Please Enable Macros to View BoQ information |