|
| 1 | For HT/LT Line Shifting Village Betwanala to Jarigawan Marg.The following works involves. |
| 2 | Supply of Stay Clamp |
| 3 | Supply of Nut & Bolt |
| 4 | Supply of LTMS Clamp for PCC Pole |
| 5 | Supply of 11 KV F Clamp for PCC Pole |
| 6 | Supply of Holding Clamp For Top/Dropper Channel |
| 7 | Supply of Eye Hook |
| 8 | Supply Stay Insulator |
| 9 | Supply of Gaurding Angle Clamp |
| 10 | Supply of Dead End Clamp |
| 11 | Supply of PG Clamp For Earthwire |
| 12 | Carriage of PCC Pole From ESC, Sitapur to Dump Site, Sitapur |
| 13 | Carriage of ACSR Weaseal Conductor From ESC, Sitapur to Dump Site |
| 14 | Carriage of AB Cable LT (3x50+1x35+1x16 sqmm) From ESC, Sitapur to Dump Site |
| 15 | Carriage of other Line Material From ESC, Sitapur to Dump Site, Sitapur |
| 16 | Shifting of PCC Pole From Dump Site, Sitapur to work site |
| 17 | Shifting of ACSR Weaseal Conductor From Dump Site, Sitapur to work site |
| 18 | Shifting of AB Cable LT (3x50+1x35+1x16 sqmm) From Dump Site, Sitapur to work site |
| 19 | Shifting of other Line Material From Dump Site, Sitapur to work site |
| 20 | Erection of Single PCC Pole with all fitting |
| 21 | Erection of Double PCC Pole with all fitting |
| 22 | Fabrication of Top, T-off, Dropper Chaneel etc. |
| 23 | Laying Stringing and sagging of ACSR Weaseal |
| 24 | Laying stringing and sagging of AB Cable LT (3x50+1x35+1x16 sqmm) |
| 25 | Fixing of Stay |
| 26 | Earthing of Pole |
| 27 | Dismentel of Old line HT/LT |
| 28 | Grouting of Pole |
| 29 | Grouting of Stay |
| 30 | Safe Carriage of old used/Jarjar Scrap Material From work site to JE Store/ESC, Sitapur Please Enable Macros to View BoQ information |