| 1 | For Shifting of HT/LT Line From Village Pahala Ashram to Kakarghata Pul.The following works involves. |
| 2 | Supply of LTMS Clamp for PCC Pole |
| 3 | Supply of Stay Clamp |
| 4 | Supply of PG Clamp for Earthwire |
| 5 | supply of Disc Fitting 45 KN |
| 6 | Supply of Gaurding Angle Clamp |
| 7 | Supply of Stay Insulator |
| 8 | Supply of 11 KV F Clamp |
| 9 | Supply of Holding Clamp for Top/Dropper Channel |
| 10 | Supply of Dead End Clamp |
| 11 | Supply of Eye Hook |
| 12 | Supply of Nut & Bolt |
| 13 | Carriage of PCC Pole From ESC, Sitapur to Dump Site |
| 14 | Carriage of ST Pole From ESC, Sita pur to Dump Site |
| 15 | Carriage of ACSR Weaseal Conductor From ESC, Sitapur to Dump Site |
| 16 | Carriage of AB Cable LT (3x50+1x35+1x16 sqmm) From ESC, Sitapur to Dump Site |
| 17 | Carriage of other line material From ESC, Sitapur to Dump Site |
| 18 | Shifting of PCC Pole From Dump Site to work site |
| 19 | Shifting of ST Pole From Dump Site to work site |
| 20 | Shifting of ACSR Weaseal Conductor From Dump Site to work site |
| 21 | Shifting of AB Cable LT (3x50+1x35+1x16 sqmm) From Dump Site to work site |
| 22 | Shifting of other line material From Dump Site to work site |
| 23 | Fabrication of Top, T-off, Dropper Chaneel etc. |
| 24 | Erection of Single PCC Pole with all fitting |
| 25 | Erection of Double PCC Pole with all fitting |
| 26 | Erection of 11 mtr ST Pole With all Fitting |
| 27 | Laying Stringing and sagging of ACSR Weaseal Conductor |
| 28 | Laying stringing and sagging of AB Cable LT (3x50+1x35+1x16 sqmm) |
| 29 | Fixing of Stay |
| 30 | Earthing of Pole |
| 31 | Dismental of old line and pole |
| 32 | Grouting of Pole |
| 33 | Grouting of Stay |
| 34 | Safe Carriage of old used/Jarjar Scrap Material From work site to JE Store/ESC, Sitapur Please Enable Macros to View BoQ information |