| 1 | Loading Carriage and unloading of PCC/ST pole from Electricity store center Unnao /Sub Station store/other site to site work as per required and vice versa. Distance 0-70 Km. |
| 2 | Loading Carriage and unloading of New and old CT/PT unit from ESC store Unnao/Sub station store/other site to site work as per required and vice versa. |
| 3 | Loading Carriage and unloading of 11 KV Pilfer Proof metering cubical from ESC store Unnao/Sub station store/other site to site work as per required and vice versa. |
| 4 | Carriage all type loose line material from ESC store Unnao/Sub station store/other site to site work as per required and vice versa. |
| 5 | HT XLPE Cable 3X70 sqmm/3X120 SQmm 11 KV |
| 6 | 11 KV Jointing Kit of diff. size |
| 7 | ACSR Weasel Conductor |
| 8 | Three Phase A.B. Cable of diff. Size |
| 9 | LT PVC Cable size 1x400 sqmm |
| 10 | Erection of PCC pole for fitting of X-Arms, brackets insulators and other hardware fittings. |
| 11 | Erection of Double PCC Pole structure including digging of pit and fitting of all accessories complete. |
| 12 | Placement of 10/16 KVA T/F & 25/63/100 KVA Transformer on Existing damage single /Double pole and Re-Installation and commissioning old T/F on new single/double pole in same place including dressing damaged cable, lugs, jumping & connecting Earthing of body & neutral as per required. |
| 13 | Carriage of damaged T/F 25/63/100/160/250/400 KVA under UGP from site tom ESC store Unnao and carriage of healthy T/F From store Center Unnao To Dump Site |
| 14 | Bore Type Earthing work for installed power/D.T. Transformer, pilfer and CT/PT unit as per RESPO norms by way of boring and lowering of 'B' class G.I. Pipe\\" Dia from ground up to the water level (minimum 30 ft. Deep) with a solid cone at the lower end of G.I. Pipe connecting and bringing out contineous G.I Strip size 32x5 mm. from the cone to the ground surface. |
| 15 | Laying, stringing and sagging of O/H Three Phase L.T. line by ABC of diff. size including all associated work with joint/jumpers and binding of insulator as required. |
| 16 | Laying of HT XLPE 11 KV cable size 3X70 sqmm/3X120 sqmm, dragging of trench 1050 mm. deep 520 mm wide, including all materials etc./overhead on pole as required on site |
| 17 | Laying, stringing and sagging of 33 KV/11 KV/L.T. Line by ACSR conductor including all associated works and making clearance of road with joints/jumpers and binding of insulators as required |
| 18 | Replacement and Installation testing and commissioning New/old 11 KV/33 KV CT/PT unit and all related work. |
| 19 | Installation of new 11 KV Pilfer Proof metering cubical in metering Room |
| 20 | Supply and fixing holding clamps for PCC/STP with nuts & Bolts |
| 21 | Supply and fixing Stay clamps for PCC/STP with nuts & Bolts |
| 22 | Supply and fixing F clamps for PCC/STP with nuts & Bolts |
| 23 | Supply and fixing LT Shackle Insulator with N& B |
| 24 | Supply and fixing LT clamp with N&B |
| 25 | Making & fixing of cable box for 11 KV 3x70 to 3x300 mm2 for XLPE cable (Jointing Kit/Cbale box/ O/D and I/D cable box providing by department) |
| 26 | Grouting of pole with cement brick ballast and coarse sand as per standard specifications. |
| 27 | Repositioning of tilted PCC/ST pole |
| 28 | Repositioning of tilted ST pole by welding with 4 No. iron angle with proper grouting and plinthing of ST pole |
| 29 | Fixing of stay rod and its erection and grouting by fitting of stay clamp, stay wire and its proper binding and tighting etc. |
| 30 | Chopping of tree branches lying in te route of existing line touching the tree branches to the phase line conductor as per requirements of site. |
| 31 | Carriage of old scrap and all type of material from work site to store center Unnao with loading unloading. Please Enable Macros to View BoQ information |