| 1 | Details of work |
| 2 | INCREASING CAPACITY OF 33/11KV SUB STATION NEW PHAPHAMAU UNDER EUDD-TAGORE TOWN, PRAYAGRAJ |
| 3 | Laying of 11 KV 3 x 300 Sqmm. XLPE power cable by digging 0.75 Mtr. deep trench, putting layer of sand in the bottom, ramming it, laying of cable over it RMT and covering the cable from sides and top by laying bricks, finally covering the same by earth and levelling of the same, all the materials, except cable, will be pvovided by the contractor. |
| 4 | Installation of 33/11 KV 10 MVA T/F on the transformer plinth. This work includes dragging loading, shifting, lifting and complete assembling after placing on the plinth. All special and ordinary T&P is to be arranged by the contractor. Special care is to be taken to avoid tilting of T/F and loss of transformer oil. Any damage in T/F will be chargeable to contractor. |
| 5 | Replacement of complete 33 KV P.T (03 NO) on existing structure in switchyard .Work includes complete fitting of P.T. on structure carefully with making all connections of control cable . All require material as Nut bolts washer etc except 33 KV PT provided by contractor. |
| 6 | Replacement of complete 33 KV C.T. (03 NO) on existing structure in switchyard .Work includes complete fitting of P.T. on structure carefully with making all connections of control cable . All require material as Nut bolts washer etc except 33 KV CT provided by contractor. |
| 7 | Replacement of Damaged Jumfer in Switch yard as require related work with PG clamp with nut and bolts, T Connector (All require material as PG Clamp etc provided by contractor except Panther conductor. |
| 8 | Replacement of complete 33 KV L.A. (03 NO) on existing structure in switchyard .Work includes complete fitting of P.T. on structure carefully with making all connections of control cable . All require material as Nut bolts washer etc except 33 KV L.A. provided by contractor. |
| 9 | Special earthing of T/F neutral by boring 2\\" dia 60 feet long G.I. pipe in the wet earth and connecting it with 35x6 mm. G.I. strip to T/F neutral giving half round turn at the T/F. Two separate earthing to be provided to T/F body by connecting it with earth mat by special earthing arrangement for earthing work. Material like strip of size 50x6/35x6 mm and G.I. pipe 2” dia 2.9 mm thick. All the material shall be provided by the contractor.(As per RESSPO) |
| 10 | Soil filling, Leveling and Reparing of existing complete boundry wall with flaster of substation boundory wall |
| 11 | Installation of 24 VOLT BATTERY AND BATTERY CHARGER WITH CABNET in the switch gear room, by grouting base channel 100 x 50 x 6 x 1000mm. Fixing of rag bolt. |
| 12 | Instalation of cable stand with grouting and painting in switch yard cable stand provided by contractor |
| 13 | Fixing of termination of 11 KV cable boxes, Boxes will be of Heat Shrink indoor type and outdoor type will be arranged by the contractor |
| 14 | Outdoor jointing kit 3x 300 sq mm |
| 15 | Indoor jointing kit 3x 300 sq mm |
| 16 | Openning of power transformer Earthing ( body and newtral) |
| 17 | Opening of power transformer Primary and secondary Connections |
| 18 | Safe Dismantilng of old 5MVA T/F after opening Transformer earthing and HT/LT coonections |
| 19 | Cartage of Old receive back 5 MVA Power Transformer from work site to Central store. Including loading and unloading of transformer. |
| 20 | Construction of 2nd Point 250 KVA T/F with 11 KV Hanging and L.T. Line including loading and unloading of material in EUDD-Tagore Town Prayagraj |
| 21 | Erection of sub station type double pole struucture at 11m long STP with mounting of all accessories like 11 kv fuse set, TPMO, top channel, Dropper Channel , Sub Station Base, Bracing angle Channels, nuts & Bolt with clamps etc. (All required material for double pole structure & all grouting material provided by contractor except S.T.Pole, Channels, Fuse set ,TPMO) as per RESSPO norms. |
| 22 | Erection of sub station type double pole struucture at 9 m long PCC with mounting of all accessories like 11 kv fuse set, TPMO, top channel, Dropper Channel , Sub Station Base, Bracing angle Channels, nuts & Bolt with clamps etc. (All required material for double pole structure & all grouting material except S.T.Pole, Channels, Fuse set , TPMO provided by contractor ) as per RESSPO norms. |
| 23 | Eerection of 11 mtr long STP support with fixing of necessary clamps and other accessories. (All material provided by contractor except S.T.Pole ) |
| 24 | Earthing of Pole by MS earthing Rod of 20x2500 mm and 6 SWG earthing wire etc. (All material provided by contractor except earthing Rod and GI wire) |
| 25 | Hanging of single 11 KV 3x120 sq mm XLPE cable with the help of stay wire 7/10swg, Nut and bolts, MS Channel, I hook, and clamp.( All material provided by contractor except 11 KV 3x120 sq mm XPLE Cable and Stay wire ) |
| 26 | Fixing of following 11 KV Heat Shrinkable Type Cable Termination kits conforming to VDE-0278/1EEE-48-1975/IS – 13573-1992 and ESI STD. 09-13 all other relevant Standards complete with all accessories for 11 KV, 3x120 sq mm XLPE cable. (Jointing kit will be arranged by the contractor). |
| 27 | Outdoor jointing kit. |
| 28 | Straight Through Jointing Kit |
| 29 | Mounting of 250 KVA T/F on D/P along with HT/LT connection with support of D.D. wire 70 sq mm, 400sq mm long baarrel All Lugs, Cupper Z Clamp Sutaible for 400 KVA T/F, nut and bolts atc.(All materials will be arranged by the conctractor Complete in all respect as per Resspo and Electrical Safety rule,execpt T/F.)) |
| 30 | Earthing of transformer body and neutral by lowering Chemical pipe Earthing of size 2.0” dia 10’ deep, connecting with GI Strip of size 50x6 mm with clamp. (All materials will be arranged by the conctractor) |
| 31 | Installation of L.T. PVC cubical Box ( 400 amp, 3 phase 4 wire, Aluminium busbar with indicator, and fusing arrangement systme) on double pole ,with the help of channel ,clamp & nut bolt etc. and as per Instruction of Engineer Fixing of Telless Unit 500 A and 300 A with provide a propper rrangement (All materials ie LT Cubical box Clamps,Telless Units, Channels etc will be arranged by the conctractor) as per sample provided by department. |
| 32 | Laying of L.T. cable of size 1x240 sq mm.from T/F LT Bushing to LT Cubical/LT Pole and suitably connection with 240sq mm long baarrel All Lugs at both ends.Lugs provided by contractor. |
| 33 | Laying of L.T. cable of size 1x400 sq mm.from T/F LT Bushing to LT Cubical/LT Pole and suitably connection with 400 sq mm long baarrel All Lugs at both ends.Lugs provided by contractor. |
| 34 | Errection & grouting of stay rod with cement, sand and bricks ballast in ratio 1:4:8 and fasteniong the stay wire with pole and stay rod nozzling (All require materials with Stay rod 16X1800mm, Stay wire7/10 swg, 5 KG, Stay clamp,Loop Insulator Bolt & nut will be arranged by the conctractor except Stay Rod and Stay Wire} |
| 35 | Erection of single support pole 9 mtr long STP for LT line, including fixing of necessary clamps, angle, channel and insulator,Nut & Bolts etc (All materials will be arranged by the conctractor except 9 m ST Pole) |
| 36 | Erection of single support pole 9 mtr long PCC for HT line , including fixing of necessary clamps, angle, channel and insulator,Nut & Bolts etc (All materials will be arranged by the conctractor except 9 m PCC Pole) |
| 37 | Erection of single support pole 8.5 mtr long PCC for LT line , including fixing of necessary clamps, angle, channel and insulator,Nut & Bolts etc (All materials will be arranged by the conctractor except 8.5 m PCC Pole) |
| 38 | laying and stringing of LT ABC (size 3x120+1x95+1x16) sq.mm with Spreading and stringing of 1 wire continuous wesel conductor for neutral including binding of insulator complete in all respect with LT clamp, dead End Clamp, i hook, Suspention Clamp,Piercing Connector ,LT Arms, with nut bolts, LT Shackle Insulator The work includes jumpering/connecting of conductor .(All Material provided by contractor Except ABC Conductor and Weasel Conductor) |
| 39 | Errection & Commissioning of 3 Phase LT distribution boxes/kiosk on poles including all clamps & materials required for connections & sealing its connection in between Distribution Box & ABC 1x35/16 sq. mm LT PVC cable with required materials (All require materials ie D.B., clamp, insulator, piercing Connector, 1x35 and 1x16 sq mm cable, nut & bolts etc will be arranged by the conctractor) |
| 40 | Grouting of ST Pole, grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly .(as per RESSPO) All material provied by contractor. |
| 41 | Painting of 11/9 ST Pole with Calmp and Channel 1 coat Red Oxide and 2 coat Alluminium Paint |
| 42 | Disconnection and Reconnection of existing Consumer service cable/line |
| 43 | Single phase |
| 44 | Three phase |
| 45 | Cutting of tree branches :- |
| 46 | Smal Branches |
| 47 | Big Branches |
| 48 | Restoration Charges of existing utilities |
| 49 | Telephone, Sever Line etc. |
| 50 | CONSTRUCTION OF 11 KV 3X185 SQ MM UNDERGROUND LINE UNDER DEFFERENT PLACE UNDER EUDD- TAGORE TOWAN, PRAYAGRAJ |
| 51 | Eerection of 11 mtr double pole support with fixing of necessary clamps, Cross Brecing angle ,danger bord ,number plate , barbed wire and other accessories etc..(as per RESSPO) All material provied by contractor axcept 11 M Long St pole, Channels and Insulators |
| 52 | Grouting of ST Pole, grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly .(as per RESSPO) All material provied by contractor. |
| 53 | Earthing of support (11 m pole) complete with the help of M.S. rod 20 mm dia and 2.54 mtr. long, fastening of G.I. wire with clamps/X-arm/support to M.S. earth rod. As per Resspo and Electrical safety rules.(All Material Provided by Contractor except earthing road and GI Wire. |
| 54 | Painting of ST Pole and Channel & Clamps ( double coad red oxide and double coat Alluminium paints. Painting materials provided by contrctor.) |
| 55 | Laying of 11 KV 3x185 sq mm XLPE cable by by machine drill method. The cable shall be laid at the depth of 1050 mm from the surface of road including cartage.The cable shall be laid strictly in compliance to RESSPO Norms . (All required material except 11 KV Cable provided by Contractor) |
| 56 | Laying of cable by machine drill method with the help of HDPE in all horizontally under the road, minimum1050 mm bellow from the surface for laying of HDPE Pipe and laying of 11 KV 3x185 sq m,m XLPE cable in 6'' dia HDPE Pipe including cartage. (HDPE pipe will be provided by contractor except 11 KV XLPE cable) |
| 57 | Drilling in all horizontally to cross the road, 900 mm bellow from the surface for laying of HDPE Pipe and laying of 11 KV.3x185 sq mm XLPE cable in 6'' dia HDPE Pipe . HDPE pipe and Fixing clamp with nut and bolts will be provided by contrctor. |
| 58 | Hoisting of 11 KV 3x185 sq mm XLPE cable providing GI pipe of size 4” dia 3 M long on double pole including its jumpering, complete with Channel ,clamps, nut & bolts. (All meterials will be provided by contractor except 11 KV,3X185 sq mm cable) |
| 59 | Fixing of termination of 11 KV cable boxes Boxes will be of Heat Shrink indoor type and outdoor type and STR will be arranged by the contractor |
| 60 | Outdoor jointing kit 3x 185 sq mm |
| 61 | EXECUTION OF FOLLOWING WORKS FOR INCREASING CAPACITY OF 63 KVA To 100 KVA and 100 KVA To 250 KVA T/F UNDER EUDD- TAGORE TOWN, PRAYAGRAJ |
| 62 | Dismentalling of all the HT/LT connections & earthing of old 11/.4 KV 63 KVA Transformer along with loading carriage & unloading of same of 63 KVA T/F from site to dump/central store Naini. |
| 63 | Dismentalling of all the HT/LT connections & earthing of old 11/.4 KV 100 KVA Transformer along with loading carriage & unloading of same of 100 KVA T/F from site to dump/central store Naini. |
| 64 | Mounting of 100 KVA T/F on D/P /plinth along with HT/LT connection with support of D.D. wire 70 sq mm, 240 sq mm long baarrel All Lugs, Cupper Z Clamp Sutaible for 100 KVA T/F, Top Channel for Sub Sation base, nit and bolts atc.(All materials will be arranged by the conctractor excluding 100 KVA T/F and channels) |
| 65 | Mounting of 250 KVA T/F on D/P /plinth along with HT/LT connection with support of D.D. wire 70 sq mm, 240sq mm long baarrel All Lugs, Cupper Z Clamp Sutaible for 250 KVA T/F, Top Channel for Sub Sation base, nit and bolts atc.(All materials will be arranged by the conctractor excluding 250 KVA T/F) |
| 66 | Repairing/Making New of fencing with painting of Tanformer Plinth (all require material cement ,A class Briks, cement, Stones, Sand, fenging MS angle Provided by Contrctor) |
| 67 | Earthing of transformer body and neutral by lowering Chemical pipe Earthing of size 2.0” dia 10’ deep, connecting with GI Strip of size 50x6 mm with clamp. (All materials will be arranged by the conctractor) |
| 68 | Installation/ Replacement of Tailless Unit 500 A, and copper Bus Bar with the help of channel ,clamp & nut bolt etc. as require (All materials will be arranged by the conctractor) |
| 69 | Installation of L.T. cubical Box on double pole ,with the help of channel ,clamp & nut bolt etc. (All materials will be arranged by the conctractor) |
| 70 | Laying of L.T. cable of size 3.5x400 sq mm.from T/F LT Bushing to LT Cubical/LT Pole and suitably connection with 400 sq mm long baarrel All Lugs at both ends.Lugs provided by contractor. |
| 71 | Laying of L.T. cable of size 1x400sq mm.from LT Cubical to LT Pole and suitably connection with 240sq mm long baarrel All Lugs at both ends.Lugs provided by contractor. |
| 72 | Laying of L.T. cable of size 3.5x240 sq mm.from T/F LT Bushing to LT Cubical/LT Pole and suitably connection with 240sq mm long baarrel All Lugs at both ends.Lugs provided by contractor. |
| 73 | Laying of L.T. cable of size 1x240 sq mm.from LT Cubical to LT Pole and suitably connection with 240sq mm long baarrel All Lugs at both ends.Lugs provided by contractor. |
| 74 | Replacement /Installation of 11 KV TPMO set & making of 11 KV Bus Bar on D/P or four pole.(All require materials will be arranged by the conctractor except 11 KV TPMO) |
| 75 | Replacement /Installation of D.O. fuse set & making of 11 KV Bus Bar on D/P or four pole.(All require materials will be arranged by the conctractor except 11 KV DO Fuse set) |
| 76 | Earthing of support (11/9 m pole) complete with the help of M.S. rod 20 mm dia and 2.54 mtr. long, fastening of G.I. wire with clamps/X-arm/support to M.S. earth rod. As per Resspo and Electrical safety rules.(All Material Provided by Contractor except earthing road and GI Wire. |
| 77 | Carriage with loading and unloading of Material from Store Center to Work sites/Dump Stores and vise versa if any material balance after execution. |
| 78 | Cartage of 11 KV 3x 300 sq mm XPLE cable from Store to dump store/work Site Including loading and unloading. |
| 79 | Cartage of 10 MVA Power Transformer from Store to dump store/work Site Including loading and unloading |
| 80 | Cartage of ACSR Panther Conductor from Store to dump store/work Site Including loading and unloading |
| 81 | Cartage of 33 CT, PT, Battery and Battery Charger and Lithing Arrester from Store to dump store/work Site Including loading and unloading |
| 82 | Cartage of 11/9 Mtr STP from Store to dump store/work Site Including loanding and unloading |
| 83 | Cartage of 9/8.5Mtr PCC from Store to dump store/work Site Including loanding and unloading |
| 84 | Cartage of 250 kva Transformer from Store to dump store/work Site Including loanding and unloading |
| 85 | Cartage of LT 1x240sqmm from Store to dump store/work Site Including loanding and unloading |
| 86 | Cartage of LT 1x400sqmm from Store to dump store/work Site Including loanding and unloading |
| 87 | Cartage of LT 3.5x240 sqmm from Store to dump store/work Site Including loanding and unloading |
| 88 | Cartage of LT 3.5x400sqmm from Store to dump store/work Site Including loanding and unloading |
| 89 | Cartage of 3X120 SQ MM xlpe 11 KV XPLE CABLE from Store to dump store/work Site Including loanding and unloading |
| 90 | Cartage of ACSR Wesel Conductor from Store to dump store/work Site Including loanding and unloading |
| 91 | Cartage of LT ABC from Store to dump store/work Site Including loanding and unloading |
| 92 | Cartage of 11 KV 3x185 sq mm XPLE cable from Store to dump store/work Site Including loading and unloading. |
| 93 | Cartage of 100 kva Transformer from Store to dump store/work Site Including loanding and unloading |
| 94 | Cartage of 11 KV TPMO set, 11 KV 3 phase DO Fuse set from Store to dump store/work Site Including loanding and unloading |
| 95 | Cartage of Other Line Material as Stay set, Stay wire, Earthing Rod GI wire etc from Store to dump store/work Site Including loanding and unloading Please Enable Macros to View BoQ information |