| 1 | Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Bahraich to the work site/dump site. All the material at Sl. No. 1 shall be given by department and rest all the material including civil material will be arranged by the contractor itself. Any other material if required for completion of work which might not have been mentioned in bid document, shall be arranged by the contractor. (De-Centralized Items Provided by the Contractor as per Estimate). |
| 2 | Cartage of PCC Pole 8.5 Mtr. Long |
| 3 | Cartage of PCC Pole 11 Mtr. Long |
| 4 | Cartage of MS Channel 100*50 mm 2400 mm Long |
| 5 | 11 kv V Type steel X Arm |
| 6 | Tee Off Channel |
| 7 | Carriage of ACSR Weasel Conductor |
| 8 | Carriage of ACSR Dog Conductor |
| 9 | Carriage of 33 kv XLPE Cable 3*300sqmm |
| 10 | Carriage of 33 kv Cable Jointing Kit O/D |
| 11 | Carriage of 11 kv XLPE Cable 3*185sqmm |
| 12 | Carriage of 11 kv 3*185 mmsq O/D & I/D Jointing Kit |
| 13 | Carriage of 11 kv cable O/D Jointing Kit |
| 14 | Stay set Complete |
| 15 | Carriage of other line material |
| 16 | Erection workMinium depth of laying from ground surface to the top of cable as per IS is-i) Low Voltage (1.1 KV) and Control Cable - 0.75 Mtr.ii) 3.3 KV to 11 KV Cables - 0.90 Mtr.iii) 22 KV to 33 KV Cables - 1.05 Mtr.iv) Cables at Road Crossing - 1.00 Mtr. v) Cables at railway level crossings (measured from bottom - 1.00 Mtr.of sleepers to the top of Pipe)Note 1) - The depth may be increased but not more than 1.6 M2)- The standard depth and width for laying the cable are also attached (as per letter No. 561/Director(Tech.)/MVVNL/Camp/Dt. 09-01-26 561 with the tender form. |
| 17 | Erection of Singal PCC Pole (8.5 Mtr Long) for 11 KV/HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 18 | Erection of Singal PCC Pole (11 Mtr Long) for 11 KV/HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 19 | Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely. All required materials shall be provided by the contractor at his own cost. |
| 20 | Errection & Commissioning of MS MS Channel 100*50 mm 2400 mm Long including fitting of Accessories (All Accessories shall be Provided by the Contractor). |
| 21 | Errection/Commissioning/Fixing of 33 kv Cable Jointing Kit O/D including fitting of Accessories (All Accessories shall be Provided by the Contractor). |
| 22 | Errection/Commissioning/Fixing of 11 kv Cable Jointing Kit O/D & I/D including fitting of Accessories (All Accessories shall be Provided by the Contractor). |
| 23 | Errection/Commissioning/Fixing of 11 kv Cable Jointing Kit O/D including fitting of Accessories (All Accessories shall be Provided by the Contractor). |
| 24 | Dragging & Laying of 33 kv XLPE Cable 3*300sqmm in trench with sand & brick and back filling as per Respo Norms. |
| 25 | Dragging & Laying of 11 kv XLPE Cable 3*185sqmm in trench with sand & brick and back filling as per Respo Norms. |
| 26 | Road restoration (Footpath/pakka) if required (The Road needs to be restored to its original condition & ROW by the contractor) |
| 27 | Errection/Commissioning/Fixing of 11 kv \\"V\\" Type Steel X Arm including fitting of Accessories (All Accessories shall be Provided by the Contractor). |
| 28 | Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required). |
| 29 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
| 30 | Cartage, Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
| 31 | Earthing Complete as per RESSPO Norms. |
| 32 | Realigning of Tilted Pole |
| 33 | (Decentralized Items Provided/Fixing/Erection/Installation/Laying by the Contractor as per Respo Norms). |
| 34 | F Bracket for Pcc Pole |
| 35 | GI Pipe 150mm Dia |
| 36 | Holding Clamp for X Arm |
| 37 | Holding Clamp for T/G |
| 38 | M S Holding Clamp for STP Support |
| 39 | M S Holding Clamp for PCC Support |
| 40 | Nut Bolt and washer all sizes |
| 41 | Number Plate with clamp and Nut & Bolt |
| 42 | Danger Plate with clamp and Nut & Bolt |
| 43 | 33kv E Bracket |
| 44 | Earthing of Pole by MS Earthing Rod 20*2500mm and 6 SWG earthing wire etc |
| 45 | Holding Clam for GI Pipe |
| 46 | Holding Clamp for cable |
| 47 | Lug for ACSR Dog Conductor |
| 48 | cable Route Maker |
| 49 | Stone Pad Please Enable Macros to View BoQ information |