| 1 | For Giving New Connection Along with Independent feeder at PTC, Sitapur .The following works involves. |
| 2 | Supply of Double Clamp For PCC Pole |
| 3 | Supply of Danger Board |
| 4 | Supply of Backe light with Strip For 400 KVA T/F |
| 5 | Supply of Stay Clamp |
| 6 | Supply of GI Pipe 6\\" Dia |
| 7 | Supply of Bracing Clamp with N&B For 8.5 M PCC Pole |
| 8 | Supply of suspension Clamp |
| 9 | Suppy of Barbed Wire |
| 10 | Supply of Holding For Top/Dropper |
| 11 | Supply and installation of Tailes Unit 630 And 400 KVA |
| 12 | Carriage of PCC Pole From ESC, Sitapur to Dump Site, Sitapur |
| 13 | Carriage of 400 KVA Transformer From ESC, Sitapur to Dump Site |
| 14 | Carriage of 630 KVA Transformer From ESC, Sitapur to Dump Site |
| 15 | Carriage of AB Cable 3x50+1x35+1x16 sqmm From ESC, Sitapur to Dump Sitapur |
| 16 | Carriage of LT PVC Aluminium Cable 1x240 sqmm From ESC, Sitapur to Dump Sitapur |
| 17 | Carriage of HT XLPE 11 KV Cable 3x120 sqmm From ESC, Sitapur to Dump Sitapur |
| 18 | Carriage of HT XLPE 11 KV Cable 3x185 sqmm From ESC, Sitapur to Dump Sitapur |
| 19 | Carriage of Cable Box. ST. Th. 11 KV 3x185 sqmm From ESC, Sitapur to Dump Site |
| 20 | Carriage of Cable Box. I/D/O/D11 KV 3x120/3x185 sqmm From ESC, Sitapur to Dump Site |
| 21 | Carriage of Met. Cub. Pil. Pro. 11 KV CTR 300/5 Amp. From ESC, Sitapur to Dump Site |
| 22 | Carriage of other Line Material From ESC, Sitapur to Dump Site Sitapur |
| 23 | Shifting of PCC Pole From Dump Site, Sitapur to work site |
| 24 | Shifting of 400 KVA Transformer From Dump Site, Sitapur to work site |
| 25 | Shifting of 630 KVA Transformer From Dump Site, Sitapur to work site |
| 26 | Shifting of AB Cable 3x50+1x35+1x16 sqmm From Dump Site, Sitapur to work site |
| 27 | Shifting of LT PVC Aluminium Cable 1x240 sqmm From Dump Site, Sitapur to work site |
| 28 | Shifting of HT XLPE 11 KV Cable 3x120 sqmm From Dump Site, Sitapur to work site |
| 29 | Shifting of HT XLPE 11 KV Cable 3x185 sqmm From Dump Site, Sitapur to work site |
| 30 | Shifting of Cable Box. ST. Th. 11 KV 3x185 sqmm From Dump Site, Sitapur to work site |
| 31 | Shifting of Cable Box. I/D/O/D11 KV 3x120/3x185 sqmm From Dump Site, Sitapur to work site |
| 32 | Shifting of Met. Cub. Pil. Pro. 11 KV CTR 300/5 Amp. From Dump Site, Sitapur to work site |
| 33 | Shifting of other Line Material From Dump Site, Sitapur to work site |
| 34 | Fabrication of Top, T-off, Dropper Chaneel etc. |
| 35 | Erection of Double PCC Pole with all fitting |
| 36 | Laying Stringing and sagging of AB Cable 3x50+1x35+1x16 sqmm |
| 37 | Laying LT PVC Aluminium Cable 1x240 sqmm |
| 38 | Laying of 11 KV XLPE 3x185 sqmm Cable Double Circuit by Drill Method |
| 39 | Laying of 11 KV XLPE 3x120 sqmm Cable Double Circuit by Drill Method |
| 40 | Earthing of Pole |
| 41 | Fixing of stay |
| 42 | Installation of Met. Cub. Pil. Pro. 11 KV CTR 300/5 Amp. |
| 43 | Making Cable Box I/D/O/D11 KV 3x120/3x185 sqmm |
| 44 | Making jointing/Cable Box 3x185 sqmm by ST. Th. |
| 45 | Mounting of 400/630 KVA T/F On Plinth and making connection |
| 46 | Well Type Earthing of T/F (Body Netural) |
| 47 | Construction of massonary type T/F plinth of size 2x2x1½ M with fixing of two nos. Channel on the top of the plinth.RCC slab of 4\\" thick on the top of the plinth, plastering outer surface of walls and its proper curing for erection and commissioning of 11/0.4 KV 400/630 KVA T/F. |
| 48 | Fabrication, erection, grouting, plinthing & painting of wiremesh fencing 4x3x3 M height with M.S Angle 50x50x6 and wiremesh 10 SWG. The work also includes making of retaining wall as per norms . |
| 49 | Hosting of GI Pipe |
| 50 | Grouting of PCC Pole |
| 51 | Grouting of Stay Please Enable Macros to View BoQ information |