|
| 1 | Carriage, loading-unloading with proper stacking of following material from Central Store /department store to Site distance approx 20 Km. |
| 2 | ST Pole 11 Mtr. Long |
| 3 | 11 KV Polymeric Pin INSULATOR with Nut |
| 4 | ACSR Weasel/DOG CONDUCTOR |
| 5 | 11 KV Polymeric Disc Insulator B&S Type |
| 6 | Disc Fitting |
| 7 | ABC (3x120+1x95+1x16) Sqmm. |
| 8 | 3 Phase DP Box |
| 9 | 11 KV (3X70/120/185)/(1x630) XLPE |
| 10 | LT PVC cable (1x240/400/630 sqmm)/ (3.5x240/400/630 sqmm.) |
| 11 | 11 KV cable 3x70/120/185 sq.mm J/kit O/D |
| 12 | MS Earthing Rod of 20x2500 mm. |
| 13 | Distribution Transformer 250 KVA |
| 14 | Laying of XLPE Cable (1x240/400/630)/ (3.5x240/400/630) Sqmm.Sqmm cable with Material. (Only Cable shall be supplied by department) |
| 15 | Stringing & sagging of AB Cable (3x95+1x70+1x16) /(3x120+1x95+1x16) Sqmm with proper jumpring and connections with required Clamps, jumpers, piering connector. (Cost of clamps etc. shall be borne by contractor) (Only Cable shall be supplied by department) |
| 16 | Sagging of ACSR weasel /Racoon conductor as per RESPO norms and in the directions of supervising Engineer including cradle type guarding] fixing/mounting of material clamps fitting etc, |
| 17 | Demounting of 100 KVA Distribution transformer from existing plinth after opening of all connections and opening of wire mesh fencing & safe carriage upto Central store & safe unloading. |
| 18 | Mounting of 250 KVA Transformer on plinth with making all connections & fixing all requisite items/equipments as per RESSPO,s specn and safe energizsation after connecting body & neutral of transformer to earth. only transformer shall be supplied by deptt. |
| 19 | Boring type earthing of 11/0.4 KV Substation by boring and lowering of 100 fit deep 1.5” dia B Class Jindal make GI Pipe its connection in between transformer and boring with G.I. Strip of size 50x6 mm (All the material will be arranged by the contractor) (Earthing value should be 1 ohm). |
| 20 | Fabrication, erection of wire mesh fencing 2.0 Mtr. Height, on cements boundry of height 1.0 fit. including grouting of fabrication MS Angle 50x50x6 mm. Painting of fencing and support with all material as per specification around 11/.4 KV Sub-Station. (All material shall be supplied by the contractor.) |
| 21 | Construction of Transformer plinth of size 2x2x1.5 meter with the help of first class brick and masonry in the ratio 1:4 cement & sand coare. Filling the structure completely as per norms with RCC top 1:1:2 cement, sand coarse and stone grith with MS Bar and MS channel for resting transformer wheel 2x(125x65x2000)mm and plaster. (All material shall be arranged by the contractor.) |
| 22 | Construction of massonary/Henly type distribution piller box with first class brick ballast cement coarse sand, local sand, brick ballast and MS round bar of 10 mm. Dia including fixing of 3 Nos 500 Amp/650 Volt fuse unit with Copper Busbar etc. (All material shall be supplied by the contractor.) |
| 23 | Providing and fixing of copper L Pieces with suitable nuts and bolt for100 kva transformes with proper disconnection and reconnection. |
| 24 | Fabrication erection of Substation D/P on 9/11 Mtr. ST pole Long with fixing of necessary clamps accessories required including supply and fixing of straight MS Channel 100x50 mm. (2240 mm long ) one Nos with arrangement of fixing 3 Nos. pin insulator,(ST pole/ PCC Pole supplied by the deptt). |
| 25 | Earthing of poles as per RESPO Norms with earth rod (All the material supplied by the contractor ) |
| 26 | Grouting of ST/PCC pole |
| 27 | Painting of ST/PCC pole |
| 28 | Providing and fixing of TPMO |
| 29 | Providing and fixing DO fuse set |
| 30 | `Providing and fixing Nut and bolts |
| 31 | Providing & Fixing of Suspension clamps (Insulated) with bolts & nut. |
| 32 | Providing & Fixing of dead emd clamps (Insulated) with bolts & nut. |
| 33 | Fixing of Distribution Box with proper clamps, nuts and bolts & taking connection from ABC to distribution for supply. |
| 34 | Providing and Fixing of M.S. channel/Dropper/T-off/Top channel |
| 35 | Making of bus-bar on double pole with the help of M.S. channel, M.S. T-off, pin & pin insulator |
| 36 | Providing and fixing of 11 KV Single Core Lead 16 sqmm. |
| 37 | Providing & Fixing of LT piercing connector 120/150 sqmm |
| 38 | Providing and fixing ALU LUG OFF SIZE |
| 39 | Providing & Fixing of I-Hook (Insulated) for above clamps with bolts & nut. |
| 40 | Laying of 11 KV 3x70/120/185 sq.mm XLPE cable by manual method (D/C) |
| 41 | Providing and fixing of danger board |
| 42 | Providing and fixing of stone pad |
| 43 | Gravels (Pebbles stone/Rivers peebles/Crushed granite) Interlocking tiles inside 11/0.4 Sub-Station area B/W Plinth & Fencing (1320 sqmm). |
| 44 | Laying of 11 KV 3x70/120/185 sq.mm XLPE cable by in Air. |
| 45 | Providing and fixing of cable route marker |
| 46 | Making of J/Kit |
| 47 | Providing and fixing of under ground warning tape |
| 48 | Providing & Fixing of LT piercing connector 120/150 sqmm |
| 49 | Carriage, loading-unloading with proper stacking of 100 KVA T/F from Site to store. |
| 50 | If, due to any circumstances, the plinth construction work is not feasible, then the 250 KVA transformer shall be installed on a double pole arrangement as per requirement. The cost of this work shall also be equivalent to the cost of plinth construction. Please Enable Macros to View BoQ information |