| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 |
| 2 | Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. |
| 3 | Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements |
| 4 | Excavation in Foundation in ordinary soil (Loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling, sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I up to a distance of 30m. from the foundation trenches including all T&P etc. complete Rate as per S.I.No. 251 (Schedule Rate) |
| 5 | Construction of granular sub-base (GSB) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavater at OMC, and compacting with smooth wheeled roller to achieve the desired density as per clause 401(GSB Grade I) |
| 6 | Providing, laying, spreading and compacting stone aggregates of specific sizes (63-45 mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. (WBM II) |
| 7 | Providing, laying, spreading and compacting stone aggregates of specific sizes (53-22.4 mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. (WBM III) |
| 8 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 9 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.275 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 10 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm (passing 100% on 22.4 mm sieve and fully retained on 11.2 mm seive ) and 11.2 mm (passing 100% on 13.2 mm sieve and fully retained on 5.6 mm seive) granite stone grits in the ratio 2:1 using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508. (using Bitumen 80/100 grade) By Mechanical Means |
| 11 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Case III - Type C as per Technical Specification Clause 510 (using 80/100) |
| 12 | Brick on Edges on both side of the road of 1st class brick 8 Cm.(3\\") Wide and 12 Cm(4.5\\") deep laid with Local Sand all labour finished to the required template and in proper alingnment including all labour, T&P sudries required fro proper completion of work with material as per S.I. No. 765 |
| 13 | Cement Concrete Pavement thickness as per design over a prepared sub base with 43 gauge cement or any other type as per Clause coarse and fine aggregates confirming to IS:383 maximum size of coarse aggregate not exceeding 25 mm mixed in a concrete mixure of not less than 0.20 cum capacity and approved appropriate weigh batcher using approved mixed design laid in approved fixed side formwork curring of concrete slabs for 14 days curring compounded (where specified) and water finising to lines and grade as per drawing and technical specification clause 1501 |
| 14 | Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 |
| 15 | Reinforced cement concrete M15 grade 200 metre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 |
| 16 | S/F Inaugration black granite (Polished)20mm thick stone size 0.90x0.60 m including lettering, printing, border ect. Will be painted of superior quality is required shade and colour including excavation of foundation (1.50x0.50x0.90m),P.C.C. 1:4:8(1.50x0.50x0.12m), brick work 1:4 with cement fine sand in foundation (1.36x0.345x1.20m) ,12mm thick plaster 1:4 with cement fine sand and finishing walls with water profing white cement paint of approved make and quality such as super snowcem paint etc. all complete. |
| 17 | DRAIN Excavation in Foundation in ordinary soil (Loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling, sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I up to a distance of 30m. from the foundation trenches including all T&P etc. complete Rate as per S.I.No. 251 (Schedule Rate) (For Drain) |
| 18 | Cement Concrete with 40 mm Gauge approved stone Ballast, approved coarse sand and cement in proportion 6:3:1 in including supply of all materils labour and tools plants etc. required for proper complition for the work.. As per SI NO. 280 |
| 19 | Providing and laying reinforced cement concrete in superstructure as per drawings and technical specifications Clauses 800,1205.4 and 1205.5 (R.C.C M 25 grade) |
| 20 | Mild steel or iron in plain work such as in reinforced concrete work to required shape as necessary including dending for proper completion of the work and including supply of steel its wastage. Bend books and authorized overlapping shall be measured. SI No. 504 |
| 21 | Hume Pipe Gule (3 Nos. x 450mm dia) Excavation in Foundation in ordinary soil (Loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling, sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I up to a distance of 30m. from the foundation trenches including all T&P etc. complete Rate as per S.I.No. 251 (Schedule Rate) (For Hume pipe Gule) |
| 22 | Cement Concrete with 40 mm Gauge approved stone Ballast, approved coarse sand and cement in proportion 6:3:1 in including supply of all materils labour and tools plants etc. required for proper complition for the work.. As per SI NO. 280 |
| 23 | Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand. (PWD-255) |
| 24 | Class M 150 sub class ''A'' Brick in 1:3 with cement and coarse sand in foundation upto bed level required for proper completion of work. As per SI. NO. 307 |
| 25 | Laying Cement Concrete Pipe NP3 (Burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation. Protection works, backfilling. Concrete and masonary work in head well and parapets ( 450 mm Dia) |
| 26 | Struck Pointing With Cement and fine sand mortar consisting one part of cement and two part of Fine Sand including supply of all materials labour T&P required for proper completion of the work As Per SI No. 574 Please Enable Macros to View BoQ information |