|
| 1 | Installation New 11/0.4 KV Distribution Transformer The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) |
| 2 | 25 KVA Distribution Transformer |
| 3 | 63 KVA Distribution Transformer |
| 4 | 100 KVA Distribution Transformer |
| 5 | PCC Pole 8.5 Meter |
| 6 | PCC Pole 11 Meter |
| 7 | LT PVC CABLE 1x70 Sqmm |
| 8 | LT PVC CABLE 1x120 Sqmm |
| 9 | ACSR WEASEL Conductor |
| 10 | ACSR RABBIT Conductor |
| 11 | AB CABLE 3x50+1x35+1x16 Sqmm |
| 12 | AB CABLE 3x95+1x70+1x16 Sqmm |
| 13 | 11 KV FUSE SET |
| 14 | 3Ph LT DISTRIBUTION BOX |
| 15 | 11 KV OUTDOOR CABLE JOINTING KIT 3x70 Sqmm |
| 16 | 11 KV INDOOR CABLE JOINTING KIT 3x70 Sqmm |
| 17 | LINE MATERIAL (Insulator, Disc, Earthing, Stay set ETC.) |
| 18 | Complete work of installing the electrical material received from the store center at the site. |
| 19 | Complete work of Laying/Installing ACSR WEASEL CONDUCTOR on the Established electric poles installed as per RESPO norms. |
| 20 | Complete work of Laying/Installing ACSR RABBIT CONDUCTOR on the Established electric poles installed as per RESPO norms. |
| 21 | Complete work of LT ABC 3x50+1x35+1x16 Sqmm on the Established electric poles installed as per RESPO norms. |
| 22 | Complete work of LT ABC 3x95+1x70+1x16 Sqmm on the Established electric poles installed as per RESPO norms. |
| 23 | Work of Fixing/Installing Single Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
| 24 | Work of Fixing/Installing Double Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
| 25 | Complete work of Installing and Commissioning 25 KVA Distribution Transformer on Established Double pole as per RESPO standards. |
| 26 | Complete work of Installing and Commissioning 63 KVA Distribution Transformer on Established Double pole as per RESPO standards. |
| 27 | Complete work of Installing and Commissioning 100 KVA Distribution Transformer on Established Double pole as per RESPO standards. |
| 28 | Complete work of Installing and Commissioning 3P LT DISTRIBUTION BOX as per RESPO standards. |
| 29 | Complete work of Installing and Commissioning 11 KV Fuse Set as per RESPO standards. |
| 30 | Complete work of Installing and Commissioning LT FUSE SET PROTECTION UNIT with SMC BOX on established 25 KVA, 63 KVA & 100 KVA Distribution Transformer. as per RESPO standards. necessary Decentralized material will be provide by the Contractor/Firm. |
| 31 | Complete work of installation of Stay Set Complete with CONCRETING on Established Double pole As per the RESPO standards. |
| 32 | Complete work of Pole concreting on Established Double Pole / Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm. |
| 33 | Complete work of Earthing completing with earthing road of Established Pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 34 | Complete work of Chemical Earthing of established Distribution Transformer as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 35 | Complete work of Installing and Commissioning of 11 KV OUTDOOR CABLE JOINTING KIT 3x70 Sqmm, as per RESPO standards. |
| 36 | Complete work of Installing and Commissioning of 11 KV INDOOR CABLE JOINTING KIT 3x70 Sqmm, as per RESPO standards. |
| 37 | Complete work of Tying/Binding Danger Board on establishing Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 38 | Supply of M.S. CHANNEL as per RESPO standards |
| 39 | Supply of M.S. ANGLE as per RESPO standards |
| 40 | Supply of CLAMP with NUT & BOLT as per RESPO standards |
| 41 | Supply of L.T. FUSE SET PROTECTION UNIT with SMC BOX for 25 KVA as per RESPO standards |
| 42 | Supply of L.T. FUSE SET PROTECTION UNIT with SMC BOX for 63 KVA as per RESPO standards |
| 43 | Supply of L.T. FUSE SET PROTECTION UNIT with SMC BOX for 100 KVA as per RESPO standards |
| 44 | Supply of ALUMINIUM CRIMPING LUGS as per RESPO standards |
| 45 | Supply of CLAMP for 3 PH. Distribution Box as per RESPO standards |
| 46 | Supply of DEAD & CLAMP as per RESPO standards |
| 47 | Supply of SUSPENSION CLAMP as per RESPO standards |
| 48 | Supply of J-HOOK as per RESPO standards |
| 49 | Supply of NUT & BOLT as per RESPO standards |
| 50 | Supply of COPPER L PIECE 50x225x10 MM |
| 51 | Supply of I-HOOK as per RESPO standards |
| 52 | Supply of STONE PAD as per RESPO standards |
| 53 | Supply of DANGER BOARD with Nut & Bolts as per RESPO standards |
| 54 | Supply of GI PIPE 6\\"DIA as per RESPO standards |
| 55 | Supply of X-Arm Holding Clamp as per RESPO standards |
| 56 | Supply of F-Bracket as per RESPO standards |
| 57 | SUNDRIES ITEMS |
| 58 | Strengthening Work of 11 KV LineThe work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) |
| 59 | PCC Pole 8.5 Meter |
| 60 | PCC Pole 11 Meter |
| 61 | ACSR Weasel Conductor |
| 62 | ACSR Rabbit Conductor |
| 63 | 11 KV XLPE CABLE 3x120 Sqmm |
| 64 | 11 KV XLPE CABLE 3x185 Sqmm |
| 65 | 11 KV OUTDOOR CABLE JOINTING KIT 3x120 Sqmm |
| 66 | 11 KV OUTDOOR CABLE JOINTING KIT 3x185 Sqmm |
| 67 | 11 KV INDOOR CABLE JOINTING KIT 3x185 Sqmm |
| 68 | STRAIGHT THROUGH |
| 69 | 90 LBS RAIL PIECES for Power Transformer |
| 70 | LINE MATERIAL (Insulator, Disc, Earthing, Stay set ETC.) |
| 71 | As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. |
| 72 | Complete work of Laying/Installing ACSR WEASEL CONDUCTOR on the Established electric poles installed as per RESPO norms. Including opening / dismantling of old / damaged conductor of the line |
| 73 | Complete work of Laying/Installing ACSR RABBIT CONDUCTOR on the Established electric poles installed as per RESPO norms. Including opening / dismantling of old / damaged conductor of the line |
| 74 | Complete work of UNDERGROUND Laying / Installing 11 KV XLPE CABLE 3x120 Sqmm on the site as per RESPO norms. In which decentralized material Like Brick, Sand, Cement & ETC. will be provide by the Contractor/Firm. |
| 75 | Complete work of UNDERGROUND Laying / Installing 11 KV XLPE CABLE 3x185 Sqmm on the site as per RESPO norms. In which decentralized material Like Brick, Sand, Cement & ETC. will be provide by the Contractor/Firm. |
| 76 | Complete work of Laying / Installing 11 KV XLPE CABLE 3x185 Sqmm on the Established electric poles installed as per RESPO norms. |
| 77 | Work of Fixing/Installing Single Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
| 78 | Work of Fixing/Installing Double Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
| 79 | Complete work of installation of Stay Set Complete with CONCRETING on Established Double pole As per the RESPO standards. |
| 80 | Complete work of Installing and Commissioning of 11 KV OUTDOOR CABLE JOINTING KIT 3x120 Sqmm as per RESPO standards. |
| 81 | Complete work of Installing and Commissioning of 11 KV OUTDOOR CABLE JOINTING KIT 3x185 Sqmm as per RESPO standards. |
| 82 | Complete work of Installing and Commissioning of 11 KV INDOOR CABLE JOINTING KIT 3x185 Sqmm as per RESPO standards. |
| 83 | Complete work of Installing and Commissioning of STRAIGHT THROUGH as per RESPO standards. |
| 84 | Complete work of Earthing completing with earthing road of Established Pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 85 | Complete work of Pole concreting on Established Double Pole / Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm. |
| 86 | Complete work of Tying/Binding Danger Board on establishing Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 87 | Complete work of Tying/Binding Cable ROUTE MARKER on establishing Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 88 | Complete work of Pole Guarding by installing G.I.Wire and MS Angle on Established Pole as per RESPO standards. In which necessary decentralized material will be provide by the Contractor/Firm. |
| 89 | Complete work of cutting and Chopping the branches of tree standing between the lines established on the site. |
| 90 | Safely Removing the 05 MVA Power Transformer from the old plinth with the help of a crane and after completion work of the New Plinth, Reinstalling the Power Transformer as before. In which necessary decentralized material will be provide by the Contractor/Firm. |
| 91 | Complete work of making a new plinth (with RAIL PIECES install) in place of the damaged plinth for the safety of 05 MVA Power Transformer installed at 33/11 KV Sub-station Sanjhak (Barwala) as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm. |
| 92 | Complete work of making a New Fire Wall (Height 5 mtr. + Lenth 5 mtr.) for the safety of Power Transformer installed at 33/11 KV Sub-station Sanjhak (Barwala) as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm. |
| 93 | Bus-Bar Structure & Connection Related work During Removal & Reinstallation Process of Power Transformer installed at 33/11 KV Sub-station Sanjhak (Barwala) as per RESPO standards. In which necessary decentralized material will be provide by the Contractor/Firm. |
| 94 | Complete work of Power Transformer Painting of 05 MVA Power Transformer installed at 33/11 KV Sub-station Sanjhak (Barwala) as per RESPO standards. (Alluminium Paint 40 Ltr., Red Oxide Paint 10 Ltr. & Steel Paint 10 Ltr.) In which necessary decentralized material will be provide by the Contractor/Firm. |
| 95 | Supply of ALUMINIUM JOINTING SLEEVES as per RESPO standards |
| 96 | Supply of ALUMINIUM BINDING WIRE 6 SWG as per RESPO standards |
| 97 | Supply of NUT & BOLT as per RESPO standards |
| 98 | Supply of F-BRACKET as per RESPO standards |
| 99 | Supply of X-ARM HOLDING CLAMP with NUT & BOLTS as per RESPO standards |
| 100 | Supply of STONE PAD as per RESPO standards |
| 101 | Supply of CLAMP with NUT & BOLTS as per RESPO standards |
| 102 | Supply of DANGER PLATE with CLAMP NUT & BOLTS as per RESPO standards |
| 103 | Supply of M.S. CHANNEL as per RESPO standards |
| 104 | Supply of M.S. ANGLE as per RESPO standards |
| 105 | Supply of Guarding Wire 10 SWG as per RESPO standards |
| 106 | Supply of GI PIPE 6\\"DIA as per RESPO standards |
| 107 | Supply of CABLE ROUTE MARKER as per RESPO standards |
| 108 | Supply of Alluminium Paint as per RESPO standards |
| 109 | Supply of Red Oxide Paint as per RESPO standards |
| 110 | Supply of Steel Paint as per RESPO standards |
| 111 | SUNDRIES ITEMS |
| 112 | As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. |
| 113 | ST POLE (OLD & USED / SCRAP) |
| 114 | SCRAP (OLD & USED / SCRAP) or Weasel |
| 115 | WEASEL CONDUCTOR (OLD & USED / SCRAP) |
| 116 | CROSS ARM (OLD & USED / SCRAP) |
| 117 | XLPE CABLE (OLD & USED / SCRAP) Please Enable Macros to View BoQ information |