| 1 | Control Cable carriage |
| 2 | Shifting of 2 no. cable drum of 6C unarmoured control cable (500m each)placed in Store to Loading point and safely loading of with the help of labour/crane alongwith other associated work with all cost of men,material and T&P required. |
| 3 | Safe carriage Of above cable on suitable capacity/size vehicle arrange by contractor from 220kv hardoi road TO ETD -II Lucknow (dist approx 32km) |
| 4 | Unloading and safely Placing 2 no. cable drum of 6C unarmoured control cable (500m each) with the help of labour/crane alongwith other associated work with all cost of men,material and T&P required. |
| 5 | Shifting of 1 no. cable drum of 6C unarmoured control cable (1km ) and 550m,50*6mm MS flat placed in Store to Loading point and safely loading of with the help of labour/crane alongwith other associated work with all cost of men,material and T&P required. |
| 6 | Safe carriage Of above cable and MS flat on suitable capacity/size vehicle arrange by contractor from 220kv Satrikh road TO 220kv chinhat ETD -II Lucknow (dist approx 25km) |
| 7 | Unloading and safely Placing 1 no. cable drum of 6C unarmoured control cable (1Km ) and MS flat with the help of labour/crane alongwith other associated work with all cost of men,material and T&P required. |
| 8 | Shifting of 70m,75*10mm MS flat placed in Store to Loading point and safely loading of with the help of labour/crane alongwith other associated work with all cost of men,material and T&P required. |
| 9 | Safe carriage Of above cable and MS flat on suitable capacity/size vehicle arrange by contractor from 132kv awas vikas TO 220kv chinhat ETD -II Lucknow (dist approx 30km) |
| 10 | Unloading and safely Placing MS flat with the help of labour/crane alongwith other associated work with all cost of men,material and T&P required. |
| 11 | providing & fixing of glow sign board of size 8ft X 6ft for sub station Name & address to be fixed on the top of control room building of sub station. The glow Sign Board shall be illuminated using LED Tube light in sufficient quantity. The board shall be made of Acrylic Sheet and shall be provided with back support frame & fixing arrangement. The glow sign board should be fixed on frame with 50 X 50 X 6 mm MS angle and fixed on the roof with the help of Brick and CC of stone concrete Cement and coarse sand for holding the frame and board firmly on the roof at the desired location with all cost of men, material misc consumables, T& P etc as per direction of supervising engineer.(220kv substation gomti nagar) |
| 12 | Dismantling and removing of 2C,4C,6C old ,damaged and defective control cables from different cable rack in treches. The work includes opening of cable binding,collecting making pikles and shifting to site storage place alongwith opening of trench cover and recovering after completion of work satisfactorily.(AT 220 KV SUBSTATION CHINHAT) |
| 13 | Dismantling and removing of 2C,4C,6C old ,damaged and defective control cables from different cable rack in treches. The work includes opening of cable binding,collecting making pikles and shifting to site storage place alongwith opening of trench cover and recovering after completion of work satisfactorily.(AT 220 KV SUBSTATION GOMTI NAGAR) |
| 14 | Dismantling and removing of 2C,4C,6C old ,damaged and defective control cables from different cable rack in treches. The work includes opening of cable binding,collecting making pikles and shifting to site storage place alongwith opening of trench cover and recovering after completion of work satisfactorily.(AT 132 KV SUBSTATION NKN) |
| 15 | ALP carriage |
| 16 | Shifting of 7 no. ALP structure placed in Store to Loading point and safely loading of with the help of labour/crane alongwith other associated work with all cost of men,material and T&P required. |
| 17 | Safe carriage Of above ALP structure on suitable capacity/size vehicle arrange by contractor from 132 KV S/S Khurram nagar TO 220 KV S/S Chinhat under ETD -II Lucknow (Approx15 KM) |
| 18 | Unloading and safely Placing of above ALP structures with the help of labour/crane alongwith other associated work with all cost of men,material and T&P required. |
| 19 | Shifting of 6 no. ALP structure placed in Store to Loading point and safely loading of with the help of labour/crane alongwith other associated work with all cost of men,material and T&P required. |
| 20 | Safe carriage Of above ALP structure on suitable capacity/size vehicle arrange by contractor from 220 KV S/S gomti nagar TO 220 KV S/S Chinhat under ETD -II Lucknow (Approx12 KM) |
| 21 | Unloading and safely Placing of above ALP structures with the help of labour/crane alongwith other associated work with all cost of men,material and T&P required. |
| 22 | RAISING OF HEIGHT OF ALL JUMPERS BETWWEN TRANSFORMER hv and lv side bushings and PI structure by adding upper angle joints duly fabricated using scrap angles to ALP structure available at substation store area |
| 23 | RELAY RETROFITTING |
| 24 | Opening of all connections of backup relay at 220kv substation gomti nagar and carriage it at 220kv substation chinhat and making cut of proper size for relay and retrofitting and configuration it in existing control and relay panel of transformers(63MVA 1st and 2nd) at 220kv substation chinhat. |
| 25 | CIRCUIT BREAKER |
| 26 | Work of maintenance and major overhauling of each pole mechanism assembly of 145 kv circuit breaker 40MVA TF .Rectification of gas leakage from gas pipeline and poles of breaker by replacing O ring and brazing etc.Work also includes tightening of all electrical connections for satisfactoryily operation of breaker Please Enable Macros to View BoQ information |