| 1 | Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead |
| 2 | Scraping of old paint including cost of all tools and plants as per the direction of EIC |
| 3 | Painting wall with Mural paint including cost of all materials, tools and plants as per the direction of EIC |
| 4 | Painting wall with Distempering over a coat of primer including cost of all materials, tools and plants as per the direction of EIC |
| 5 | Painting with Enamel paint over a coat of primer including cost of all materials, tools and plants as per the direction of EIC |
| 6 | Supplying, fitting and Fixing of Short Body bib cock complete as per drawing and technical specification. |
| 7 | Supplying, fitting and Fixing of Short Body angle stop cock complete as per drawing and technical specification. |
| 8 | pvc door |
| 9 | Dismantling and removing 2.5 cm thick grading concrete from roof slab cleaning the surface lowering and removing the debris within 50m lead. |
| 10 | 2.5cm. thick grading concrete (1:2:2)on roof slab with 6mm. Size on new work crusher broken hard Granite chips including cost of all labour, materials with all taxes, lead, T & P etc all complete. |
| 11 | Flat back standing Urinal (Medium) |
| 12 | 50mmx800mm long PVC urinal waste pipe |
| 13 | 40 mm dia waste Coupling (F/T) |
| 14 | 20\\" I.W.C.(Orissa Pan) |
| 15 | 10 litr pvc low level cistern with fittings |
| 16 | 15mmx450mm PVC connection pipe |
| 17 | UPVC-ASTM Standard (Sch-80) LAYING WITH COST OF PIPE Astral/AJAY /Supreeme (Local Market Rate)20mm |
| 18 | UPVC-ASTM Standard (Sch-80) LAYING WITH COST OF PIPE Astral/AJAY /Supreeme (Local Market Rate)25mm |
| 19 | 40mmx800mm long PVC corrugated waste pipe |
| 20 | Providing & laying cement concrete of prop. (1:2:4) in road work using 12mm size crusher broken hard granite chips of approved quality & from approved quarry including laying in the layers not exceeding 150mm thick hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&p etc. as required for the work complete and as per direction of Engineer in charge. |
| 21 | Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50m lead |
| 22 | Antiskid Floor Tile - (Size-300mmX300mm) |
| 23 | Supplying,fitting & fixing of ms grills,grill gates,in all floors made out of M.S square bar/flat as per approved drawing &design including making holes in walls and rcc structure etc.30 kg/sqm |
| 24 | providing of Transparency board/Disply board Please Enable Macros to View BoQ information |