| 1 | Bed Hard (FD/E6/MAP/08(R):- Taking out of unsv ply wood including Nut and Bolt with Washer complete and S&F new ply wood 12 mm thick BWR (Make : Green Ply/ Archid Ply/ Kitply complete as per existing shape ,size and as per Drg and as directed by Engr-in-charge. |
| 2 | Taking out unsv Head Board and S&F New Head Board of Prelaminated Particle Board/MDF Board Exterior Grade 18mm both side Teak Face Make Action Tesa/Arched/Novapan as per existing shape ,size and as per Drg and as directed by Engr-in-charge. |
| 3 | Taking out unsv foot Board and S&F new foot Board of Prelaminated Particle Board/MDF Board Exterior Grade 18mm both side Teak Face Make Action Tesa/Arched/Novapan as per existing shape ,size and as per Drg and as directed by Engr-in-charge. |
| 4 | Spray Painting with synthetic enamel paint of Bed Hard Steel complete outside and rapairing /welding broken pipe duly welded and as directed by Engr-in-charge. |
| 5 | S & F of new rubber shoes as per drg. |
| 6 | Bed Hard (FD/MAP-II/01:- Taking out of unsv ply wood including Nut and Bolt with Washer complete and S & F new ply wood 12 mm thick BWR (Make : Green Ply/ Archid Ply/ Kitply complete as per existing shape ,size and as per Drg and as directed by Engr-in-charge. |
| 7 | Spray Painting with synthetic enamel paint of Charpoy hard top complete outside and repairing /welding broken pipe duly welded and as directed by Engr-in-charge. |
| 8 | S & F of new rubber shoes as per drg and as directed by Engr-in-charge. |
| 9 | Locker Bed Side Steel (FD-1029/257):- Taking out of unsv Handle and S&F New Handle including Steel screw complete as per existing shape ,size and as per Drg and as directed by Engr-in-charge. |
| 10 | Taking out of unsv Butt Hinges and S&F New Butt Hinges complete as per existing shape ,size and as per Drg and as directed by Engr-in-charge. |
| 11 | Taking out of unsv Hasp and Staple and S&F New hasp and staples complete as per existing shape ,size and as per Drg and as directed by Engr-in-charge. |
| 12 | Taking out of unsv Hanging Rod of conduit Pipe and S&F New Hanging Rod with bracket complete as per existing shape,size and as per Drg and as directed by Engr-in-charge. |
| 13 | Adjustment of existing shelves by providing New clamps/clips after removing the old unsv clamps/clips as per existing shape,size and as per drg and as directed by Engr-in-charge. |
| 14 | After prepartion of surface rubbing denting and spray painting with synthetic enamel paint of locker steel inside and outside as per drg and directed by Engr-in-charge. |
| 15 | Almirah large steel/Med with shelves (FD-67/351/1031/1032):-Taking out of unsv Handle and S&F New Handle including Nut and Bolt with Washer complete as per existing shape ,size and as per Drg and directed by Engr-in-charge. |
| 16 | Taking out of unsv Lock and S&F New Lock with Duplicate Key complete as per existing shape ,size and as per Drg and as directed by Engr-in-charge. Make (Godraj/Link/Harrison) |
| 17 | Adjustment of existing shelves by providing New clamps/clips after removing the old unsv clamps/clips as per existing shape,size and as per drg and directed by Engr-in-charge. |
| 18 | Spray Painting after preparation of surface denting and penting of almirah large steel with shelves complete inside and outside as per directed by Engr-in-charge. |
| 19 | spray Painting after preparation of surface denting and penting of almirah Small steel with shelves complete inside and outside as per directed by Engr-in-charge. |
| 20 | Adjustment of existing door as per existing sample and as directed by Engr-in-charge. |
| 21 | Charpoy GI Pipe with ply top (FD-220):- Replacement of Commercial Ply top in single piece of size 6'6\\"x3'x12 mm thick of existing charpoy GI pipe top and as directed by Engr-in-charge. make Kitply/GreenPly/National |
| 22 | Removing the existing U/S Broken Long Rails of Charpoy GI Pipe and Supply and fixing new Long Rails made out of GI tubing 32 mm dia (Medium Grade) all as specified and shown on drg Make Jindal/Surya/Tata |
| 23 | Making out short Rail from broken long rail obtained from Ser item No 22 above fixing to the Charpoy GI Pipe complete all as specified and shown on drg including removing existing broken u/s short rails and as directed by Engr-in-charge. |
| 24 | Making out legs from broken short Rail obtained from ser No 22 above and fixing to the charpoy GI pipe complete all as specified and shown on drg including removing existing broken u/s legs and as directed by Engr-in-charge. |
| 25 | Removing the existing u/s broken elbows of charpoy GI Pipe and supplying and fixing new 32 mm bore 3 way elbows ISI marked all as specified and shown on drg and as directed by Engr-in-charge. |
| 26 | Supply and fixing 05 mm thick GI Check nuts suitable for 32 mm dia pipe all as specified and shown on drg and as directed by Engr-in-charge. |
| 27 | Dismentaling and reassembling frame of charpoy GI pipe including tightening and providing extra threads and welding the joints as required and directed by Eng-in-charge and also assembling the frame of charpoy GI pipe with the parts received from items ser No. 22 to 26 all as shown on Drg |
| 28 | Chair Verandah ( FD-256):-M & L of Welding 'U' shape legs with arms of conduit pipes 20mm dia 16 gauge thick all as specified & shown on drg and as directed by Engr-in-charge. |
| 29 | Welding broken joints of 20mm dia 16 gauge thick conduit pipe of chair verandah and as directed by Engr-in-charge. |
| 30 | S&F hard rubber toes to legs as per sample and as directed by Engr-in-charge. |
| 31 | Preparation of old painted surfaces for painting to chair and apply two coats of white synthetic enamel paint to framed chair verandah complete all as specified |
| 32 | Recanning of verandah chair with plastic cane (Oval Shape) 04 mm wide complete as per Godrej pattern using make: Shah/Premier brand cane (Removing of old broken cane shall be done at BSO Yard and as directed by Engr-in-charge. |
| 33 | Charpoy GI Pipe nylon newar (FD-220) :- Removing of old Nylon Newar from GI Charpoy tightening of complete charpoy GI Pipe and its parts such as loose check nut, elbow, long rails, short rail and legs etc, complete, all as directed and specified. |
| 34 | Removing of old unserviceable Elbow from charpoy GI Pipe and Supply and fixing new elbow GI 32 mm (ISImarked) medium grade, complete, all as specified and directed. |
| 35 | Removing of old unserviceable check nut from charpoy GI pipe and S&F new check nut 32mm, medium grade of best quality, complete, all as specified and directed. |
| 36 | Removing the existing u/s broken long rails of charpoy GI Pipe and supplying and fixing new long rails made out of GI tubing 32mm dia (medium grade. ISI marked) all as specified and shown on drg and as directed by Engr-in-charge. |
| 37 | Making out short rails obtained from broken long rails from Ser Item No 33 above and both side threading and fixing to the charpoy GI Pipe complete all as specified and shown on drg including removing existing broken /u/s short rails and as directed by Engr-in-charge. |
| 38 | Making out legs for charpoy GI pipe obtained from broken GI pipe from Ser item Nos 33 duly threaded 22 mm long at one end including removal of old and broken unserviceable legs and as directed by Engr-in-charge. |
| 39 | Supply and fixing 25 mm sq pipe iron stiffner by welding across the long rail at equal spacing. Square pipe shall be painted with two coats of synthetic enamel black paint over a coat of red oxide primer and as directed by Engr-in-charge. |
| 40 | Supply and fixing 12mm thick plywood top of size 6.6'x3'x12mm commercial BWR grade ISI marked, fixed with 10 Nos nut and bolts and washer after driling to charpoy GI pipe complete all as specified and directed and as directed by Engr-in-charge. .Make of plywood: Greenply, Century, Archid ply, Kitply Duro. |
| 41 | Supply and fixing with proper welding work mild steel strip of size 40MM x 3MM thick & 250mm long at the all four corner joints of pipe as per sample approved by GE. complete all as specified and directed and as directed by Engr-in-charge. |
| 42 | Supplying and taping new nylon newar Best quality white/light coloured of Make as approved by GE and reweaving charpoys GI pipe all as specified and shown on drg including removing existing the old newar(weight of nylon Newar shall not be less than 1.5 kg per charpoy) as required and directed by Engr-in-charge. Note: Before taping it will be ensured that the charpoy frame is tightened properly. Unit rate quoted against this item includes this element. Please Enable Macros to View BoQ information |