| 1 | Refilling of gear oil in gearbox after removal of damaged oil; greasing of drive shaft coupling, housings, pinions, and wire rope wheel pins after cleaning and washing of all spares; and application of Cardium Compound over wire rope assembly of Undersluice Gates of Birupa Barrage after cleaning the steel wire rope using degreaser/diesel/turpentine oil, wire brush, etc., including cost of materials, labour, T&P, cess, but excluding GST, complete as per direction of the Engineer-in-Charge |
| 2 | Refilling of gear oil in gearbox after removal of damaged oil; greasing of drive shaft coupling, housings, pinions, and wire rope wheel pins after cleaning and washing of all spares; and application of Cardium Compound over wire rope assembly of Spillway Gates of Birupa Barrage after cleaning the steel wire rope using degreaser/diesel/turpentine oil, wire brush, etc., including cost of materials, labour, T&P, cess, but excluding GST, complete as per direction of the Engineer-in-Charge |
| 3 | Refilling of gear oil in gearbox after removal of damaged oil; greasing of drive shaft coupling, housings, pinions, and wire rope wheel pins after cleaning and washing of all spares; and application of Cardium Compound over wire rope assembly of Head Regulator Gates of Birupa Barrage after cleaning the steel wire rope using degreaser/diesel/turpentine oil, wire brush, etc., including cost of materials, labour, T&P, cess, but excluding GST, complete as per direction of the Engineer-in-Charge |
| 4 | Refilling of gear oil in gearbox after removal of damaged oil; greasing of drive shaft coupling, housings, pinions, and wire rope wheel pins after cleaning and washing of all spares; and application of Cardium Compound over wire rope assembly of the above spares of 1 no Gantry Crane of Birupa Barrage after cleaning the steel wire rope using degreaser/diesel/turpentine oil, wire brush, etc., including cost of materials, labour, T&P, cess, but excluding GST, complete as per direction of the Engineer-in-Charge |
| 5 | Refilling of gear oil in gearbox after removal of damaged oil; greasing of drive shaft coupling, housings, pinions, and wire rope wheel pins after cleaning and washing of all spares; and application of Cardium Compound over wire rope assembly of the above spares of 1 no Monorail Crane of High level Canal after cleaning the steel wire rope using degreaser/ diesel/ turpentine oil, wire brush, etc., including cost of materials, labour, T&P, cess, but excluding GST, complete as per direction of the Engineer-in-Charge |
| 6 | Dismantling damaged plates, angles of the existing Watchman shade of Birupa Barrage by way of gas cutting mahine , supplying & cutting steel materials to required size, fabrication & erection,then grinding, polishing and painting of the same by the help of jhula, safety belt,helmet, ladders. including cost of materials, loading, unloading, consumable, T&P & cess etc complete but excluding GST as per direction of the Engineer-in-Charge. |
| 7 | Supply, delivery of 4 core 25 Sqmm. Cu. Copper tralling cable.(100m) including cost of materials, labour, T&P, cess, but excluding GST, complete as per direction of the Engineer-in-Charge |
| 8 | Supplying and fixing of 10mm Dia MS tested Galvanised Chain to rope drum and central drive unit covers of Mahanadi Barrage gates including cost of materials,conveyance,T&P, scaffolding, labour etc complete but excluding GST as per direction of the Engineer-in-Charge. Please Enable Macros to View BoQ information |