| 1 | Work-01 Increasing capacity (1x5 MVA TO 2x5 MVA) of 33/11 K.V. Sub–Station PaliPART - A- MATERIAL PROVIDED BY CONTRACTOR |
| 2 | 11 KV cable jointing kit 3×300 mm outdoor |
| 3 | 11 KV cable jointing kit 3×300mm indoor |
| 4 | 11 KV cable jointing kit 3×185 mm outdoor |
| 5 | 11 KV cable jointing kit 3×185 mm Indoor |
| 6 | Top Channel 100x50x6 mm, 2400 mm long |
| 7 | Holding Clamp for Top, Dropper, Pipe & Cable |
| 8 | Complete Stay Set |
| 9 | Number Plate with clamp and Nut & Bolt |
| 10 | Danger Plate with clamp and Nut & Bolt |
| 11 | MS Dropper Angle |
| 12 | M S Earthing Rod 20 x 2500 mm |
| 13 | Barbered Wire |
| 14 | Armoured Copper Control Cable 2×2.5 mm2 |
| 15 | Armoured Copper Control Cable 4×2.5 mm2 |
| 16 | 24 volt battery and battery charger with cabinet |
| 17 | GI pipe 6\\" dia over the 3x300/185 sqmm XLPE cable |
| 18 | M.S. Nut & Bolt Various size with washer |
| 19 | Structure For cable support |
| 20 | \\"L\\" Type Structure for Neutral |
| 21 | P.G Clamp For Dog |
| 22 | Rubber Mat |
| 23 | PART - B WORKShifting & loading of following materials on private truck at store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Pali , Distt-Gorakhpur & Unloading of the same with proper stacking (Distance about 0 to 40 km) |
| 24 | PCC Pole 8.5 Mtr Long |
| 25 | 33KV Double T/F Control Panel |
| 26 | 33 KV VCB 800A, 750 MVA with Steel Structure |
| 27 | 33 KV C.T 200/100/1A |
| 28 | Structure of 33 KV CT |
| 29 | 33 KV LA |
| 30 | Structure of 33 KV LA |
| 31 | 33 KV Fuse Set |
| 32 | Structure of 33KV Fuse set |
| 33 | 33 KV Bus Isolator |
| 34 | Structure of 33 KV Bus Isolator |
| 35 | 33 KV Post Insulator |
| 36 | Structure of 33 KV Post Insulator |
| 37 | 90 Ib,Rail pieces (44.64 Kg/M) |
| 38 | ACSR Dog Conductor |
| 39 | 11 KV XLPE Cable 3×300 mm2, |
| 40 | 11 KV XLPE Cable 3×185 mm2 |
| 41 | 11 KV VCB 600/300/5A , 350 MVA I/C |
| 42 | 11 KV VCB (Out going) 200/100/5A 350 MVA |
| 43 | 11 KV Bus Coupler |
| 44 | Fresh T/F Oil |
| 45 | Laying of Earthmat for Outdoor equipments with providing of materials(for proposed 05 MVA TF) |
| 46 | Construction of power transformer plinth for 5 MVA transformer of size 3.5 x 3.5 x 1.5 mtr. including cost of all material as per drawing. |
| 47 | Earthing of 5 MVA power transformer body earthing, including cost of G.I. strip,G.I. pipe 1.5” dia 40’ long and other earthing materials required.(Delta type earthing) |
| 48 | Earthing of equipments like control Panel(1),11KV VCB I/C (1),LA(1) including cost of G.I. strip,G.I. pipe 1.5” dia 40’ long and other earthing materials required.(Delta type earthing) |
| 49 | Jointing charges of 11 KV “XLPE” C/J kit 3 x 300/185 mm2 indoor/Outdoor type |
| 50 | Neutral earthing of 5 MVA transformer complete including cost of G.I. strip, G.I. pipe 1.5” dia 40’ long and other earthing materials (delta type earthing) |
| 51 | Erection & grouting of G.I. Stand For neutral earthing of 5 MVA transformer with help of G.I. strip 50 x 8 mm and copper flexible bond etc. |
| 52 | Erection & grouting of GI cable stand and welding of M.S. flat at equal distance for fastening cable by clamp with nuts and bolts mounting of cable at cable stand and connection of T/F Bushings. |
| 53 | Installation of 33 KV control panel for “VCB” with complete earthing with installation of battery and battery charger in control room and making connection. |
| 54 | Laying of 11 KV “XLPE” power cable 3 x 300 mm2 / 185 mm2 mm2 including digging of pits of xize 0.5 x 0.5 mtr. covering of cable with sand and 1st class brick around the cable. |
| 55 | Laying of 11KV ‘XLPE’ cable in air after providing 6” dia. M.S G.I pipe 3 m long Complete work. |
| 56 | GI Pipe Earthing Complete for Cable jointing Kit with materials |
| 57 | Shifting of 11 KV switchgear to control room and placing in control room with grouting of bolts and mounting of switchgear panels properly. |
| 58 | Electrical connection of 11 KV switchgear panel and fitting of Bus Bar and P.T. |
| 59 | Testing of 11 KV switchgear panel in all respect. |
| 60 | Laying of various typt of control cables |
| 61 | Making of control cable trench in switchyard including cost of sand and 1st class bricks size 0.3m wide X 0.5m depth.with hanger and RCC covering plate |
| 62 | Erection, grouting and mounting of “VCB” Structure, fitting of “VCB” on erected structure with complete earthing. |
| 63 | Erection, grouting and mounting of CT structure. fitting of “CT” on erected structure with complete earthing. |
| 64 | Erection grouting and earthing of following structure. |
| 65 | 33 KV Bus Isolator structure |
| 66 | 33 KV fuse set structure |
| 67 | 33 KV Post insulator structure |
| 68 | 33 KV L.A. structure |
| 69 | Mounting and fitting of equipment on erected structures. |
| 70 | 33 KV Bus – Isolator 400 Amp. |
| 71 | 33 KV Post Insulator |
| 72 | 33 KV LA |
| 73 | 33 KV fuse set ( Copper strip as required size for 33 KV fuse set) |
| 74 | Earhing of outdoor type switchyard earthing for newly erected structure as per proper specification with GI Earthing strip. |
| 75 | Jumpring form 33 KV Bus bar to post insulator, bus isolator, VCB, CT and LA to 5 MVA transformer etc.( Providing alluminium Lug and PG Clamp) |
| 76 | Providing of Generator on Rent Basis for Testing of Power Transformer and Related other Equipment.etc |
| 77 | Construction of approach road inside the switchyard 1.5 Mtr. wide with 1st class bricks on edge soling and tipping complete work including cost of all materials. |
| 78 | Dismantling of existing pale fencing and resetting after completion of transformer work. |
| 79 | Erection of double pole on 8.5 mtr.long PCC pole & mounting of all its accessories etc.complete work. |
| 80 | Painting of newly erected structure in switchyard (Applying on coat of good quality red oxide & aluminium paint) |
| 81 | Concreting of Stay |
| 82 | Concreting of Support (0.268 CuM) |
| 83 | Construction of Fire Wall between Transformers |
| 84 | Commissioning of 11 KV panels |
| 85 | Work-02 increasing capacity (2x5 MVA TO 1X10+1x5 MVA) of 33/11 K.V. Sub–Station RanipurPART - A- MATERIAL PROVIDED BY CONTRACTOR |
| 86 | 11 KV cable jointing kit 3×300 mm outdoor |
| 87 | 11 KV cable jointing kit 3×300mm indoor |
| 88 | 33 KV cable jointing kit 3×300 mm outdoor |
| 89 | 33 KV Top Channel for 33 KV Cable Rising |
| 90 | Armoured Copper Control Cable 2×2.5 mm2 |
| 91 | Armoured Copper Control Cable 4×2.5 mm2 |
| 92 | Structure For cable support |
| 93 | \\"L\\" Type Structure for Neutral |
| 94 | P.G Clamp For Dog |
| 95 | PART - B WORKShifting & loading of following materials on private truck at store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Ranipur , Distt-Gorakhpur & Unloading of the same with proper stacking (Distance about 0 to 60 km) |
| 96 | 33KV Single T/F Control Panel |
| 97 | 33 KV VCB 800A, 750 MVA with Steel Structure |
| 98 | 33 KV C.T 200/100/1A |
| 99 | 33 KV LA |
| 100 | Structure of 33 KV LA |
| 101 | 90 Ib,Rail pieces (44.64 Kg/M) |
| 102 | ACSR Dog Conductor |
| 103 | 33 KV XLPE Cable 3×300 mm2, |
| 104 | 11 KV XLPE Cable 3×300 mm2, |
| 105 | 11 KV Bus Coupler |
| 106 | Repairing of plinth and foundation for 10 MVA transformer as per requirement. Dismantling of T/F all fitting& connection, Rail pieces and T/F shifting to another place by crane. |
| 107 | Earthing of 10 MVA power transformer body earthing, including cost of G.I. strip,G.I. pipe 1.5” dia 40’ long and other earthing materials required.(Delta type earthing) |
| 108 | Earthing of equipments like control Panel(1),11KV VCB I/C (1),LA(1) including cost of G.I. strip,G.I. pipe 1.5” dia 40’ long and other earthing materials required.(Delta type earthing) |
| 109 | Jointing charges of 11 KV “XLPE” C/J kit 3 x 300/185 mm2 indoor/Outdoor type |
| 110 | Neutral earthing of 10 MVA transformer complete including cost of G.I. strip, G.I. pipe 1.5” dia 40’ long and other earthing materials (delta type earthing) |
| 111 | Erection & grouting of G.I. Stand For neutral earthing of 10 MVA transformer with help of G.I. strip 50 x 8 mm and copper flexible bond etc. |
| 112 | Erection & grouting of GI cable stand and welding of M.S. flat at equal distance for fastening cable by clamp with nuts and bolts mounting of cable at cable stand and connection of T/F Bushings. |
| 113 | Installation of 33 KV control panel for “VCB” with complete earthing with installation of battery and battery charger in control room and making connection. |
| 114 | Laying of 11 KV “XLPE” power cable 3 x 300 mm2 / 185 mm2 mm2 including digging of pits of xize 0.5 x 0.5 mtr. covering of cable with sand and 1st class brick around the cable. |
| 115 | GI Pipe Earthing Complete for Cable jointing Kit with materials |
| 116 | Shifting of 11 KV switchgear to control room and placing in control room with grouting of bolts and mounting of switchgear panels properly. |
| 117 | Electrical connection of 11 KV switchgear panel and fitting of Bus Bar and P.T. |
| 118 | Testing of 11 KV switchgear panel in all respect. |
| 119 | Laying of various typt of control cables |
| 120 | Mounting & fitting of “VCB” on erected structure with complete earthing. |
| 121 | Mounting & fitting of “CT” on erected structure with complete earthing. |
| 122 | Erection grouting and earthing of following structure. |
| 123 | 33 KV L.A. structure |
| 124 | Mounting and fitting of equipment on erected structures. |
| 125 | 33 KV LA |
| 126 | Jumpring form 33 KV Bus bar to post insulator, bus isolator, VCB, CT and LA to 10 MVA transformer etc.( Providing alluminium Lug and PG Clamp) |
| 127 | Providing of Generator on Rent Basis for Testing of Power Transformer and Related other Equipment.etc |
| 128 | Temporary cable laying of 33 KV 3x300sqmm XLPE Cable with all related fitting & structures as per Norms |
| 129 | Dismantling of old Transformer from plinth and kept aside in switchyard |
| 130 | Painting of Sub-Station structure & Equipment |
| 131 | Dismantling of Bus bar Jumpers, different earthings of existing 5 MVA T/F. etc. complete work and restringing of all connection. |
| 132 | Dismantling of existing pale fencing and resetting after completion of trnasformer work. Please Enable Macros to View BoQ information |