|
| 1 | Carriage, loading-unloading with proper stacking of following material from Central Store /department store to Site distance approx 20 Km. |
| 2 | ST Pole 11 Mtr. Long |
| 3 | PCC Pole 8.5 Mtr |
| 4 | 11 KV Polymeric Pin INSULATOR with Nut |
| 5 | ABC(3X95+1X70+1X16)/ (3x120+1x95+1x16) Sqmm. |
| 6 | LT XLPE (1x400/630)SQMM |
| 7 | Distribution Transformer 250 KVA |
| 8 | 11 KV 3x70 sq.mm XLPE cable |
| 9 | 11 KV cable box O/D |
| 10 | LT DISTRIBUTION BOX with clamp |
| 11 | Laying of LT XLPE (1x240/400/630)/ (3.5x240/ 400/ 630) Sqmm.Sqmm cable with Material. (Only Cable shall be supplied by department) |
| 12 | Stringing & sagging of AB Cable (3x95+1x70+1x16) /(3x120+1x95+1x16) Sqmm with proper jumpring and connections with required Clamps, jumpers, piering connector. (Cost of clamps etc. shall be borne by contractor) (Only Cable shall be supplied by department) |
| 13 | Mounting of 250 KVA Transformer on plinth with making all connections & fixing all requisite items/equipments as per RESSPO,s specn and safe energizsation after connecting body & neutral of transformer to earth. only transformer shall be supplied by deptt. |
| 14 | Boring type earthing of 11/0.4 KV Substation by boring and lowering of 100 fit deep 1.5” dia B Class Jindal make GI Pipe its connection in between transformer and boring with G.I. Strip of size 50x6 mm (All the material will be arranged by the contractor) (Earthing value should be 1 ohm. |
| 15 | Fabrication, erection of wire mesh fencing 2.0 Mtr. Height, on cements boundry of height 1.0 fit. including grouting of fabrication MS Angle 50x50x6 mm. Painting of fencing and support with all material as per specification around 11/.4 KV Sub-Station. (All material shall be supplied by the contractor.) |
| 16 | Fabrication, erection of single 11 Mtr ST/8.5 PCC Pole with fixing of necessary clamps, accessories required including supply & fixing of clamp, nuts & bolts, Grouting with cement, sand, brick ballast in ratio :1:4:8 and earthing as per RESPO specification & direction of E/I with fixing of T-off with fitting & tapping pole. (Only Pole shall be Supplied by the deptt.) |
| 17 | Construction of Transformer plinth of size 2x2x1.5 meter with the help of first class brick and masonry in the ratio 1:4 cement & sand coare. Filling the structure completely as per norms with RCC top 1:1:2 cement, sand coarse and stone grith with MS Bar and MS channel for resting transformer wheel 2x(125x65x2000)mm and plaster. (All material shall be arranged by the contractor.) |
| 18 | Construction of massonary type distribution piller box with first class brick ballast cement coarse sand, local sand, brick ballast and MS round bar of 10 mm. Dia including fixing of 3 Nos 500 Amp/650 Volt fuse unit with Copper Busbar etc. (All material shall be supplied by the contractor.) |
| 19 | Providing and fixing of copper L Pieces with suitable nuts and bolt for 250 kva transformers with proper disconnection and reconnection. |
| 20 | Fabrication erection of Substation D/P on 9/11 Mtr. ST pole Long with fixing of necessary clamps accessories required including supply and fixing of straight MS Channel 100x50 mm. (2240 mm long ) one Nos with arrangement of fixing 3 Nos. pin insulator,(ST pole/ PCC Pole supplied by the deptt). |
| 21 | Earthing of poles as per RESPO Norms with earth rod (All the material supplied by the contractor ) |
| 22 | Grouting of ST/PCC pole |
| 23 | Painting of ST/PCC pole |
| 24 | Providing and fixing of TPMO |
| 25 | Providing and fixing DO fuse set |
| 26 | Providing and Fixing of M.S. channel |
| 27 | Making of bus-bar on double pole with the help of M.S. channel, M.S. T-off, pin & pin insulator |
| 28 | Providing and fixing ALU LUG off Size. |
| 29 | Providing and fixing of danger board |
| 30 | Providing & Fixing of Suspension clamps (Insulated) with bolts & nut. |
| 31 | Providing & Fixing of dead emd clamps (Insulated) with bolts & nut. |
| 32 | Providing & Fixing of of LT Clamp with bolts & nut. |
| 33 | Providing & Fixing of LT piercing connector 120/150 sqmm |
| 34 | Providing & Fixing of connecting lead |
| 35 | Supply and fixing at different size nuts and bolt |
| 36 | Gravels (Pebbles stone/Rivers peebles/Crushed granite) inside 11/0.4 Sub-Station area B/W Plinth & Fencing. |
| 37 | Laying of 11 KV 3x70 sq.mm XLPE cable by manual method |
| 38 | Disconnection and reconnection work. |
| 39 | Grouting & concreting of stay rod 1800x16 mm. Fixing , tighting and nozzling of stay wire with the pole of required tension with clamps as per RESPO schedule, complete in all respects(All material shall be arranged by the contractor.) |
| 40 | Note : If, due to any circumstances, the plinth construction work is not feasible, then the 250 KVA transformer shall be installed on a double pole arrangement as per requirement. The cost of this work shall also be equivalent to the cost of plinth construction. Please Enable Macros to View BoQ information |