| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: Superintending Engineer, Kanupur Rehabilitation Camps & Building Division, Basudevpur,Dist-Keonjhar Name of Work:- “Construction of Boundary wall around Tarini Colony at Kanupur Irrigation Colony at Basudevpur of K.I.P.” Contract No: SE, KRC & BD-05/2026-2027 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER# NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # SlNo. Item Description Item Code / Make Quantity Units Estimated Rate inRs. P. Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT Rs. P. TOTAL AMOUNT In Words |
| 2 | Earth work in excavation of foundation in all kinds of soil such as stoney earth, gravels mixed with stone and boulders not exceeding 0.014cum in volume within 50mtr initial lead and 1.50mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department. |
| 3 | Filling in foundation & plinth with sand watered & rammed including cost, conveyance , royalty of all materials , labour charges, t&p required for the work etc. All complete & as per the direction of the Engineer-in-Charge. |
| 4 | C.C.(1:3:6) with 40mm size H.G metal including cost, Conveyance, royalty of all materials with curing, labour charges & T&P etc. All complete as per the direction of the Engineer-in-Charge. |
| 5 | Reinforced cement concrete M-20 with 20mm size & down graded h.g crusher broken chips for R.C.C works including hoisting & laying including cost, conveyance royalty of all materials t&p required for the work, curing labour charges etc all complete (excluding cost of steel) & as per the direction of the Engineer-in-Charge. |
| 6 | Rigid & smooth centering & shuttering for R.C.C. works including false works & dismantling them after casting including cost, conveyance, royalty, taxes of all materials, t&p. required for the work etc all complete. (a). Foundation fotting & column base, precast |
| 7 | (b). Column & beam |
| 8 | Brick work with fly ash brick in C.M (1:6) in superstructure including cost conveyance of all materials,curig labour charges, T & P. required for the work etc. all complete & as per the direction of the Engineer-in-charge. (a). Foundation & plinth |
| 9 | (b) Super Structure |
| 10 | 12mm (1/2\\") thick cement plaster ( 1:6) finished smooth to outside smooth surface of brick walls after rackingout the joints including watering and curing etc. scaffolding if requiredetc. complete with cost, conveyance, royalities of all materials with cost of all labour with T&P required for the work etc. complete as directed by Engineer-in-charge. |
| 11 | 16mm thick C.P (1:6)in all floors finished smooth to inside rough surface of brick walls with scafolding after racking out the joints including watering,curing cost ,conveyance, royalities of all materials and cost of all labour T&P required for the work complete in all respect and as directed by the Engineer-in-charge. |
| 12 | Cutting , straightening, coiled or bent up M.S Rod or Tor steel bending, binding welding and joinging if necessary and tying the grills and placing in position as required for RCC work and providing fan hooks hoisting lowering and including cost, conveyance and taxes of M.S rods or tor steel and binding wire of 18 to 20 gause required for the work for bending, binding and tying the grills (payment will be made on weight of M.S Rod or Tor steel only and no separate payment will be made towards the weight of binding wire) etc. complete as directed by the Engineer-in-charge . |
| 13 | Priming one coat with any approved primer both inside and out side wall including cost of primer, labour, T & P etc complete as per the direction of the Engineer-in-charge. |
| 14 | Painting two coat with weather coat over one coat of primer including cost,coveyance,royality & T& P materials labour etc.complete as per the direction of the Engineer in charge. |
| 15 | Painting two coats with approved Enamel paints on new work over priming one coat with approved primer including cost, conveyance, royalty of all materials, labour charges, t&p required for the work etc all complete as per the direction of the Engineer-in-charge. |
| 16 | Filling foundation & plinth with excavated material well watered and rammed including all carriage, royalty,T&P and labour charges etc. complete as per the direction of the Engineer-in-charge. Total in Figures 3876734.84 3876734.84 INR Thirty Eight Lakh Seventy Six Thousand Seven Hundred & Thirty Four and Paise Eighty Four Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |