|
| 1 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil including stony earth, gravel, moorum, etc. interspread with boulder up to 0.50 cum. size with lifts and delifts including trimming of slope and bed to design section, dressing and depositing the excavated materials away from work site within an initial lead of 1 km from the place of excavation including supplying and maintenance of equipments, haul roads and approach roads, T&P materials etc. all complete as per the approved design, drawing, specification and direction of the Engineer-in-charge. |
| 2 | Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014 cum in volume within 50 m initial lead and 1.5 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth with supply of all labour, all taxes as per norm and T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge. |
| 3 | Cutting in D.I rock not requiring blasting to be removed by pick axes and crow bars and depositing materials within 50m initial lead and 1.5m initial lift including rough dressing, stacking the useful materials separately with supply of all labour, all taxes as per norm and T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge. |
| 4 | Fixing 25mm dia anchor bars in foundation rock including drillind 35mm dia holes. Fixing wedged anchor and grouting with cement mortar 1: 4 including cost of M.S.rods for dams, barrages and power house structure including pull testing of 30% of anchors.( Depth of holes only to be measured for payment purpose)with supply of all labour, all taxes as per norm and T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge. |
| 5 | Filling foundation & plinth with excavated earth including watering & ramming to all heights with all leads & lifts with supply of all labour, all taxes as per norm and T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge. |
| 6 | Cement Concrete M15 grade using 20mm and downgraded, crusher broken hard granite stone aggreagate of approved quality quarried,free from weathered skin, quarry debris and foreign materials, using clean and sharp sand of approved grading and quality confirming to the designed specifications including hoisting & lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with vibrator and finishing the exposed surface smooth, curing for required time, providing beads and grooves wherever necessary including cost, conveyance, royalty and other taxes of all materials, with all cost of tools and plants, cost and carriage of water etc, with supply of all labour, taxes as per prevailing norm and supervision charges including mobilization & demobilization of men & machinaries, T&P with all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge. |
| 7 | Reinforced Cement Concrete M20 grade for RCC works on approved surface or shape and size using 20mm and downgraded, crusher broken hard granite stone aggreagate of approved quality quarried,free from weathered skin, quarry debris and foreign materials, using clean and sharp sand of approved grading and quality confirming to the designed specifications including hoisting & lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with vibrator and finishing the exposed surface smooth, curing for required time, providing beads and grooves wherever necessary including cost, conveyance, royalty and other taxes of all materials (excluding cost of M.S. rod, carriage and labour for cuttin, bending, binding and fixing of M.S. rod ) with all cost of tools and plants, cost and carriage of water etc, with supply of all labour, taxes as per prevailing norm and supervision charges including mobilization & demobilization of men & machinaries, T&P with all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge. |
| 8 | Supplying, fitting & placing HYSD bars reinforcement and tying the grills as per approved design and specification placing in position including providing lapping where necessary and supplying of binding wire 18 to 20gauge with supply of all labour, taxes as per prevailing norms and T&P required for the work etc. complete in all respect directed by the Engineer -in-charge. |
| 9 | Providing rigid, smooth centring & shuttering for concrete works including false work and including cost, conveyance, royalty & other taxes of all materials required for the work complete in all respect and dismentaling the same after casting and curing with water for specified period including depositing the debris clear of work site with all leads & lifts, delifts including supply of all labur, all taxes as per prevailing norms and T&P required for the work etc. complete in all respect as directed by the Engineer in-charge. |
| 10 | Rough stone dry packing in aprons and revetments to all heights using hard granite stone of size 15cm - 30cm of approved quality,quarried, free from weathered skin including filling the interstices with smaill stone wedges including cost, conveyance, royalty to proper slope and level complete in all respect as directed by the Engineer-in-charge.(Minimum 1/6 volume will be deducted towards voids) |
| 11 | Providing pressure release pipe and weep holes in plain Reinforced concrete Abutment, Wing,/return diametre UPVC Pipe, extending throud Motion photo structure with slope of 1V:20H towards drawing force with all leads & lifts, delifts including supply of all labur, all taxes as per prevailing norms and T&P required for the work etc. complete in all respect as directed by the Engineer in-charge. Please Enable Macros to View BoQ information |