| 1 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002. Manual Means |
| 2 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate.By Mechanical Means |
| 3 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 4 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means. In area of non-thorny jungle |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401.For Grading I Material |
| 6 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 7 | Providing and laying rounded hump type speed breakers for crossing speed 25 km/h as per IRC design including providing and applying bitumen emulsion tack coat, making speed breaker in designed profile with bituminous macadam, providing seal coat type B for sealing the voids and marking chequered pattern with thermoplastic paint complete as per IRC : 99-1988. 3.70 meter wide and 10 cm high for general traffic |
| 8 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 801.3.1, fixed over aluminium sheeting, 1.5 mm thick supported on GI pipe 50 mm dia firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and MoRTH Specification Clause 801 |
| 9 | 600 mm circular |
| 10 | 600 mm x 450 mm rectangular |
| 11 | Marking Centre Line and stop lines etc. on road as per IRC pattern with thermoplastic paint of approved quality and make with 8% glass beads laid on the road surface at temperature 160\\" C with a special applicator machine complete with a special applicator machine complete with labour material and traffic diversion arrangements. |
| 12 | Supply of Hazard Marker made out of 2 mm thick M.S. sheet size 300x300x3 mm framed with angle iron 25x25x3 mm and fixed on channel posts 75x40x6 mm and hold fast at bottom whole body is painted in white stoving enamel and 6 Nos., 5 cm dia reflective sheet on white reflective background with additionalborder of 1.25 cm all arount it. |
| 13 | White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per MoRTH specifications Clause 800 |
| 14 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 15 | Barricading with sal ballies as per design including tying with vertical posts by coconut strings complete in all respect with two horizontal members and vertical supports upto 2.5m centre to centre and for 3 days period including removal and cleaning the site complete in all respect. Height 1.2m upto 1.5m above ground level, Labour Charge, Complete |
| 16 | Hydraulic Excavator 0.9 cum output 100 Cum/h |
| 17 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Clause 5.3.7.2 of IRC:89, no fragment weighing less than 25 kg laid dry complete as per drawing and MoRTH specifications Clause 2503.2 Please Enable Macros to View BoQ information |