| 1 | Item Wise BoQ BoQ_Ver3.0 Item Wise Normal INR Only INR Select, Excess (+), Less (-) Tender Inviting Authority: SE(P&W),SGTPS, MPPGCL,Birsinghpur Name of Work: Work Contract for AOH/COH of Pressure Part of Boiler of Unit No. 1 to 4 at SGTPS, MPPGCL, Birsinghpur Contract No: 2026_MPPGC_505931_1 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(DOMESTIC TENDERS - RATES ARE TO BE GIVEN IN RUPEES (INR) ONLY)(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # TEXT TEXT NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Particulars of Work Work No Tendered quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Unit Rate inRs. SAC Code Applicable CGST(In %) Applicable SGST(In %) IGST Rate on Basic Rate and P&F Charges in percentage Applicable IGST(In %) CGST Rate on freight in percentage IGST Rate on freight in percentage CGST Rate on freight in percentage Packing & forwording charges inRs. Frieght upto Destination in Rs IGST Amount on Basic Rate and P&F Charges in Rs CGST Amount on Basic Rate and P&F Charges in Rs Applicable CGST(In Rs) Applicable SGST(In Rs) CGST Amount on freight charges in Rs Applicable IGST(In Rs) TotalUnit Rate in Rs TOTAL AMOUNT Without Taxescol (13) = (4) x (7) inRs. P Total Amount (IncludingTaxes)Rs. P TOTAL AMOUNTIn Words |
| 2 | CLEANING OF BOILER |
| 3 | COMPLETE EXTERNAL CLEANING OF BOILER FROM TOP TO BOTTOM |
| 4 | INTERNAL CLEANING OF BOILER IN IIND PASS |
| 5 | CLEANING OF ASH FROM ECONOMISER HOPPER WITH CONNECTING DUCTS |
| 6 | CLEANING OF PENT HOUSE, CAT HOUSE, DEAD CHAMBER |
| 7 | BOTTOM ASH HOPPER CLEANING |
| 8 | PREPARATION OF SCAFFOLDING |
| 9 | PREPARATION OF SCAFFOLDING ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER COILS |
| 10 | PREPARATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE (FROM TOP TO BOTTOM) along with providing cup-lock system by firm |
| 11 | PREPARATION OF SCAFFOLDING IN BOTTOM ASH HOPPER |
| 12 | INSPECTION |
| 13 | INSPECTION OF COMPLTE BOILER PRESSURE PARTS (IST & IIND PASS) |
| 14 | INSPECTION & REPAIR OF ALL DOORS ,WINDOWS AND PEEP HOLES IN BOILER |
| 15 | HEADER INSPECTION & INSPACTION OF SPRAY NOZZLE ATTEMPERATOR |
| 16 | INTERNAL INSPECTION & CLEANING OF BOILER DRUM |
| 17 | CLEANING AND REPAIR OF WIND BOX |
| 18 | WITH STEEL |
| 19 | WITHOUT STEEL |
| 20 | DYE PENETRATION TEST (DP TEST) WITH KIT |
| 21 | HYDRO JET CLEANING OF COMPLETE BOILER PRESSURE PARTS |
| 22 | PLATEN SUPERHEATER COILS. |
| 23 | PENDENT RE-HEATER COILS. |
| 24 | FINAL SUPERHEATER |
| 25 | WATER WALL ( FRONT, REAR, LEFT & RIGHT, ROOF) |
| 26 | SECTION B |
| 27 | ASSISTANCE IN RADIOGRAPHY |
| 28 | RECTIFICATION, REPLACEMENT AND REFIXING OF CASSETTE BAFFLES IN VARIOUS AREAS OF BOILER TUBES. |
| 29 | EROSION SHIELD |
| 30 | FABRICATION & FIXING OF EROSION SHIELD |
| 31 | FIXING OF EROSION SHIELD |
| 32 | REMOVAL OF EROSION SHIELD |
| 33 | PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY/OXIDE SCALE MEASUREMENT/STRESS RELIEVING |
| 34 | WELDING OF HP JOINTS OF BOILER TUBES |
| 35 | WATER WALL TUBES-SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC. |
| 36 | PRIMARY SUPERHEATER TUBES |
| 37 | PLATEN SUPERHEATER TUBES |
| 38 | FINAL SUPERHEATER TUBES |
| 39 | HORIZONTAL REHEATER |
| 40 | PENDANT REHEATER |
| 41 | ECONOMIZER TUBES |
| 42 | SLING |
| 43 | RISER |
| 44 | BLEED |
| 45 | HYDRASTEP |
| 46 | INSTRUMENT PIPINGS |
| 47 | WELDING OF FINS |
| 48 | ECONOMISER/WATER WALL/CAGE WALL |
| 49 | SLING |
| 50 | REHEATER |
| 51 | DRUM VENT |
| 52 | WELDING & REPLACEMENT OF DRAIN & VENTS JOINTS |
| 53 | WELDING & REPLACEMENT OF TRACING LINE / SAMPLING LINE |
| 54 | REPLACEMENT OF COILS- Primary Super Heater(Bottom/Middle/Top) |
| 55 | PAD WELDING OF ERODED TUBES OF VARIOUS SIZE |
| 56 | PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS (SIZE 50MM X 50MM) |
| 57 | PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS (SIZE 50MM X 100MM) |
| 58 | PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS (SIZE 50MM X 300MM) |
| 59 | ALIGNMENT OF COILS/ TUBES / BLOWERS |
| 60 | ALIGNMENT OF COILS OF SH DIVISIONAL PANEL/FINAL |
| 61 | ALIGNMENT OF COILS OF PLATEN SUPERHEATERS |
| 62 | ALIGNMENT OF COIL OF ECONOMISER |
| 63 | ALIGNMENT OF COIL OF LTSH (UPPER / LOWER) / PRIMARY SH |
| 64 | ALIGNMENT OF REHEATER COIL (HORIZONTAL / PENDENT) |
| 65 | ASSISTANCE IN HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP |
| 66 | APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GR.A+GR.C+PLASTIC) |
| 67 | BURNER MOUTH |
| 68 | APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE C + PLASTIC) |
| 69 | PENT HOUSE, DOOR, WINDOW MANHOLE & PEEPHOLE, ETC |
| 70 | DEAD CHAMBER & SCREEN VALVE |
| 71 | COOLING PIPE OF SEAL PLATE (BOTTOM ASH HOPPER) |
| 72 | OTHER AREAS (LIKE HOPPER HEADER ETC.) |
| 73 | REMOVAL / BREAKING OF DAMAGED REFRACTORY & TRANSPORTATION |
| 74 | SECTION C |
| 75 | GLAND PACKING OF HP VALVES |
| 76 | UPTO 25 MM |
| 77 | 25 MM TO 50 MM |
| 78 | 50MM TO 100 MM |
| 79 | 100 MM TO 200 MM |
| 80 | COMPLETE SERVICING OF VALVES (EXCLUDING ACTUATOR): |
| 81 | UPTO 25 MM |
| 82 | 25 MM TO 50 MM |
| 83 | 50 MM TO 100 MM |
| 84 | 100 MM TO 200 MM |
| 85 | REPLACEMENT OF VALVES (WELDED TYPE) |
| 86 | UPTO 25 MM |
| 87 | 25 MM TO 50 MM |
| 88 | 50 MM TO 100 MM |
| 89 | 100 MM And Above |
| 90 | SERVICING OF MAIN STEAM STOP VALVE |
| 91 | SERVICING OF VALVE/CONTROL VALVE OF FEED REGULATING STATION IN-SITU |
| 92 | REPLACEMENT OF FEED CONTROL VALVE/safety valve |
| 93 | SECTION D |
| 94 | COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES (SV) |
| 95 | BOILER DRUM SV |
| 96 | MAIN STEAM LINES SV |
| 97 | CRH LINES SV |
| 98 | HRH LINES SV |
| 99 | BAS LINE SV |
| 100 | SECTION E |
| 101 | PREPARATION / FABRICATION OF HP TUBE BENDS |
| 102 | REPAIR OF PENT HOUSE OF BOILER |
| 103 | REPAIR OF PENT HOUSE BY PATCHING (WITHOUT STEEL) |
| 104 | DISMANTLING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL) |
| 105 | REPAIRING OF DEAD CHAMBER |
| 106 | WITH STEEL |
| 107 | WITHOUT STEEL |
| 108 | REPAIR & SERVICING |
| 109 | BUCKSTAYS |
| 110 | DIAMOND TYPE LOCKS |
| 111 | ROCKERS |
| 112 | REPAIRING OF ECONOMISER HOPPERS & CONNECTION JOINT DUCTING & MAKING / STREGNTHEN OF THEIR PLATEFORM |
| 113 | WITH STEEL |
| 114 | WITHOUT STEEL |
| 115 | REPAIRING OF ECONOMIZER CASING |
| 116 | WITH STEEL |
| 117 | WITHOUT STEEL |
| 118 | REPAIRING OF BOTTOM ASH HOPPER LINER & SEAL TROUGH INCLUDING FIXING OF DIPPER PLATE |
| 119 | WITH STEEL |
| 120 | WITHOUT STEEL |
| 121 | REPAIRING OF FURNACE ZONE & REST OF THE AREAS |
| 122 | WITH STEEL |
| 123 | WITHOUT STEEL |
| 124 | REPAIRING OF SECOND PASS CASING |
| 125 | WITH STEEL |
| 126 | WITHOUT STEEL |
| 127 | DISMANTLING, INSTALLATION, FEBRICATION OF STRUTURE & MISC. WORKS I.E. CANOPY, BROKEN STAIR/RAILING/DRAIN COVERING ETC. |
| 128 | REPLACEMENT / STRENGTHENING OF BAFFLE PLATE BETWEEN PRIMARY SUPER HEATER & HORIZONTAL RE-HEATER |
| 129 | WITHOUT STEEL |
| 130 | REPAIRING/SEALING OF CAT HOUSE |
| 131 | WITH STEEL |
| 132 | WITHOUT STEEL |
| 133 | INSTALLATION OF MITP |
| 134 | SERVICING, CLEANING & REPAIRING OF SAMPLING LINE COOLERS |
| 135 | SERVICING & REPAIRING OF HANGERS & SUPPORTS |
| 136 | REPAIRING OF Tapper DUCT & NEAR BY AREAS |
| 137 | WITH STEEL |
| 138 | WITHOUT STEEL |
| 139 | SECTION-F |
| 140 | REPAIRING OF RE-HEATER & SUPER HEATER AERO DYNAMIC DAMPER INCLUDING TOP / BOTTOM & NEAR BY AREAS |
| 141 | WITH STEEL |
| 142 | WITHOUT STEEL |
| 143 | DISPOSAL OF RUBBISH THERMAL INSULATION |
| 144 | Insulation Work |
| 145 | REMOVAL & APPLICATION OF THERMAL INSULATION IN COMPLETE BOILER FROM BOTTOM ASH HOPPER TO PENT HOUSE |
| 146 | REMOVAL & APPLICATION OF THERMAL INSULATION IN STEAM AND WATER PIPING |
| 147 | REMOVAL & APPLICATION OF THERMAL INSULATION IN ESP |
| 148 | REMOVAL & APPLICATION OF THERMAL INSULATION INAIR HEATER & HOPPER |
| 149 | COAL MILL, FUEL OIL AND ITS STEAM PIPING INCLUDING HEATERS FILTERS ETC. |
| 150 | FLUE GAS & HOT AIR DUCT Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select % 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |