| 1 | Supplying of Security guard without gun (8 hours shift duty per day) for watch and ward round the clock and also to attend the Misellaneous works at Horticultural Centre-cum-Holiday Home at Araku etc., as required and as directed by Engineer-in-charge, complete. |
| 2 | Supply of labour (unskilled) for maintenance of lawns and gardens and to work in any site conditions etc., as required and as directed by the Engineer-In-Charge,complete. |
| 3 | Supply of labour (unskilled) of Gardeners for maintenance of Guest House premises round the clock and also to attend the misc. works at Horticultural Centre-cum-Holiday Home at Araku etc..,as required and as directed by the Engineer-in-Charge,complete. |
| 4 | Hedge/Shrub planting: Digging the trench of size 0.3 meters depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1ratio, and pesticides etc (@ 20gms/pit/sqmt) and it including the application of fertilizers, labour charges, required tools, overheads & contractors profit complete for finished item of work, but excluding the cost of fertilizers @20 gms/pit/sqmt) and plant material etc., unit 1sqmt of work. (Red garden soil in this context it is defined as sandy loamy soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral as required and as directed by the Engineer-in-charge, complete including all labour and tools. |
| 5 | Supplying and stacking of good earth at site of work etc., as required and as directed by the Engineer-in-charge complete. All labour and materials. |
| 6 | Supplying, stacking and spreading 6 mm thick red bajri, watering and rolling complete including preparation of the surface and rolling with road roller/hand roller etc., as required and as directed by the Engineer-in-charge complete. All labour and materials. |
| 7 | Cleaning jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30cm measured at a height of 1m ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared etc., as required and as directed by the Engineer-in-charge complete. |
| 8 | Supply and Delivery of topiary/trees/palms/shrubs/lawn/ground covers and specified plants as per directed by Engineer- in -charge/Horticulturist at site including cost of plants. (Heights mentioned above are excluding bag height. All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off. The rate inclusive of cost of plants complete for finished item of work, plants of bag size: 8''x10'' of plant height not less than 3 feet, 13''x13'' of tree/plant height not less than 5 feet, 13''x13'' of plant (Hedges and shrub) height not less than 2 feet. |
| 9 | Plant name/Shrubs: Spider lilly 13\\"x13\\" |
| 10 | Ixora singaporensis 13\\"x13\\" |
| 11 | Mini ixora 13\\"x13\\" |
| 12 | Plumeria pidica 13\\"x13\\" |
| 13 | Hibiscus 13\\"x13\\" |
| 14 | Acalypha 13\\"x13\\" |
| 15 | Hybrid rose 8\\"x10\\" |
| 16 | Kakinada rose 8\\"x10\\" |
| 17 | Schefflera 8\\"x10\\" |
| 18 | Petro crotons 8\\"x10\\" |
| 19 | Euphorbia milli red 8\\"x10\\" |
| 20 | Tecoma capensis 8\\"x10\\" |
| 21 | Hamelia patens 8\\"x10\\" |
| 22 | Coleus 8\\"x10\\" |
| 23 | Spider plant 8\\"x10\\" |
| 24 | Lilly 8\\"x10\\" |
| 25 | Golden durantha 8\\"x10\\" |
| 26 | Red durantha/ 8\\"x10\\" |
| 27 | Alternanthera 8\\"x10\\" |
| 28 | Pandanus gold 8\\"x10\\" |
| 29 | Transportation of bag plants form Kadiyam to. (Actual payment will paid for the actual work done subjected to approval of the weight by the Competent Authority)/ as required and as directed by the Engineer-in-charge/Horticultarist, complete. All labour and materials. Please Enable Macros to View BoQ information |