| 1 | Total of Schedule-A (NDSR Items) + Schedule-B (DSR 2023 Items) |
| 2 | Total of Schedule-A (NDSR Items) |
| 3 | Total of Schedule-B (DSR-2023 Items) OCW-2232 APPENDIX- 3A PROFORMA FOR STATEMENT OF MINOR DEVIATIONS (Refer Clause C 2.2(d) and C 15.1 of ITT) 1. The following are the particulars of minor deviations from the requirements of the Tender Document: Sr. No Clause Deviations Price reduction for each deviation/s Note : 1. The Tenderer shall indicate price reduction against each deviation in Appendix-3A of BOQ. This price is the price which the tenderer shall reduce from this tender price if deviation(s) is/are accepted by the Employer. 2. Where there is no deviation, the statement should be returned duly signed with an endorsement indicating ‘No Deviations’. In case, Performa of deviations is not submitted or submitted as blank, it will be construed that the tenderer has not proposed any deviations from tender documents. 3. It shall be noted that in case Nil/Zero/NA Price quoted by Tenderer in Appendix-3A then it shall mean that contractor has quoted same price for deviation and undeviation bid. 4. If the tenderer proposes deviations in tender documents, and/or any other terms and conditions of the tender, other than in this Appendix, it will have no effect. Signature of authorized signatory On behalf of Tenderer OCW-2232 Preamble |
| 4 | The Bill of Quantities shall be read in conjunction with Notice Inviting Tenders, Instructions to Tenderers, General and Special Conditions of Contract, Employer's Requirement, Technical Specifications and other relevant documents. |
| 5 | BoQ1 consists of two schedules i.e. Schedule ‘A’ for NDSR items and Schedule 'B' DSR-2023 items. |
| 6 | The rates and prices to be tendered in the unit Priced Bill of Quantities of Schedule ‘A’ for NDSR items and Schedule 'B' DSR-2023 items for completed and finished items of works and complete in all respect. |
| 7 | Tenderers shall quote their offer in Indian Rupees (INR) only. Tenderers are required to be quoted percentage (%) Excess/Less for Schedule-A and Schedule-B in figures in the appropriate highlighted cells in the BoQ sheet. All the quoted rates will be deemed to include Duties, Taxes, Octroi, Royalty etc., cost of all plants, labour, supervision, materials, transport, all temporary works, erection, maintenance, utility identification, contractor’s profit and establishment/ overheads, together with preparation of design and drawings, all general risks, insurance liabilities, compliance of labour laws and obligations set out or implied in the contracts. For taxes and duties refer clause C2.5 of ITT & clause 10 of SCC. |
| 8 | The price offer in the BOQ shall be given without considering any deviation mentioned in Appendix-3 of FOT i.e. price in the box shall be quoted as per tender conditions without any deviation. |
| 9 | If the tenderer fails to quote rates against any item, the tender may be treated as incomplete and non- responsive and shall be rejected. |
| 10 | Errors will be corrected by the employer for any arithmetical errors in computation or summation as per contract conditions. |
| 11 | The Financial Proposal (as per BOQ) shall be uploaded online on the website http://etenders.gov.in/eprocure/app. The rates shall be quoted in the excel file provided in the bid documents. The tenderer shall download the excel file and quote the rates against each highlighted cells in BoQ1. After quoting their rates the excel file shall be uploaded accordingly. The rates shall not be offered/quoted elsewhere in the technical submission/ tender submission. |
| 12 | The actual work executed against all the BOQ as detailed in tender document would be paid on measurement basis. |
| 13 | The contractor may raise their “On Account” payments as per relevant clause of Employer's Requirement. |
| 14 | In case of DSR item the description is given in brief and detailed description of item should be as given in DSR 2023 published by CPWD. Please Enable Macros to View BoQ information DELHI METRO RAIL CORPORATION LIMITED BOQ Name of Work - Contract No.: OCW-2232 - “Anti-carbonation painting at piers, pier caps, portals, girders, deck slabs, and viaduct segments/I-girders of the section from NSFT to NECC of Line-3E, and from YB to VASI of Line-4, including NESY Depot stabling line, for the Metro Extension from Noida City Centre to Noida Electronic City Station.” S. No. Item No. Description of Items Unit Rate (₹) Qty Amount (₹)(inclusive of GST) Amount (₹)(excluding GST) Schedule-A (NDSR Items) |
| 15 | NDSR-1 |
| 16 | c Total Amount of Schedule-A (NDSR Items) (excluding GST) 45158432.21 GST @18% 8128517.8 Total of Schedule-A (inclusive of all, GST@18%) 0.0 Total Amount of Schedule-A (NDSR Items) (inclusive of all, GST@18%) 53286950.01 Schedule-B (DSR-2023 Items) |
| 17 | 13.71 |
| 18 | Total of Schedule-B (DSR 2023 Items) (excluding GST) 6451271.19 Total of Schedule-B (DSR 2023 Items) after multiplying with CPWD factor 0.973 6277086.87 GST@18% 1129875.64 4514050.0 Total of Schedule-B (DSR 2023 Items) (inclusive of all, GST@18%) 7406962.51 125112.75 Total of Schedule-A (NDSR Items) + Schedule-B (DSR 2023 Items) (excluding GST) 51435519.08 Grand total of Schedule-A (NDSR Items) + Schedule-B (DSR 2023 Items) (inclusive of all, GST@18%) 60693912.52 78785.0 9097050.51 |