|
| 1 | Supplying and fixing grasses tiles of grass Maxican Carpet/Selection No. 1 Healthy & fresh grasses (size 1'x1' or bigger) including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from wees and fit for mowing including supplying good earth as required by Engineer-in-charge. (Rate includes supply of labour, tools & plants including materials) |
| 2 | Supplying and stacking sludge (adequate for Horticulture work) at site in dry cake form from approved disposal work site including royalty, all lead and lift etc. (Sludge measured in stack will be reduced by 8%). |
| 3 | Spreading of sludge, dump manure,/farm yard manure/animel dung manure and good earth in required thickness. This includes supply of labour, tools & plants excluding materials. |
| 4 | Supplying and Planting of different plant / trees ( Supplying well grown plants bushy and healthy, minimum height as specified i.e. exposed height including all leads & lift, carriage, handling, manuring, applying presticide and fertilizer etc.Furcaria veriegated 10-12 leaves in height 20-30cm in earthen pots of size 25cm. |
| 5 | China palm of leaves 4-5 in earthen pots size 25cm |
| 6 | Ficus blakii (F. Vivicon) well branched (Bushy) of height 120cm - 135 cm in earthen pot of size 30cm. |
| 7 | Adenium obesum of height 90cm-60cm in earthen pots ofsize 25cm. |
| 8 | Croton (broad leaves) 3-5 branches of height 90cm120cm in cement pots of size 30cm. |
| 9 | Hibiscus Variegated of height 60 cm to 75 cm in earthen pots of size 25 cm. |
| 10 | Areca Palm 4 - 5 suckers of height 120 cm to 135 cm in earthen pots of size 25 cm. |
| 11 | Dracaena Fragrance of height 90 cm to 60 cm in earthen pots of size 35 cm. |
| 12 | Dracaena (Song of India) of height 30 cm to 90 cm in earthen pots of size 20 cm. |
| 13 | Maintanance of trees for one year (Avenue Plants) including watering, trimming, manuring, spraying insecticide and guarding as required. This includes supply of labour, tools & plants including materials. |
| 14 | Add : GST @18% (Eighteen Percent) on Rs.2,24,591.00 i.e. Total Amount over item No. 1 to 5 |
| 15 | Add : Labour Welfare Cess @ 1 % (One Percent) on Rs.2,65,017.00 i.e. Total amount after GST over item No. 1 to 6 Please Enable Macros to View BoQ information |