| 1 | Clean removal of cement plaster from walls including all cost and conveyance labour charges etc,complete as per standard specifications |
| 2 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 3 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means |
| 4 | Painting the wall two coats with approved weather proof Exterior Emulsion paint over one primer coat on cement plastered wall surface ect., complete complying with standard specification and as directed by the departmental officers. |
| 5 | Painting Old Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over the existing wall in all floors etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 6 | Painting Old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with Two coats of best approved first quality and colour of synthetic enamel paint in all floors etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 7 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in accordance with IS 1443 over a cement mortar bed of 20mm thick in Cement Mortar 1:3 (One Cement and Three crushed stone sand) with required Cement Slurry and Mortar Plasticizer and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by ExecutiveEngineer before use on works) |
| 8 | Paving the floor with best quality vitrified Tiles of following size and variety conformingIS 15622 with water absorbtion less than 0.08% of approved colour and shade laid over cement mortar bed of 20mm thick in cement mortar 1:3 (one cement and three crushed stone sand) with required Cement Slurry and Mortar Plasticizer in all floors andthe top pointed with Water Resistant Tile Epoxy Grout etc., complete complying with standardspecification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Vitrified Tiles of Size :Variety : Stainfree Nano polished Vertified tiles 600 x 600 x 8mm |
| 9 | supplying, fabricating, erecting structural steel work for roofing welded or bolted type using MS channels, angles, plates and round bars etc. conforming to IS specification including primer coating and enamal painting as per Design given by the departmental officers etc, complete as per standard specifications. |
| 10 | supplying , fixingand roofingwith colour galvalume sheet of 0.47mmthickwith all necessaryaccessoriessuchasJ/Vboltandnutsofsuitablelengthwithsuitable bitumenwashers complete complying with standard specification and as directed by the departmental officers. |
| 11 | Repairing of generator by testing and commissioning with required overhauling components such as oil, oil filters, diesel filters and battery service the rate includes of labor,materials,transport etc complete |
| 12 | Repairing of water heater by testing and commissioning with required electrical components the rate includes of labor,materials,transport etc complete |
| 13 | Repairing of refrigerator by testing and commissioning with required electrical components such as relay, thermostat and compressor the rate includes of labor,materials,transport etc complete |
| 14 | Supplying of weighing scale by testing and commissioning with required electrical components the rate includes of labor,materials,transport etc complete |
| 15 | Repairing of RO water purifier by testing and commissioning with required components such as pump, filters , membrane, adapters the rate includes of labor,materials,transport etc complete |
| 16 | Repairing of GAS STOVE by testing and commissioning with required components such as burners the rate includes of labor,materials,transport etc complete |
| 17 | Supplying of GAS STOVE 4' x 2' by testing and commissioning with required components such as burners the rate includes of labor,materials,transport etc complete Please Enable Macros to View BoQ information |